Case 57115-246
File Stamp 12/20/2024
Filing Party JJJBAK, LTD. AND DOS MAVERICKS, LLC
Case Style JOINT APPLICATION OF THE CITY OF SAN ANTONIO, ACTING BY AND THROUGH THE CITY PUBLIC SERVICE BOARD (CPS ENERGY), AND SOUTH TEXAS ELECTRIC COOPERATIVE, INC. (STEC) TO AMEND THEIR CERTIFICATES OF CONVENIENCE AND NECESSITY FOR THE PROPOSED HOWARD ROAD-TO-SAN MIGUEL 345-KV TRANSMISSION LINE IN BEXAR AND ATASCOSA COUNTIES
Filing Description Initial Brief of JJJBAK, Ltd. and Dos Mavericks, LLC
2 document(s).
Name | Description | Type |
---|---|---|
57115_246_1451584 | Pages 0 to -2 | ZIP |
57115_246_1451585 | Pages 1 to 3 |