Filings for 57579
Case Style APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN
189 filing(s).
Item | File Stamp | Party | Item Type | Filing Description |
---|---|---|---|---|
1 | 1/23/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | LTRS | REQUEST FOR A DOCKET NUMBER |
2 | 1/31/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | PL | APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN |
3 | 1/31/2025 | IBEW LU 66 | PL | Motion to Intervene |
4 | 2/1/2025 | IBEW LU 66 | PL | Protective Order Certification |
5 | 2/3/2025 | GULF COAST COALITION OF CITIES (GCCC) | PL | Gulf Coast Coalition of Cities' Motion to Intervene |
6 | 2/3/2025 | GULF COAST COALITION OF CITIES (GCCC) | PL | Gulf Coast Coalition of Cities' Protective Order Certifications |
7 | 2/3/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC , LLC | LTRS | CenterPoint Energy Houston Electric Letter to the Public Utility Commission of Texas |
8 | 2/3/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | PL | Affidavit of Michael Burleson |
9 | 2/3/2025 | PUC OPDM | PL | ORDER OF REFERRAL AND PRELIMINARY ORDER |
10 | 2/4/2025 | OPUC | PL | OFFICE OF PUBLIC UTILITY COUNSEL’S MOTION TO INTERVENE |
11 | 2/4/2025 | HOUSTON COALITION OF CITIES | PL | Houston Coalition of Cities' Motion to Intervene |
12 | 2/4/2025 | SOAH | PL | SOAH ORDER NO. 1 - JURISDICTION AND DECISION DEADLINE; REQUIRING COMMENTS ON SUFFICIENCY OF APPLICATION AND NOTICE; VIDEOCONFERENCE ATTENDANCE INFORMATION; SETTING PREHEARING CONFERENCE; ADOPTING PROTECTIVE ORDER; AND GENERAL PROCEDURES |
13 | 2/4/2025 | OPUC | PL | OFFICE OF PUBLIC UTILITY COUNSEL`S VOID LETTER TO CENTRAL RECORDS |
14 | 2/4/2025 | OPUC | PL | OFFICE OF PUBLIC UTILITY COUNSEL’S MOTION TO INTERVENE |
15 | 2/5/2025 | TIEC | PL | TEXAS INDUSTRIAL ENERGY CONSUMERS’ MOTION TO INTERVENE |
16 | 2/5/2025 | TIEC | PL | TEXAS INDUSTRIAL ENERGY CONSUMERS’ NOTICE OF FILING PROTECTIVE ORDER CERTIFICATIONS |
17 | 2/6/2025 | HOUSTON COALITION OF CITIES | MISC | Houston Coalition of Cities' Protective Order Certifications |
18 | 2/6/2025 | ERCOT | PL | ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S MOTION TO INTERVENE |
19 | 2/6/2025 | ERCOT | MISC | ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S PROTECTIVE ORDER CERTIFICATIONS |
20 | 2/10/2025 | TCUC | PL | TCUC's Motion to Intervene |
21 | 2/11/2025 | TCUC | RFI | TCUC's 1st Set of RFIs to CEHE |
22 | 2/11/2025 | PUC LEGAL | RFI | COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC, QUESTION NOS. STAFF 1-1 THROUGH STAFF 1-47 |
23 | 2/12/2025 | TCUC | PL | Protective Order Certifications - TCUC |
24 | 2/12/2025 | GULF COAST COALITION OF CITIES (GCCC) | PL | Gulf Coast Coalition of Cities' Supplemental Protective Order Certifications |
25 | 2/12/2025 | Monarch Strategic Ventures | LTRS | MSV Comment on CenterPoint's Microgrid Pilot Program |
26 | 2/12/2025 | PUC LEGAL | PL | VOID SEE ITEM 27 |
27 | 2/12/2025 | PUC LEGAL | LTRS | MEMORANDUM TO CENTRAL RECORDS TO VOID ITEM |
28 | 2/12/2025 | PUC LEGAL | PL | PROTECTIVE ORDER CERTIFICATIONS |
29 | 2/14/2025 | HOUSTON COALITION OF CITIES | RFI | HOUSTON COALITION OF CITIES’ FIRST REQUESTS FOR INFORMATION AND FIRST REQUESTS FOR PRODUCTION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC |
30 | 2/17/2025 | HOUSTON COALITION OF CITIES | PL | HCC's Protective Order Certifications |
31 | 2/17/2025 | HOUSTON COALITION OF CITIES | PL | HCC's Protective Order Certifications |
32 | 2/17/2025 | TEXAS ENERGY ASSOCIATION FOR MARKETERS | PL | Texas Energy Association for Marketers' Motion to Intervene |
33 | 2/18/2025 | OPUC | PL | OFFICE OF PUBLIC UTILITY COUNSEL’S PROTECTIVE ORDER CERTIFICATIONS |
34 | 2/18/2025 | HUNT ENERGY NETWORK L.L.C. | PL | Hunt Energy Network LLC's Motion to Intervene |
35 | 2/19/2025 | HOUSTON COALITION OF CITIES | RFI | Houston Coalition of Cities' Second Requests for Information to CenterPoint Energy Houston Electric, LLC |
36 | 2/20/2025 | TEXAS ENERGY ASSOCIATION FOR MARKETERS | PL | Texas Energy Association for Marketers' Protective Order Certifications |
37 | 2/24/2025 | TIEC | RFI | TEXAS INDUSTRIAL ENERGY CONSUMERS FIRST REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC |
38 | 2/24/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | PL | CenterPoint Energy Houston Electric, LLC's Agreed Proposed Procedural Schedule |
39 | 2/25/2025 | OPUC | PL | OFFICE OF PUBLIC UTILITY COUNSEL’S PROTECTIVE ORDER CERTIFICATION |
40 | 2/25/2025 | WALMART INC. | PL | Motion to Intervene of Walmart Inc. |
41 | 2/25/2025 | HOUSTON COALITION OF CITIES | RFI | Houston Coalition of Cities' Third Requests for Information and Third Requests for Production to CenterPoint Energy Houston Electric, LLC |
42 | 2/25/2025 | ERCOT | RFI | ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S FIRST SET OF REQUESTS FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC |
43 | 2/26/2025 | PUC OPDM | PL | EX PARTE LETTER |
44 | 2/27/2025 | ACCLAIM ENERGY, LTD. | PL | Acclaim Energy's Motion to Intervene |
45 | 2/27/2025 | HUNT ENERGY NETWORK L.L.C. | RFI | HUNT ENERGY NETWORK LLC’S FIRST SET OF REQUESTS FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC LLC |
46 | 2/28/2025 | SOAH | PL | SOAH ORDER NO. 2 - MEMORIALIZING PREHEARING CONFERENCE; GRANTING MOTIONS TO INTERVENE; ADOPTING AGREED PROCEDURAL SCHEDULE; SETTING HEARING ON THE MERITS; AND PROVIDING PRE- AND POST-HEARING REQUIREMENTS |
47 | 2/28/2025 | ENCHANTED ROCK, LLC | PL | ENCHANTED ROCK, LLC'S PROTECTIVE ORDER CERTIFICATIONS |
48 | 2/28/2025 | ENCHANTED ROCK, LLC | PL | ENCHANTED ROCK, LLC'S MOTION TO INTERVENE |
49 | 2/28/2025 | PUC LEGAL | PL | COMMISSION STAFF’S RECOMMENDATION ON APPLICATION SUFFICIENCY AND NOTICE |
50 | 2/28/2025 | TIEC | RFI | TEXAS INDUSTRIAL ENERGY CONSUMERS SECOND REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC |
51 | 3/3/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | RFI | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO THE PUBLIC UTILITY COMMISSION OF TEXAS’S FIRST SET OF RFIS |
52 | 3/3/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | CONF | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO THE PUBLIC UTILITY COMMISSION OF TEXAS’S FIRST SET OF RFIS - CONFIDENTIAL (PART 1) |
53 | 3/3/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | CONF | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO THE PUBLIC UTILITY COMMISSION OF TEXAS’S FIRST SET OF RFIS - CONFIDENTIAL (PART 2) |
54 | 3/3/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | CONF | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO THE PUBLIC UTILITY COMMISSION OF TEXAS’S FIRST SET OF RFIS - CONFIDENTIAL (PART 3) |
55 | 3/3/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | CONF | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO THE PUBLIC UTILITY COMMISSION OF TEXAS’S FIRST SET OF RFIS - CONFIDENTIAL (PART 4) |
56 | 3/3/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | CONF | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO THE PUBLIC UTILITY COMMISSION OF TEXAS’S FIRST SET OF RFIS - CONFIDENTIAL (PART 5) |
57 | 3/3/2025 | Levit Green | TRAN | Docket NO. 57579 - APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - PUC - Levit Green's Motion to Intervene |
58 | 3/3/2025 | PowerSecure, Inc. | PL | Motion to Intervene |
59 | 3/3/2025 | PowerSecure, Inc. | PL | VOID SEE ITEM 99 |
60 | 3/3/2025 | OPUC | RFI | OFFICE OF PUBLIC UTILITY COUNSEL’S FIRST REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC |
61 | 3/3/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric Responses to Texas Coast Utilities Coalition's First Set of RFI's |
62 | 3/3/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | CONF | CenterPoint Energy Houston Electric Responses to Texas Coast Utilities Coalition's First Set of RFI's - Confidential |
63 | 3/3/2025 | TEXAS ENERGY ASSOCIATION FOR MARKETERS | PL | Texas Energy Association for Marketers' Motion to Amend its Intervenor Status |
64 | 3/4/2025 | HUNT ENERGY NETWORK L.L.C. | PL | Hunt Energy Network LLC Protective Order Certifications |
65 | 3/4/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to Electric Reliability Council of Texas First Requests for Information |
66 | 3/5/2025 | ACCLAIM ENERGY LTD | PL | Acclaim Energy LTD's Protective Order Certifications |
67 | 3/6/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production (Part 1) |
68 | 3/6/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production (Part 2) |
69 | 3/6/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production (Part 3) |
70 | 3/6/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production (Part 4) |
71 | 3/6/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production (Part 5) |
72 | 3/6/2025 | OPUC | PL | OFFICE OF PUBLIC UTILITY COUNSEL’S PROTECTIVE ORDER CERTIFICATION |
73 | 3/6/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production (Part 6) |
74 | 3/6/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production (Part 7) |
75 | 3/6/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | CONF | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production - Confidential |
76 | 3/7/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | PL | CenterPoint's Notice of Technical Conference |
77 | 3/7/2025 | HOUSTON COALITION OF CITIES | RFI | HOUSTON COALITION OF CITIES’ FOURTH REQUESTS FOR INFORMATION AND FOURTH REQUESTS FOR PRODUCTION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC |
78 | 3/7/2025 | TCUC | RFI | TCUC's 2nd Set of RFIs to CEHE |
79 | 3/7/2025 | OPUC | RFI | OPUC's Second RFIs to CenterPoint |
80 | 3/10/2025 | OPUC | PL | OFFICE OF PUBLIC UTILITY COUNSEL’S PROTECTIVE ORDER CERTIFICATION |
81 | 3/10/2025 | OPUC | RFI | OFFICE OF PUBLIC UTILITY COUNSEL’S THIRD REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC |
82 | 3/11/2025 | TEXAS CONSUMER ASSOCIATION | PL | Motion to Intervene |
83 | 3/11/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Second Set of Requests for Information |
84 | 3/11/2025 | OPUC | RFI | OFFICE OF PUBLIC UTILITY COUNSEL’S FOURTH REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC |
85 | 3/11/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to Texas Industrial Energy Consumers First Set of RFIs |
86 | 3/12/2025 | REP COALITION | RFI | The REP Coalition's First Request for Information to CenterPoint Energy Houston Electric, LLC |
87 | 3/13/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Third Requests for Information and Third Requests for Production with the exception of HCC-RFI03-09, 14, 16, 17, 18, 19 & HCC- RFP03-08. |
88 | 3/13/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | CONF | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Third Requests for Information and Third Requests for Production - Confidential |
89 | 3/14/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Third Requests for Information and Third Requests for Production - HCC-RFI03-09, 14, 16, 17, 18, 19 & HCC-RFP03-08 |
90 | 3/14/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | CONF | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Third Requests for Information and Third Requests for Production - Confidential |
91 | 3/14/2025 | PUC LEGAL | PL | PROTECTIVE ORDER CERTIFICATION |
92 | 3/14/2025 | HUNT ENERGY NETWORK L.L.C. | RFI | Hunt Energy Network LLC's Second Requests for Information to Centerpoint Energy Houston Electric LLC |
93 | 3/14/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Hunt Energy Network First Requests for Information |
94 | 3/14/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | CONF | CenterPoint Energy Houston Electric, LLC’s Responses to the Hunt Energy Network First Requests for Information - Confidential |
95 | 3/17/2025 | PUC LEGAL | PL | PROTECTIVE ORDER CERTIFICATION |
96 | 3/17/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to Texas Industrial Energy Consumers Second Set of RFIs |
97 | 3/17/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | CONF | CenterPoint Energy Houston Electric, LLC’s Responses to Texas Industrial Energy Consumers Second Set of RFIs - Confidential |
98 | 3/18/2025 | PUC LEGAL | RFI | COMMISSION STAFF’S SECOND REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC, QUESTION NO. STAFF 2-1 |
99 | 3/18/2025 | PowerSecure, Inc. | PL | Protective Order Certifications |
100 | 3/18/2025 | PUC OPDM | PL | EXPARTE MEMORANDUM |
101 | 3/18/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to Office of Public Utility Counsel First Set of RFIs. The response to OPUC-RFI01-04 is confidential |
102 | 3/18/2025 | IBEW LU 66 | RFI | First Requests for Information to CenterPoint |
103 | 3/18/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | CONF | CenterPoint Energy Houston Electric, LLC’s Responses to Office of Public Utility Counsel First Set of RFIs. - Confidential |
104 | 3/19/2025 | HUNT ENERGY NETWORK L.L.C. | RFI | Hunt Energy Network LLC's Third Set of Requests for Information to Centerpoint Energy Houston Electric LLC |
105 | 3/19/2025 | BRAZORIA COUNTY OFFICE OF EMERGENCY MANAGEMENT | PL | RE:SOAH DOCKET NO. 573-25-11558:PUC DOCKET NO. 57579 |
106 | 3/20/2025 | PUC LEGAL | RFI | COMMISSION STAFF’S THIRD REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC, QUESTION NOS. STAFF 3-1 THROUGH 3-4 |
107 | 3/20/2025 | SOAH | PL | SOAH ORDER NO. 3 - FINDING APPLICATION AND NOTICE SUFFICIENT; RULING ON MOTIONS TO INTERVENE |
108 | 3/20/2025 | TIEC | RFI | TEXAS INDUSTRIAL ENERGY CONSUMERS THIRD REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC |
109 | 3/20/2025 | GULF COAST COALITION OF CITIES (GCCC) | RFI | Gulf Coast Coalition of Cities' First Request for Information to CenterPoint Energy Houston Electric, LLC |
110 | 3/21/2025 | PUC LEGAL | RFI | COMMISSION STAFF’S FOURTH REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC, QUESTION NOS. STAFF 4-1 THROUGH 4-10 |
111 | 3/21/2025 | GULF COAST COALITION OF CITIES (GCCC) | RFI | Gulf Coast Coalition of Cities' Second Request for Information to CenterPoint Energy Houston Electric, LLC |
112 | 3/24/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, except HCC-RFP01-01 |
113 | 3/24/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | CONF | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, except HCC-RFP01-01 - CONFIDENTIAL |
114 | 3/24/2025 | PUC LEGAL | RFI | COMMISSION STAFF’S FOURTH REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC, QUESTION NOS. STAFF 5-1 THROUGH 5-3 |
115 | 3/24/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to Office of Public Utility Counsel Second Set of RFIs |
116 | 3/24/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to Texas Coast Utilities Coalition's Second Set of RFIs |
117 | 3/24/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | CONF | CenterPoint Energy Houston Electric, LLC’s Responses to Texas Coast Utilities Coalition's Second Set of RFIs - CONFIDENTIAL |
118 | 3/26/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to Office of Public Utility Counsel Third Set of RFIs |
119 | 3/26/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to Office of Public Utility Counsel Fourth Set of RFIs |
120 | 3/27/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | CONF | CenterPoint Energy Houston Electric, LLC’s Updated Response to Texas Coast Utilities Coalition's Second Set of RFIs (TCUC RFI02-01) - Confidential |
121 | 3/28/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | PL | Joint Request for Assignment of a Mediator |
122 | 3/28/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to REP Coalition’s First Set of RFIs - REP-RFI01-30 RFI will be filed confidentially |
123 | 3/28/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | CONF | 57579 - CEHE's Responses to REP Coalition's 1st set of RFIs, REP-RRC01-30 RFI will be filed confidentially-confidential attachments |
124 | 3/31/2025 | SOAH | PL | SOAH ORDER NO. 4 - REFERRING CASE FOR MEDIATION |
125 | 3/31/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, (HCC-RFP04-01) |
126 | 3/31/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, (HCC-RFP04-01) - Electronic Files No. 1 |
127 | 3/31/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, (HCC-RFP04-01) - Electronic Files No. 2 |
128 | 3/31/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Hunt Energy Network Second Requests for Information |
129 | 3/31/2025 | TEXAS CONSUMER ASSOCIATION | PL | Protective Order Certifications TCA |
130 | 3/31/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | CONF | CenterPoint Energy Houston Electric, LLC’s Responses to the Hunt Energy Network Second Requests for Information - Confidential |
131 | 3/31/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | CONF | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, (HCC-RFP04-01) - Confidential |
132 | 4/1/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | RFI | CenterPoint Energy Houston Electric, LLC’s Response to the Public Utility Commission of Texas Second Set of RFIs, (PUC-RFI02-01) |
133 | 4/2/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to International Brotherhood of Electrical Workers Local Union 66 (IBEW LU 66) First Set of RFI’s, IBEW-RFI01-08, 10 & 13 will be filed confidentially |
134 | 4/2/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | CONF | CenterPoint Energy Houston Electric, LLC’s Responses to International Brotherhood of Electrical Workers Local Union 66 (IBEW LU 66) First Set of RFI’s, IBEW-RFI01-08, 10 & 13 will be filed confidentially |
135 | 4/3/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, Update HCC-RFP04- 36U |
136 | 4/3/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | CONF | CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, Update HCC-RFP04- 36U - Confidential |
137 | 4/3/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Hunt Energy Network Third Requests for Information |
138 | 4/4/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Public Utility Commission of Texas Third Set of RFIs |
139 | 4/4/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to Gulf Coast Coalition of Cities First Set of RFIs |
140 | 4/4/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Response to Technical Conference Question |
141 | 4/7/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Public Utility Commission of Texas Fourth Set of RFIs, RFI Responses: PUC-RFI04-08 & 10 will be filed confidential |
142 | 4/7/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to the Public Utility Commission of Texas Fifth Set of RFIs |
143 | 4/7/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | CONF | CenterPoint Energy Houston Electric, LLC’s Responses to the Public Utility Commission of Texas Fourth Set of RFIs, RFI Responses: PUC-RFI04-08 & 10 will be filed confidential - Confidential |
144 | 4/7/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to Gulf Coast Coalition of Cities Second Set of RFIs |
145 | 4/8/2025 | IBEW LU 66 | TEST | Direct Testimony of Ed Allen |
146 | 4/8/2025 | ERCOT | TEST | DIRECT TESTIMONY OF GNANAPRABHU GNANAM |
147 | 4/8/2025 | HOUSTON COALITION OF CITIES | TEST | Direct Testimony of Kevin Mara |
148 | 4/8/2025 | GULF COAST COALITION OF CITIES (GCCC) | TEST | Direct Testimony of Karl J. Nalepa |
149 | 4/8/2025 | HOUSTON COALITION OF CITIES | TEST | Direct Testimony of Michael Ivey |
150 | 4/8/2025 | OPUC | TEST | OPUC`S DIRECT TESTIMONY AND ATTACHMENTS & WORKPAPER OF JOHN E. HASELDEN |
151 | 4/8/2025 | OPUC | PL | OFFICE OF PUBLIC UTILITY COUNSEL’S NOTICE OF FILING OF CONFIDENTIAL MATERIALS |
152 | 4/8/2025 | TIEC | TEST | DIRECT TESTIMONY AND EXHIBITS OF S. MCGLOTHLIN ON BEHALF OF TEXAS INDUSTRIAL ENERGY CONSUMERS |
153 | 4/8/2025 | OPUC | TEST | OPUC`S DIRECT TESTIMONY AND ATTACHEMENTS OF RONALD KEEN |
154 | 4/8/2025 | OPUC | CONF | CONFIDENTIAL OPUC`S DIRECT TESTIMONY AND ATTACHMENT OF JOHN E. HASELDEN |
155 | 4/8/2025 | TIEC | CONF | CONFIDENTIAL PORTION OF THE DIRECT TESTIMONY AND EXHIBITS OF S. MCGLOTHLIN ON BEHALF OF TEXAS INDUSTRIAL ENERGY CONSUMERS |
156 | 4/8/2025 | TCUC | TEST | Direct Testimony & Attachments of Scott Norwood (Redacted) |
157 | 4/8/2025 | TCUC | CONF | Confidential Portions to the Direct Testimony & Attachments of Scott Norwood |
158 | 4/8/2025 | TCUC | TEST | Workpapers to the Direct Testimony & Attachments of Scott Norwood (Redacted) |
159 | 4/8/2025 | TCUC | CONF | Confidential Portions to the Workpapers to the Direct Testimony & Attachments of Scott Norwood |
160 | 4/8/2025 | ACCLAIM ENERGY LTD | PL | Direct Testimony of John Elder |
161 | 4/8/2025 | HOUSTON COALITION OF CITIES | TEST | Direct Testimony of Steven D. Hunt |
162 | 4/8/2025 | ACCLAIM ENERGY, LTD. | PL | Affidavit (supplementing item 160 Direct Testimony) |
163 | 4/8/2025 | WALMART INC. | ADMN | Direct Testimony and Exhibits of Eric S. Austin on behalf of Walmart Inc. |
164 | 4/8/2025 | HOUSTON COALITION OF CITIES | TEST | Workpapers of Michael Ivey (HCC) |
165 | 4/9/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CenterPoint Energy Houston Electric, LLC’s Responses to Texas Industrial Energy Consumers Third Set of RFIs |
166 | 4/9/2025 | TIEC | MISC | WORKPAPERS TO THE DIRECT TESTIMONY OF SHAWN P. MCGLOTHLIN ON BEHALF OF TEXAS INDUSTRIAL ENERGY CONSUMERS |
167 | 4/9/2025 | SOAH | PL | SOAH MEDIATION LETTER |
168 | 4/9/2025 | TIEC | CONF | CONFIDENTIAL WORKPAPERS TO THE DIRECT TESTIMONY OF SHAWN P. MCGLOTHLIN ON BEHALF OF TEXAS INDUSTRIAL ENERGY CONSUMERS |
169 | 4/10/2025 | OPUC | PL | OPUC'S ERRATA TO THE DIRECT TESTIMONY OF RONALD KEEN |
170 | 4/11/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S FIRST SET OF REQUESTS FOR INFORMATION TO GULF COAST COALITION OF CITIES |
171 | 4/11/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S FIRST SET OF REQUESTS FOR INFORMATION TO HOUSTON COALITION OF CITIES |
172 | 4/11/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S FIRST SET OF REQUESTS FOR INFORMATION TO TEXAS COAST UTILITIES COALITION |
173 | 4/11/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S FIRST SET OF REQUESTS FOR INFORMATION TO TEXAS INDUSTRIAL ENERGY CONSUMERS |
174 | 4/11/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S FIRST SET OF REQUESTS FOR INFORMATION TO INTERNATIONAL BROTHERHOOD OF ELECTRICAL WORKERS LOCAL UNION 66 |
175 | 4/11/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S FIRST SET OF REQUESTS FOR INFORMATION TO OFFICE OF PUBLIC UTILITY COUNSEL |
176 | 4/15/2025 | PUC LEGAL | TEST | DIRECT TESTIMONY OF CHRIS BROWN, MARKET ANALYSIS DIVISION, PUBLIC UTILITY COMMISSION OF TEXAS, APRIL 15, 2025 |
177 | 4/15/2025 | PUC LEGAL | TEST | DIRECT TESTIMONY OF EDUARDO ACOSTA, P.E., INFRASTRUCTURE DIVISION, PUBLIC UTILITY COMMISSION OF TEXAS, APRIL 15, 2025 |
178 | 4/15/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S SECOND SET OF REQUESTS FOR INFORMATION TO OFFICE OF PUBLIC UTILITY COUNSEL |
179 | 4/15/2025 | PUC LEGAL | TEST | DIRECT TESTIMONY OF DAVID BAUTISTA, P.E., INFRASTRUCTURE DIVISION, PUBLIC UTILITY COMMISSION OF TEXAS, April 15, 2025 |
180 | 4/15/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S SECOND SET OF REQUESTS FOR INFORMATION TO TEXAS COAST UTILITIES COALITION |
181 | 4/15/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S SECOND SET OF REQUESTS FOR INFORMATION TO TEXAS INDUSTRIAL ENERGY CONSUMERS |
182 | 4/15/2025 | PUC LEGAL | TEST | DIRECT TESTIMONY OF MICHAEL (MIKE) NOTH, P.E., INFRASTRUCTURE DIVISION, PUBLIC UTILITY COMMISSION OF TEXAS, April 15, 2025 |
183 | 4/15/2025 | PUC LEGAL | TEST | DIRECT TESTIMONY OF JOHN POOLE, P.E., INFRASTRUCTURE DIVISION, PUBLIC UTILITY COMMISSION OF TEXAS, APRIL 15, 2025 |
184 | 4/15/2025 | PUC LEGAL | TEST | DIRECT TESTIMONY OF RUTH STARK, RATE REGULATION DIVISION, PUBLIC UTILITY COMMISSION OF TEXAS, APRIL 15, 2025 |
185 | 4/15/2025 | CENTERPOINT ENERGY HOUSTON ELECTRIC | RFI | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S SECOND SET OF REQUESTS FOR INFORMATION TO HOUSTON COALITION OF CITIES |
186 | 4/16/2025 | REP COALITION | RFI | The REP Coalition’s First Request for Information to Acclaim Energy Ltd |
187 | 4/17/2025 | IBEW LU 66 | RFI | Response to CEHE's First RFIs |
188 | 4/17/2025 | TIEC | RFI | TEXAS INDUSTRIAL ENERGY CONSUMERS FIRST REQUEST FOR INFORMATION TO HOUSTON COALITION OF CITIES |
189 | 4/17/2025 | TIEC | RFI | TEXAS INDUSTRIAL ENERGY CONSUMERS FIRST REQUEST FOR INFORMATION TO THE STAFF OF THE PUBLIC UTILITY COMMISSION OF TEXAS |
Export to Excel |