Case 32182-209



File Stamp   11/26/2008

Filing Party   BRAZOS ELECTRIC POWER COOPERATIVE, INC.

Case Style   PUC INVESTIGATION OF METHODS TO IMPROVE ELECTRIC AND TELECOM INFRASTRUCTURE THAT WILL MINIMIZE LONG TERM OUTAGES AND RESTORATION COSTS ASSOCIATED WITH GULF COAST HURRICANES

Filing Description   VEGETATION MANAGEMENT REPORT

1 document(s).

Name Description Type
32182_209_604136 Pages 1 to 5 PDF