Filings for 57529
Case Style APPLICATION OF BRAZOS ELECTRIC POWER COOPERATIVE, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE BEECHAM GAP 138-KV TRANSMISSION LINE IN LAMPASAS AND CORYELL COUNTIES
139 filing(s).
Item | File Stamp | Party | Item Type | Filing Description |
---|---|---|---|---|
1 | 1/9/2025 | BRAZOS ELECTRIC POWER COOP | LTRS | REQUEST FOR DOCKET NUMBER |
2 | 1/24/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | TEST | Direct Testimony of John Wooten |
3 | 1/24/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | PL | Application of Brazos Electric Power Cooperative, Inc. to Amend its Certificate of Convenience and Necessity for the Beecham Gap 138-kV Transmission Line Project in Lampasas and Coryell Counties |
4 | 1/24/2025 | Brazos Power Electric Cooperative, Inc. | TEST | Direct Testimony of Curtis Trivitt |
5 | 1/24/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | TEST | Direct Testimony of David Albers |
6 | 1/24/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | TEST | Direct Testimony of Richard Chambers |
7 | 1/24/2025 | Brazos Power Electric Cooperative, Inc. | PL | Brazos Electric Power Cooperative, Inc.'s Request for Referral to the State Office of Administrative Hearings |
8 | 1/27/2025 | PUC OPDM | PL | ORDER OF REFERRAL AND PRELIMINARY ORDER |
9 | 1/28/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | PL | Brazos Electric Power Cooperative, Inc.'s Proof of Notice to Texas Parks and Wildlife Department |
10 | 1/29/2025 | SOAH | PL | SOAH ORDER NO. 1 - PROJECT DESCRIPTION; JURISDICTION; DEADLINE FOR DECISION; INTERVENTION DEADLINE; COMMENTS ON SUFFICIENCY OF APPLICATION AND NOTICE; SETTING PREHEARING CONFERENCE; CAUTION TO INTERESTED PARTIES; AND GENERAL PROCEDURAL REQUIREMENTS |
11 | 1/30/2025 | Brazos electric power coop | PRJ | Brazil electric power coop proposing to build new electric transmission line that may effect my property. We do not want brazos electric power coop putting in the transmission line and taking more of our land. Need to compensated substantial and correct. |
12 | 2/10/2025 | GUNNAR & JENNIFER CUMMINGS | PL | REQUEST TO INTERVENE |
13 | 2/11/2025 | SAN PANCHO RANCH LLC | PL | San Pancho Ranch LLC's Motion to Intervene |
14 | 2/11/2025 | SAN PANCHO RANCH, LLC | RFI | San Pancho Ranch, LLC's First Request for Information to Brazos Electric Power Cooperative, Inc. |
15 | 2/11/2025 | David May | PL | Request to Intervene in PUC Docket No. 57529 |
16 | 2/12/2025 | Steven Gilles | PL | Request to intervene in PUC docket No. 57529 |
17 | 2/12/2025 | Melinda and William A. Morris | PL | Melinda and William A. Morris' Motion to Intervene |
18 | 2/12/2025 | Atkinson | PL | Request to Intervene |
19 | 2/13/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | PL | Motion to Enter Agreed Procedural Schedule and Discovery Plan |
20 | 2/13/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | PL | Proof of Publication and Notice to Cities, Counties, Utilities, the Department of Defense, OPUC, and Landowners |
21 | 2/14/2025 | SOAH | PL | SOAH ORDER NO. 2 - MEMORIALIZING PREHEARING CONFERENCE, ADOPTING PROCEDURAL SCHEDULE, AND SCHEDULING HEARING |
22 | 2/19/2025 | Antonio and Talowa Bunton | PL | Intervene |
23 | 2/19/2025 | Talowa and Antonio Bunton | PL | Intervene |
24 | 2/20/2025 | MYRON MCFARLAND | PL | RATEPAYER PROTEST |
25 | 2/20/2025 | GALEN IRVINE | PL | REQUEST TO INTERVENE |
26 | 2/20/2025 | D&MT Investments, LP | PL | D&MT Investments, LP's Motion to Intervene |
27 | 2/20/2025 | Sidney Williams | COM | Protests and concerns. |
28 | 2/21/2025 | WESLEY CROW | PRJ | REQUEST TO INTERVENE |
29 | 2/21/2025 | Eudoris Weiser and Keith Weiser | PL | Motion to Intervene of Eudoris Weiser and Keith Weiser |
30 | 2/21/2025 | Steven Gilles | PL | Updated request to intervene with statement of position. |
31 | 2/21/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC | PL | Brazos Electric Power Cooperative, Inc.'s Notice of Errata |
32 | 2/21/2025 | BRYAN BAKER | PL | RATEPAYER PROTEST |
33 | 2/21/2025 | D&MT Investments, LP | PL | D&MT Investments, LP's Supplemental Motion to Intervene |
34 | 2/21/2025 | D&MT Investments, LP | CONF | D&MT Investments, LP's Supplemental Motion to Intervene - Confidential Attachment A |
35 | 2/23/2025 | Hally Thompson and Deanna Remick | PL | Request to Intervene |
36 | 2/23/2025 | Sandy Nixon | PL | Request to Intervene |
37 | 2/24/2025 | Becky Yowell | PL | Request to Intervene in PUC Docket No. 57529 |
38 | 2/24/2025 | Becky Yowell | PL | Request to Intervene in PUC Docket No. 57529 |
39 | 2/24/2025 | JAMES HARP | PL | REQUEST TO INTERVENE |
40 | 2/24/2025 | ILSE MEIER | PL | REQUEST TO INTERVENE |
41 | 2/24/2025 | Robert Scott Rushing | PL | Motion to Intervene - Rushing |
42 | 2/24/2025 | Hall-Binion Creek Reserves | PL | Motion to Intervene - Hall-Binion Creek Reserves |
43 | 2/24/2025 | Charles Stermer | PL | Request to Intervene in PUC Docket No. 57529 |
44 | 2/24/2025 | JEFF COATS. ROSEMARY M. COATS AND THE ESTATE OF JOHN COATS | PL | Motion to Intervene - Coats |
45 | 2/24/2025 | REF Farms LLC | PL | Motion to Intervene - REF Farms LLC |
46 | 2/24/2025 | Lampasas CR 3300 LLC | PL | Motion to Intervene - Lampasas CR 3300 LLC |
47 | 2/24/2025 | DILLON WHITIS | PL | WBW Investment Solutions Request to Intervene in PUC Docket No. 57529 |
48 | 2/24/2025 | PAULETTE CANTRELL LANDERS | PL | Motion to Intervene - Landers |
49 | 2/24/2025 | Keith D. Turner | PL | Request to intervene. |
50 | 2/24/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | PL | Request for Entry of Commission's Standard Protective Order |
51 | 2/24/2025 | STEVEN GRAY | PL | REQUEST TO INTERVENE |
52 | 2/24/2025 | Kyle Dunwiddie | PL | Request to Intervene |
53 | 2/24/2025 | CHRIS RUNHAAR | PL | Request to Intervene in PUC Docket No. 57529 |
54 | 2/24/2025 | RAK Realty Holding LLC (Rep by Ashok Bodduru) | PL | As the proposed electrical lines pass through my property, request you to please add us as Intervener as are we against with this proposal. // request to intervene |
55 | 2/24/2025 | Susan Williams and Loren Williams | COM | VOID SEE ITEM 59 |
56 | 2/24/2025 | Susan Williams and Loren Williams | COM | Request to Intervene in Application of Brazos Electric Power Cooperative to obtain CCN for Beecham Gap 138kV Transmission Line - Docket No. 57529 |
57 | 2/24/2025 | Kady Crow | PL | Request to Intervene |
58 | 2/24/2025 | Kirby Stermer | PL | Request to Intervene |
59 | 2/25/2025 | Susan Williams | LTRS | Cover Letter requesting to void Item #55 in Control number 57529. |
60 | 2/26/2025 | SOAH | PL | SOAH ORDER NO. 3 - GRANTING MOTIONS TO INTERVENE; ENTERING STANDARD PROTECTIVE ORDER |
61 | 2/26/2025 | DUSTIN DEWALD | PL | REQUEST TO INTERVENE |
62 | 2/26/2025 | MARY SIMPSON | PL | RATEPAYER PROTESTOR |
63 | 2/26/2025 | RIKI ANN TIMMONS | PL | REQUEST TO INTERVENE |
64 | 2/26/2025 | HUBERT ALEXANDER MILLER | PL | REQUEST TO INTERVENE |
65 | 2/26/2025 | PUC LEGAL | PL | COMMISSION STAFF’S RECOMMENDATION ON SUFFICIENCY OF THE APPLICATION AND NOTICE |
66 | 2/26/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | PL | Motion to Withdraw and Hold in Abeyance a Ruling on Certain Motions to Intervene |
67 | 2/26/2025 | Kyle Dunwiddie | PL | Notice of Appearance on Behalf of Kyle Dunwiddie |
68 | 2/27/2025 | SOAH | PL | SOAH ORDER NO. 4 - WITHDRAWING-IN-PART SOAH ORDER NO. 3 AND SETTING DEADLINE FOR OBJECTIONS |
69 | 2/27/2025 | Coats, Rushing, Landers, Hall, Binion Creek Reserves, LLC, Lampasas CR 3300, LLC and REF FArms, LLC | LTRS | Protective Order Certification |
70 | 2/27/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | TEST | Supplemental Testimony of Curtis Trivitt, P.E. #59170, on behalf of Brazos Electric Power Cooperative, Inc. |
71 | 2/27/2025 | Keith Weiser and Eudoris Weiser | LTRS | Protective Order Certifications |
72 | 2/27/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | PL | Brazos Electric Power Cooperative, Inc.'s Response to San Pancho Ranch, LLC's First Request for Information |
73 | 2/28/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | PL | Brazos Electric Power Cooperative's Response to SOAH Order No. 4 |
74 | 2/28/2025 | KIZZY GRIFFIN | PL | REQUEST TO INTERVENE |
75 | 2/28/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | TEST | Workpapers to Supplemental Testimony of Curtis Trivitt |
76 | 2/28/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | TEST | Supplemental Testimony Affidavit of Curtis Trivitt, P.E. |
77 | 3/3/2025 | SOAH | PL | SOAH ORDER NO. 5 - FINDING APPLICATION AND NOTICE SUFFICIENT; GRANTING MOTIONS TO INTERVENE; AND SETTING DEADLINE TO RESPOND TO MOTION TO INTERVENE |
78 | 3/3/2025 | Keith Weiser and Eudoris Weiser | RFI | Keith Weiser and Eudoris Weiser's First Set of Requests for Information to Brazos Electric Power Cooperative, Inc. |
79 | 3/3/2025 | ILSE MEIER | PL | Notice of Appearance on Behalf of Ilse Meier |
80 | 3/4/2025 | San Pancho Ranch, LLC | PL | San Pancho Ranch, LLC's Request for Hearing |
81 | 3/4/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | PL | Motion to Revise Procedural Order Related to Service Upon Parties Who Have Not Provided Email Addresses |
82 | 3/4/2025 | SAN PANCHO RANCH, LLC | RFI | San Pancho Ranch, LLC's Second Request for Information to Brazos Electric Power Cooperative, Inc. |
83 | 3/4/2025 | Kyle Dunwiddie and Ilse Meier | RFI | Kyle Dunwiddie and Ilse Meier's First Request for Information to Brazos Electric Power Cooperative, Inc. |
84 | 3/5/2025 | Ilse Meier | TEST | Direct Testimony of Ilse Meier |
85 | 3/5/2025 | Kyle Dunwiddie | TEST | Direct Testimony of Kyle Dunwiddie |
86 | 3/5/2025 | Hubert-Alexander:. Miller | PL | PUC Substation Link 2N |
87 | 3/5/2025 | REF Farms, LLC | TEST | Direct Testimony of REF Farms, LLC |
88 | 3/5/2025 | Hall and Binion Creek Reserves, LLC | TEST | Direct Testimony of Gregory Hall and Binion Creek Farms, LLC |
89 | 3/5/2025 | Lampasas CR 3300, LLC | TEST | Direct Testimony of Lampasas CR 3300, LLC |
90 | 3/5/2025 | Keith Weiser, individually, and on behalf of Eudoris Weiser | TEST | Direct Testimony of Keith Weiser, individually, and on behalf of Eudoris Weiser |
91 | 3/5/2025 | Robert Scott Rushing | TEST | Statement of Position - Rushing |
92 | 3/5/2025 | PAULETTE CANTRELL LANDERS | TEST | Statement of Position - Landers |
93 | 3/5/2025 | San Pancho Ranch LLC | TEST | VOID SEE ITEM 99 |
94 | 3/5/2025 | D&MT Investments, LP | TEST | Direct Testimony of Dean Tomme on Behalf of D&MT Investments, LP |
95 | 3/5/2025 | Melinda and Wilton Morris | TEST | Direct Testimony of Melinda N. Morris on Behalf of Melinda and Wilton Morris |
96 | 3/5/2025 | Link 1H Opposition Landowners | PL | Direct Testimony of Brian C. Andrews on behalf of The Link 1H Opposition Landowners |
97 | 3/5/2025 | Link 1H Opposition Landowners | PL | Link 1H Opposition Landowners' Statement of Alignment |
98 | 3/5/2025 | JEFF COATS | TEST | Direct Testimony of Jeff Coats |
99 | 3/5/2025 | San Pancho Ranch LLC | LTRS | Void Letter |
100 | 3/5/2025 | San Pancho Ranch LLC | TEST | Direct Testimony of Chet Fenimore on Behalf of San Pancho Ranch LLC |
101 | 3/6/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | RFI | Brazos Electric Power Cooperative, Inc.'s First Request for Information to San Pancho Ranch, LLC |
102 | 3/7/2025 | JOHN HENRY & REMEDIOS OLDHAM | PL | REQUEST TO INTERVENE |
103 | 3/7/2025 | CRYSTAL ABBEY | PL | REQUEST TO INTERVENE |
104 | 3/7/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC | PL | Brazos Electric Power Cooperative, Inc.'s Limited Objections and Motion to Strike Intervenor Testimony |
105 | 3/7/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | LTRS | Letter regarding Court Reporter for Hearing on the Merits |
106 | 3/10/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | PL | List of Intervenors Who Did Not File Testimony or a Statement of Position |
107 | 3/10/2025 | Kyle Dunwiddie | PL | Intervenor Kyle Dunwiddie's Response to Brazos Electric Power Cooperative, Inc.'s Limited Objections and Motion to Strike Intervenor Testimony |
108 | 3/10/2025 | DAVID BROOKS | PL | RATEPAYER PROTEST |
109 | 3/11/2025 | SOAH | PL | SOAH ORDER NO. 6 - DENYING MOTIONS TO INTERVENE; DISMISSING INTERVENORS; FINDING MOTION TO REVISE PROCEDURAL ORDER MOOT; AND ADDRESSING LIMITED OBJECTIONS AND MOTION TO STRIKE |
110 | 3/12/2025 | PUC LEGAL | PL | PROTECTIVE ORDER CERTIFICATIONS |
111 | 3/12/2025 | PUC LEGAL | TEST | DIRECT TESTIMONY OF CAITLIN GASPAR, INFRASTRUCTURE DIVISION, PUBLIC UTILITY COMMISSION OF TEXAS, March 12, 2025 |
112 | 3/13/2025 | SAN PANCHO RANCH LLC | RFI | San Pancho Ranch LLC's Response to Brazos Electric Power Cooperative, Inc.'s First Request for Information |
113 | 3/13/2025 | San Panch Ranch LLC | RFI | San Pancho Ranch LLC's Response to Brazos Electric Power Cooperative, Inc.'s First Request for Information - Attachment Brazos 1-10 (Native Portion) |
114 | 3/13/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | RFI | Brazos Electric Power Cooperative, Inc.'s Response to Keith Weiser and Eudoris Weiser's First Request for Information |
115 | 3/14/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC | RFI | Brazos's Electric Power Cooperative, Inc.'s Response to Kyle Dunwiddie and Ilse Meier's First Request for Information |
116 | 3/14/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC | RFI | Brazos Electric Power Cooperative, Inc.'s Response to San Pancho Ranch, LLC's Second Request for Information |
117 | 3/18/2025 | BRAZOS ELECTRIC POWER COOPERATIVE | LTRS | Letter Regarding Settlement Progress |
118 | 3/19/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | PL | Brazos Electric Power Cooperative, Inc.'s Notice of Adoption of Testimony |
119 | 3/19/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | TEST | Rebuttal Testimony of Robin King, on behalf of Brazos Electric Power Cooperative, Inc. |
120 | 3/19/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | TEST | Rebuttal Testimony of John Wooten, on behalf of Brazos Electric Power Cooperative, Inc. |
121 | 3/19/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | TEST | Rebuttal Testimony of Curtis Trivitt, P.E. #59170, on behalf of Brazos Electric Power Cooperative, Inc. |
122 | 3/20/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | PL | Unanimous Stipulation and Settlement Agreement |
123 | 3/20/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | PL | Agreed Joint Motion to Admit Evidence, Dismiss Case from SOAH Docket, and Remand Case to the Commission |
124 | 3/24/2025 | SOAH | PL | SOAH ORDER NO. 7 - ADMITTING EVIDENCE AND REMANDING CASE |
125 | 3/26/2025 | TEXAS PARK AND WILDLIFE | PL | TPWD's Comments regarding the Application of Brazos Electric Power Cooperative, Inc. for a Certificate of Convenience and Necessity for the Beecham Gap 138-kilovolt Transmission Line Project in Lampasas and Coryell Counties |
126 | 4/28/2025 | PUC OPDM | PL | ORDER NO. 1 - REQUIRING CLARIFICATION |
127 | 4/29/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC. | PL | Brazos Electric Power Cooperative, Inc.'s Motion to Admit Evidence in Response to Order No. 1 |
128 | 5/1/2025 | BRAZOS ELECTRIC POWER COOPERATIVE, INC | PL | Brazos Electric Power Cooperative, Inc.'s Notice of Change in Counsel |
129 | 5/5/2025 | PUC OPDM | PL | ORDER NO. 2 - ADMITTING SUPPLEMENTAL EVIDENCE |
130 | 5/5/2025 | PUC OPDM | PL | PROPOSED ORDER AND MEMORANDUM |
131 | 5/29/2025 | PUC OPDM | PL | VOID SEE ITEM 132 |
132 | 5/29/2025 | PUC OPDM | PL | VOID LETTER |
133 | 6/12/2025 | PUC OPDM | PL | NOTICE MEMORANDUM |
134 | 6/18/2025 | PUC OPDM | PL | COMMISSION COUNSEL MEMO |
135 | 6/20/2025 | PUC OPDM | PL | ORDER |
136 | 6/20/2025 | PUC OPDM | PL | OUTGOING COMMISSION-SIGNED ORDER MAIL LOG |
137 | 7/2/2025 | PUC OPDM | PL | VOIDE SEE ITEM 138 |
138 | 7/2/2025 | PUC OPDM | PL | VOID LETTER |
139 | 7/7/2025 | BRAZOS ELECTRIC POWER COOP | PL | Affidavit- Landowner Notice of Final Order |