Filings for 57579



Case Style   APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN

189 filing(s).

Item File Stamp Party Item Type Filing Description
1 1/23/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC LTRS REQUEST FOR A DOCKET NUMBER
2 1/31/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC PL APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN
3 1/31/2025 IBEW LU 66 PL Motion to Intervene
4 2/1/2025 IBEW LU 66 PL Protective Order Certification
5 2/3/2025 GULF COAST COALITION OF CITIES (GCCC) PL Gulf Coast Coalition of Cities' Motion to Intervene
6 2/3/2025 GULF COAST COALITION OF CITIES (GCCC) PL Gulf Coast Coalition of Cities' Protective Order Certifications
7 2/3/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC , LLC LTRS CenterPoint Energy Houston Electric Letter to the Public Utility Commission of Texas
8 2/3/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC PL Affidavit of Michael Burleson
9 2/3/2025 PUC OPDM PL ORDER OF REFERRAL AND PRELIMINARY ORDER
10 2/4/2025 OPUC PL OFFICE OF PUBLIC UTILITY COUNSEL’S MOTION TO INTERVENE
11 2/4/2025 HOUSTON COALITION OF CITIES PL Houston Coalition of Cities' Motion to Intervene
12 2/4/2025 SOAH PL SOAH ORDER NO. 1 - JURISDICTION AND DECISION DEADLINE; REQUIRING COMMENTS ON SUFFICIENCY OF APPLICATION AND NOTICE; VIDEOCONFERENCE ATTENDANCE INFORMATION; SETTING PREHEARING CONFERENCE; ADOPTING PROTECTIVE ORDER; AND GENERAL PROCEDURES
13 2/4/2025 OPUC PL OFFICE OF PUBLIC UTILITY COUNSEL`S VOID LETTER TO CENTRAL RECORDS
14 2/4/2025 OPUC PL OFFICE OF PUBLIC UTILITY COUNSEL’S MOTION TO INTERVENE
15 2/5/2025 TIEC PL TEXAS INDUSTRIAL ENERGY CONSUMERS’ MOTION TO INTERVENE
16 2/5/2025 TIEC PL TEXAS INDUSTRIAL ENERGY CONSUMERS’ NOTICE OF FILING PROTECTIVE ORDER CERTIFICATIONS
17 2/6/2025 HOUSTON COALITION OF CITIES MISC Houston Coalition of Cities' Protective Order Certifications
18 2/6/2025 ERCOT PL ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S MOTION TO INTERVENE
19 2/6/2025 ERCOT MISC ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S PROTECTIVE ORDER CERTIFICATIONS
20 2/10/2025 TCUC PL TCUC's Motion to Intervene
21 2/11/2025 TCUC RFI TCUC's 1st Set of RFIs to CEHE
22 2/11/2025 PUC LEGAL RFI COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC, QUESTION NOS. STAFF 1-1 THROUGH STAFF 1-47
23 2/12/2025 TCUC PL Protective Order Certifications - TCUC
24 2/12/2025 GULF COAST COALITION OF CITIES (GCCC) PL Gulf Coast Coalition of Cities' Supplemental Protective Order Certifications
25 2/12/2025 Monarch Strategic Ventures LTRS MSV Comment on CenterPoint's Microgrid Pilot Program
26 2/12/2025 PUC LEGAL PL VOID SEE ITEM 27
27 2/12/2025 PUC LEGAL LTRS MEMORANDUM TO CENTRAL RECORDS TO VOID ITEM
28 2/12/2025 PUC LEGAL PL PROTECTIVE ORDER CERTIFICATIONS
29 2/14/2025 HOUSTON COALITION OF CITIES RFI HOUSTON COALITION OF CITIES’ FIRST REQUESTS FOR INFORMATION AND FIRST REQUESTS FOR PRODUCTION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
30 2/17/2025 HOUSTON COALITION OF CITIES PL HCC's Protective Order Certifications
31 2/17/2025 HOUSTON COALITION OF CITIES PL HCC's Protective Order Certifications
32 2/17/2025 TEXAS ENERGY ASSOCIATION FOR MARKETERS PL Texas Energy Association for Marketers' Motion to Intervene
33 2/18/2025 OPUC PL OFFICE OF PUBLIC UTILITY COUNSEL’S PROTECTIVE ORDER CERTIFICATIONS
34 2/18/2025 HUNT ENERGY NETWORK L.L.C. PL Hunt Energy Network LLC's Motion to Intervene
35 2/19/2025 HOUSTON COALITION OF CITIES RFI Houston Coalition of Cities' Second Requests for Information to CenterPoint Energy Houston Electric, LLC
36 2/20/2025 TEXAS ENERGY ASSOCIATION FOR MARKETERS PL Texas Energy Association for Marketers' Protective Order Certifications
37 2/24/2025 TIEC RFI TEXAS INDUSTRIAL ENERGY CONSUMERS FIRST REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
38 2/24/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC PL CenterPoint Energy Houston Electric, LLC's Agreed Proposed Procedural Schedule
39 2/25/2025 OPUC PL OFFICE OF PUBLIC UTILITY COUNSEL’S PROTECTIVE ORDER CERTIFICATION
40 2/25/2025 WALMART INC. PL Motion to Intervene of Walmart Inc.
41 2/25/2025 HOUSTON COALITION OF CITIES RFI Houston Coalition of Cities' Third Requests for Information and Third Requests for Production to CenterPoint Energy Houston Electric, LLC
42 2/25/2025 ERCOT RFI ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S FIRST SET OF REQUESTS FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
43 2/26/2025 PUC OPDM PL EX PARTE LETTER
44 2/27/2025 ACCLAIM ENERGY, LTD. PL Acclaim Energy's Motion to Intervene
45 2/27/2025 HUNT ENERGY NETWORK L.L.C. RFI HUNT ENERGY NETWORK LLC’S FIRST SET OF REQUESTS FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC LLC
46 2/28/2025 SOAH PL SOAH ORDER NO. 2 - MEMORIALIZING PREHEARING CONFERENCE; GRANTING MOTIONS TO INTERVENE; ADOPTING AGREED PROCEDURAL SCHEDULE; SETTING HEARING ON THE MERITS; AND PROVIDING PRE- AND POST-HEARING REQUIREMENTS
47 2/28/2025 ENCHANTED ROCK, LLC PL ENCHANTED ROCK, LLC'S PROTECTIVE ORDER CERTIFICATIONS
48 2/28/2025 ENCHANTED ROCK, LLC PL ENCHANTED ROCK, LLC'S MOTION TO INTERVENE
49 2/28/2025 PUC LEGAL PL COMMISSION STAFF’S RECOMMENDATION ON APPLICATION SUFFICIENCY AND NOTICE
50 2/28/2025 TIEC RFI TEXAS INDUSTRIAL ENERGY CONSUMERS SECOND REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
51 3/3/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC RFI CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO THE PUBLIC UTILITY COMMISSION OF TEXAS’S FIRST SET OF RFIS
52 3/3/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC CONF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO THE PUBLIC UTILITY COMMISSION OF TEXAS’S FIRST SET OF RFIS - CONFIDENTIAL (PART 1)
53 3/3/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC CONF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO THE PUBLIC UTILITY COMMISSION OF TEXAS’S FIRST SET OF RFIS - CONFIDENTIAL (PART 2)
54 3/3/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC CONF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO THE PUBLIC UTILITY COMMISSION OF TEXAS’S FIRST SET OF RFIS - CONFIDENTIAL (PART 3)
55 3/3/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC CONF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO THE PUBLIC UTILITY COMMISSION OF TEXAS’S FIRST SET OF RFIS - CONFIDENTIAL (PART 4)
56 3/3/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC CONF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO THE PUBLIC UTILITY COMMISSION OF TEXAS’S FIRST SET OF RFIS - CONFIDENTIAL (PART 5)
57 3/3/2025 Levit Green TRAN Docket NO. 57579 - APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - PUC - Levit Green's Motion to Intervene
58 3/3/2025 PowerSecure, Inc. PL Motion to Intervene
59 3/3/2025 PowerSecure, Inc. PL VOID SEE ITEM 99
60 3/3/2025 OPUC RFI OFFICE OF PUBLIC UTILITY COUNSEL’S FIRST REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
61 3/3/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric Responses to Texas Coast Utilities Coalition's First Set of RFI's
62 3/3/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC CONF CenterPoint Energy Houston Electric Responses to Texas Coast Utilities Coalition's First Set of RFI's - Confidential
63 3/3/2025 TEXAS ENERGY ASSOCIATION FOR MARKETERS PL Texas Energy Association for Marketers' Motion to Amend its Intervenor Status
64 3/4/2025 HUNT ENERGY NETWORK L.L.C. PL Hunt Energy Network LLC Protective Order Certifications
65 3/4/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to Electric Reliability Council of Texas First Requests for Information
66 3/5/2025 ACCLAIM ENERGY LTD PL Acclaim Energy LTD's Protective Order Certifications
67 3/6/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production (Part 1)
68 3/6/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production (Part 2)
69 3/6/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production (Part 3)
70 3/6/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production (Part 4)
71 3/6/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production (Part 5)
72 3/6/2025 OPUC PL OFFICE OF PUBLIC UTILITY COUNSEL’S PROTECTIVE ORDER CERTIFICATION
73 3/6/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production (Part 6)
74 3/6/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production (Part 7)
75 3/6/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC CONF CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ First Set of Requests for Information and First Set of Requests for Production - Confidential
76 3/7/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC PL CenterPoint's Notice of Technical Conference
77 3/7/2025 HOUSTON COALITION OF CITIES RFI HOUSTON COALITION OF CITIES’ FOURTH REQUESTS FOR INFORMATION AND FOURTH REQUESTS FOR PRODUCTION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
78 3/7/2025 TCUC RFI TCUC's 2nd Set of RFIs to CEHE
79 3/7/2025 OPUC RFI OPUC's Second RFIs to CenterPoint
80 3/10/2025 OPUC PL OFFICE OF PUBLIC UTILITY COUNSEL’S PROTECTIVE ORDER CERTIFICATION
81 3/10/2025 OPUC RFI OFFICE OF PUBLIC UTILITY COUNSEL’S THIRD REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
82 3/11/2025 TEXAS CONSUMER ASSOCIATION PL Motion to Intervene
83 3/11/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Second Set of Requests for Information
84 3/11/2025 OPUC RFI OFFICE OF PUBLIC UTILITY COUNSEL’S FOURTH REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
85 3/11/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to Texas Industrial Energy Consumers First Set of RFIs
86 3/12/2025 REP COALITION RFI The REP Coalition's First Request for Information to CenterPoint Energy Houston Electric, LLC
87 3/13/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Third Requests for Information and Third Requests for Production with the exception of HCC-RFI03-09, 14, 16, 17, 18, 19 & HCC- RFP03-08.
88 3/13/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC CONF CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Third Requests for Information and Third Requests for Production - Confidential
89 3/14/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Third Requests for Information and Third Requests for Production - HCC-RFI03-09, 14, 16, 17, 18, 19 & HCC-RFP03-08
90 3/14/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC CONF CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Third Requests for Information and Third Requests for Production - Confidential
91 3/14/2025 PUC LEGAL PL PROTECTIVE ORDER CERTIFICATION
92 3/14/2025 HUNT ENERGY NETWORK L.L.C. RFI Hunt Energy Network LLC's Second Requests for Information to Centerpoint Energy Houston Electric LLC
93 3/14/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Hunt Energy Network First Requests for Information
94 3/14/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC CONF CenterPoint Energy Houston Electric, LLC’s Responses to the Hunt Energy Network First Requests for Information - Confidential
95 3/17/2025 PUC LEGAL PL PROTECTIVE ORDER CERTIFICATION
96 3/17/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to Texas Industrial Energy Consumers Second Set of RFIs
97 3/17/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC CONF CenterPoint Energy Houston Electric, LLC’s Responses to Texas Industrial Energy Consumers Second Set of RFIs - Confidential
98 3/18/2025 PUC LEGAL RFI COMMISSION STAFF’S SECOND REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC, QUESTION NO. STAFF 2-1
99 3/18/2025 PowerSecure, Inc. PL Protective Order Certifications
100 3/18/2025 PUC OPDM PL EXPARTE MEMORANDUM
101 3/18/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to Office of Public Utility Counsel First Set of RFIs. The response to OPUC-RFI01-04 is confidential
102 3/18/2025 IBEW LU 66 RFI First Requests for Information to CenterPoint
103 3/18/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC CONF CenterPoint Energy Houston Electric, LLC’s Responses to Office of Public Utility Counsel First Set of RFIs. - Confidential
104 3/19/2025 HUNT ENERGY NETWORK L.L.C. RFI Hunt Energy Network LLC's Third Set of Requests for Information to Centerpoint Energy Houston Electric LLC
105 3/19/2025 BRAZORIA COUNTY OFFICE OF EMERGENCY MANAGEMENT PL RE:SOAH DOCKET NO. 573-25-11558:PUC DOCKET NO. 57579
106 3/20/2025 PUC LEGAL RFI COMMISSION STAFF’S THIRD REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC, QUESTION NOS. STAFF 3-1 THROUGH 3-4
107 3/20/2025 SOAH PL SOAH ORDER NO. 3 - FINDING APPLICATION AND NOTICE SUFFICIENT; RULING ON MOTIONS TO INTERVENE
108 3/20/2025 TIEC RFI TEXAS INDUSTRIAL ENERGY CONSUMERS THIRD REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
109 3/20/2025 GULF COAST COALITION OF CITIES (GCCC) RFI Gulf Coast Coalition of Cities' First Request for Information to CenterPoint Energy Houston Electric, LLC
110 3/21/2025 PUC LEGAL RFI COMMISSION STAFF’S FOURTH REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC, QUESTION NOS. STAFF 4-1 THROUGH 4-10
111 3/21/2025 GULF COAST COALITION OF CITIES (GCCC) RFI Gulf Coast Coalition of Cities' Second Request for Information to CenterPoint Energy Houston Electric, LLC
112 3/24/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, except HCC-RFP01-01
113 3/24/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC CONF CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, except HCC-RFP01-01 - CONFIDENTIAL
114 3/24/2025 PUC LEGAL RFI COMMISSION STAFF’S FOURTH REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC, QUESTION NOS. STAFF 5-1 THROUGH 5-3
115 3/24/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC RFI CenterPoint Energy Houston Electric, LLC’s Responses to Office of Public Utility Counsel Second Set of RFIs
116 3/24/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC RFI CenterPoint Energy Houston Electric, LLC’s Responses to Texas Coast Utilities Coalition's Second Set of RFIs
117 3/24/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC CONF CenterPoint Energy Houston Electric, LLC’s Responses to Texas Coast Utilities Coalition's Second Set of RFIs - CONFIDENTIAL
118 3/26/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to Office of Public Utility Counsel Third Set of RFIs
119 3/26/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to Office of Public Utility Counsel Fourth Set of RFIs
120 3/27/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC CONF CenterPoint Energy Houston Electric, LLC’s Updated Response to Texas Coast Utilities Coalition's Second Set of RFIs (TCUC RFI02-01) - Confidential
121 3/28/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC PL Joint Request for Assignment of a Mediator
122 3/28/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to REP Coalition’s First Set of RFIs - REP-RFI01-30 RFI will be filed confidentially
123 3/28/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC CONF 57579 - CEHE's Responses to REP Coalition's 1st set of RFIs, REP-RRC01-30 RFI will be filed confidentially-confidential attachments
124 3/31/2025 SOAH PL SOAH ORDER NO. 4 - REFERRING CASE FOR MEDIATION
125 3/31/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, (HCC-RFP04-01)
126 3/31/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, (HCC-RFP04-01) - Electronic Files No. 1
127 3/31/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, (HCC-RFP04-01) - Electronic Files No. 2
128 3/31/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Hunt Energy Network Second Requests for Information
129 3/31/2025 TEXAS CONSUMER ASSOCIATION PL Protective Order Certifications TCA
130 3/31/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC CONF CenterPoint Energy Houston Electric, LLC’s Responses to the Hunt Energy Network Second Requests for Information - Confidential
131 3/31/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC CONF CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, (HCC-RFP04-01) - Confidential
132 4/1/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC RFI CenterPoint Energy Houston Electric, LLC’s Response to the Public Utility Commission of Texas Second Set of RFIs, (PUC-RFI02-01)
133 4/2/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to International Brotherhood of Electrical Workers Local Union 66 (IBEW LU 66) First Set of RFI’s, IBEW-RFI01-08, 10 & 13 will be filed confidentially
134 4/2/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC CONF CenterPoint Energy Houston Electric, LLC’s Responses to International Brotherhood of Electrical Workers Local Union 66 (IBEW LU 66) First Set of RFI’s, IBEW-RFI01-08, 10 & 13 will be filed confidentially
135 4/3/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, Update HCC-RFP04- 36U
136 4/3/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC CONF CenterPoint Energy Houston Electric, LLC’s Responses to the Houston Coalition of Cities’ Fourth Requests for Information and Fourth Requests for Production, Update HCC-RFP04- 36U - Confidential
137 4/3/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Hunt Energy Network Third Requests for Information
138 4/4/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Public Utility Commission of Texas Third Set of RFIs
139 4/4/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to Gulf Coast Coalition of Cities First Set of RFIs
140 4/4/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Response to Technical Conference Question
141 4/7/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Public Utility Commission of Texas Fourth Set of RFIs, RFI Responses: PUC-RFI04-08 & 10 will be filed confidential
142 4/7/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to the Public Utility Commission of Texas Fifth Set of RFIs
143 4/7/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC CONF CenterPoint Energy Houston Electric, LLC’s Responses to the Public Utility Commission of Texas Fourth Set of RFIs, RFI Responses: PUC-RFI04-08 & 10 will be filed confidential - Confidential
144 4/7/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to Gulf Coast Coalition of Cities Second Set of RFIs
145 4/8/2025 IBEW LU 66 TEST Direct Testimony of Ed Allen
146 4/8/2025 ERCOT TEST DIRECT TESTIMONY OF GNANAPRABHU GNANAM
147 4/8/2025 HOUSTON COALITION OF CITIES TEST Direct Testimony of Kevin Mara
148 4/8/2025 GULF COAST COALITION OF CITIES (GCCC) TEST Direct Testimony of Karl J. Nalepa
149 4/8/2025 HOUSTON COALITION OF CITIES TEST Direct Testimony of Michael Ivey
150 4/8/2025 OPUC TEST OPUC`S DIRECT TESTIMONY AND ATTACHMENTS & WORKPAPER OF JOHN E. HASELDEN
151 4/8/2025 OPUC PL OFFICE OF PUBLIC UTILITY COUNSEL’S NOTICE OF FILING OF CONFIDENTIAL MATERIALS
152 4/8/2025 TIEC TEST DIRECT TESTIMONY AND EXHIBITS OF S. MCGLOTHLIN ON BEHALF OF TEXAS INDUSTRIAL ENERGY CONSUMERS
153 4/8/2025 OPUC TEST OPUC`S DIRECT TESTIMONY AND ATTACHEMENTS OF RONALD KEEN
154 4/8/2025 OPUC CONF CONFIDENTIAL OPUC`S DIRECT TESTIMONY AND ATTACHMENT OF JOHN E. HASELDEN
155 4/8/2025 TIEC CONF CONFIDENTIAL PORTION OF THE DIRECT TESTIMONY AND EXHIBITS OF S. MCGLOTHLIN ON BEHALF OF TEXAS INDUSTRIAL ENERGY CONSUMERS
156 4/8/2025 TCUC TEST Direct Testimony & Attachments of Scott Norwood (Redacted)
157 4/8/2025 TCUC CONF Confidential Portions to the Direct Testimony & Attachments of Scott Norwood
158 4/8/2025 TCUC TEST Workpapers to the Direct Testimony & Attachments of Scott Norwood (Redacted)
159 4/8/2025 TCUC CONF Confidential Portions to the Workpapers to the Direct Testimony & Attachments of Scott Norwood
160 4/8/2025 ACCLAIM ENERGY LTD PL Direct Testimony of John Elder
161 4/8/2025 HOUSTON COALITION OF CITIES TEST Direct Testimony of Steven D. Hunt
162 4/8/2025 ACCLAIM ENERGY, LTD. PL Affidavit (supplementing item 160 Direct Testimony)
163 4/8/2025 WALMART INC. ADMN Direct Testimony and Exhibits of Eric S. Austin on behalf of Walmart Inc.
164 4/8/2025 HOUSTON COALITION OF CITIES TEST Workpapers of Michael Ivey (HCC)
165 4/9/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CenterPoint Energy Houston Electric, LLC’s Responses to Texas Industrial Energy Consumers Third Set of RFIs
166 4/9/2025 TIEC MISC WORKPAPERS TO THE DIRECT TESTIMONY OF SHAWN P. MCGLOTHLIN ON BEHALF OF TEXAS INDUSTRIAL ENERGY CONSUMERS
167 4/9/2025 SOAH PL SOAH MEDIATION LETTER
168 4/9/2025 TIEC CONF CONFIDENTIAL WORKPAPERS TO THE DIRECT TESTIMONY OF SHAWN P. MCGLOTHLIN ON BEHALF OF TEXAS INDUSTRIAL ENERGY CONSUMERS
169 4/10/2025 OPUC PL OPUC'S ERRATA TO THE DIRECT TESTIMONY OF RONALD KEEN
170 4/11/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S FIRST SET OF REQUESTS FOR INFORMATION TO GULF COAST COALITION OF CITIES
171 4/11/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S FIRST SET OF REQUESTS FOR INFORMATION TO HOUSTON COALITION OF CITIES
172 4/11/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S FIRST SET OF REQUESTS FOR INFORMATION TO TEXAS COAST UTILITIES COALITION
173 4/11/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S FIRST SET OF REQUESTS FOR INFORMATION TO TEXAS INDUSTRIAL ENERGY CONSUMERS
174 4/11/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S FIRST SET OF REQUESTS FOR INFORMATION TO INTERNATIONAL BROTHERHOOD OF ELECTRICAL WORKERS LOCAL UNION 66
175 4/11/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S FIRST SET OF REQUESTS FOR INFORMATION TO OFFICE OF PUBLIC UTILITY COUNSEL
176 4/15/2025 PUC LEGAL TEST DIRECT TESTIMONY OF CHRIS BROWN, MARKET ANALYSIS DIVISION, PUBLIC UTILITY COMMISSION OF TEXAS, APRIL 15, 2025
177 4/15/2025 PUC LEGAL TEST DIRECT TESTIMONY OF EDUARDO ACOSTA, P.E., INFRASTRUCTURE DIVISION, PUBLIC UTILITY COMMISSION OF TEXAS, APRIL 15, 2025
178 4/15/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S SECOND SET OF REQUESTS FOR INFORMATION TO OFFICE OF PUBLIC UTILITY COUNSEL
179 4/15/2025 PUC LEGAL TEST DIRECT TESTIMONY OF DAVID BAUTISTA, P.E., INFRASTRUCTURE DIVISION, PUBLIC UTILITY COMMISSION OF TEXAS, April 15, 2025
180 4/15/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S SECOND SET OF REQUESTS FOR INFORMATION TO TEXAS COAST UTILITIES COALITION
181 4/15/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S SECOND SET OF REQUESTS FOR INFORMATION TO TEXAS INDUSTRIAL ENERGY CONSUMERS
182 4/15/2025 PUC LEGAL TEST DIRECT TESTIMONY OF MICHAEL (MIKE) NOTH, P.E., INFRASTRUCTURE DIVISION, PUBLIC UTILITY COMMISSION OF TEXAS, April 15, 2025
183 4/15/2025 PUC LEGAL TEST DIRECT TESTIMONY OF JOHN POOLE, P.E., INFRASTRUCTURE DIVISION, PUBLIC UTILITY COMMISSION OF TEXAS, APRIL 15, 2025
184 4/15/2025 PUC LEGAL TEST DIRECT TESTIMONY OF RUTH STARK, RATE REGULATION DIVISION, PUBLIC UTILITY COMMISSION OF TEXAS, APRIL 15, 2025
185 4/15/2025 CENTERPOINT ENERGY HOUSTON ELECTRIC RFI CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S SECOND SET OF REQUESTS FOR INFORMATION TO HOUSTON COALITION OF CITIES
186 4/16/2025 REP COALITION RFI The REP Coalition’s First Request for Information to Acclaim Energy Ltd
187 4/17/2025 IBEW LU 66 RFI Response to CEHE's First RFIs
188 4/17/2025 TIEC RFI TEXAS INDUSTRIAL ENERGY CONSUMERS FIRST REQUEST FOR INFORMATION TO HOUSTON COALITION OF CITIES
189 4/17/2025 TIEC RFI TEXAS INDUSTRIAL ENERGY CONSUMERS FIRST REQUEST FOR INFORMATION TO THE STAFF OF THE PUBLIC UTILITY COMMISSION OF TEXAS