Filings for 50058
Case Style APPLICATION OF EL PASO ELECTRIC COMPANY TO RECONCILE FUEL COSTS
139 filing(s).
Item | File Stamp | Party | Item Type | Filing Description |
---|---|---|---|---|
1 | 9/27/2019 | EL PASO ELECTRIC COMPANY | PL | APPLICATION TO RECONCILE FUEL COSTS |
2 | 9/27/2019 | EL PASO ELECTRIC COMPANY | CONF | CONFIDENTIAL- WORK PAPERS; CD CONTAINING NATVIE FILES; BATE STAMP 1-1 |
3 | 10/1/2019 | PUC OPDM | PL | ORDER NO. 1 |
4 | 10/4/2019 | TIEC | PL | MOTION TO INTERVENE |
5 | 10/8/2019 | PUC LEGAL | PL | PROTECTIVE ORDER CERTIFICATIONS |
6 | 10/9/2019 | PUC LEGAL | PL | COMMISSION STAFF'S RECOMMENDATION ON SUFFICIENCY OF THE APPLICATION AND PROPOSED NOTICE |
7 | 10/10/2019 | PUC OPDM | PL | ORDER NO.2- FINDING APPLICATION AND PROPOSED NOTICE SUFFIIDNT, AND ESTABLISHING INTERVENTION DEADLINE |
8 | 10/14/2019 | PUC LEGAL | RFI | 1ST RFI TO EL PASO ELECTRIC COMPANY QUESTION NOS. STAFF 101 THROUGH 1-2 |
9 | 10/21/2019 | PUC OPDM | PL | ORDER NO. 3 GRANTING MOTION TO INTERVENE |
10 | 10/23/2019 | EL PASO ELECTRIC COMPANY | PRJ | DN 50058 NATIVE EXCEL SCHEDULES AND WORKPAPERS |
11 | 10/28/2019 | PUC LEGAL | RFI | 2ND RFI TO EL PASO ELECTRIC COMPANY QUESTION NOS. STAFF STAFF 2-1 THROUGH 2-15 |
12 | 10/30/2019 | CITY OF EL PASO | PL | MOTION TO INTERVENE |
13 | 11/4/2019 | EL PASO ELECTRIC COMPANY | RFI | RESPONSE TO STAFF'S FIRST REQUEST FOR INFORMATION QUESTION NOS. STAFF 1-1 THROUGH STAFF 1-2 |
14 | 11/18/2019 | EL PASO ELECTRIC COMPANY | RFI | RESPONSE TO STAFF'S SECOND REQUEST FOR INFORMATION QUESTION NOS. STAFF 2-1 THROUGH STAFF 2-15 |
15 | 12/5/2019 | PUC OPDM | PL | ORDER NO.4 GRANTING MOTION TO INTERVENE |
16 | 12/6/2019 | EL PASO ELECTRIC COMPANY | RFI | FIRST SUPPLEMENTAL RESPONSE TO STAFF'S SECOND REQUEST FOR INFORMATION QUESTION NOS STAFF 2-1 THROUGH 2-15 |
17 | 12/11/2019 | VINTON STEEL, LLC | PL | MOTION TO INTERVENE |
18 | 12/16/2019 | OPUC | PL | MOTION TO INTERVENE |
19 | 12/19/2019 | PUC OPDM | PL | ORDER NO. 5 GRANTING MOTIONS TO INTERVENE |
20 | 12/20/2019 | OPUC | PL | PROTECTIVE ORDER CERTIFICATIONS |
21 | 12/20/2019 | EL PASO ELECTRIC COMPANY | PL | STATEMENT IN RESPONSE TO ORDER NO.5 |
22 | 12/30/2019 | EL PASO ELECTRIC COMPANY | PRJ | PROOF OF NOTICE |
23 | 12/30/2019 | EL PASO ELECTRIC COMPANY | RFI | RESPONSE TO CITY OF EL PASO’S FIRST REQUEST FOR INFORMATION QUESTION NOS CEP 1-1 THROUGH 1-30 |
24 | 12/30/2019 | EL PAOS ELECTRIC | CONF | CONFIDENTIAL-CEP 1-1 ATTACHMENT 8,9,10, CEP 1-3 ATTACHMENT 1,2,10,; BATE STAMP 1-1 |
25 | 1/2/2020 | VINTON STEEL LLC | RFI | 1ST RFI TO EL PASO ELECTRIC |
26 | 1/8/2020 | EL PASO ELECTRIC COMPANY | RFI | SECOND SUPPLEMENTAL RESPONSE TO STAFF'S SECOND REQUEST FOR INFORMATION QUESTION NOS STAFF 2-1 THROUGH 2-15 |
27 | 1/9/2020 | TIEC | RFI | 1ST SET OF RFI TO EL PASO ELECTRIC |
28 | 1/17/2020 | OPUC | RFI | 1ST RFI TO EL PASO ELECTRIC COMPANY |
29 | 1/22/2020 | EL PASO ELECTRIC COMPANY | RFI | RESPONSE TO VINTON STEEL FIRST REQUEST FOR INFORMATION QUESTION NOS VS 1-1 THROUGH 1-9 |
30 | 1/23/2020 | OPUC | PL | NOTICE OF CHANGE OF COUNSEL |
31 | 1/29/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY'S RESPONSE TO TEXAS INDUSTRIAL ENERGY CONSUMERS' FIRST SET OF REQUESTS FOR INFORMATION QUESTION NOS. TIEC 1-1 THROUGH TIEC 1-4 |
32 | 1/29/2020 | EL PASO ELECTRIC COMPANY | CONF | CONFIDENTIAL- RESPONSE TO TIEC'S 1ST RFI- ATTACHMENTS 1 AND 2- HIGHLY SENSITVE BATE STAMP- CD |
33 | 1/29/2020 | EL PASO ELECTRIC COMPANY | CONF | CONFIDENTIAL- RESPONSE TO TIEC'S 1ST RFI- ATTACHMENTS 11, 12 AND 13- CONFIDENTIAL BATE STAMP- CD |
34 | 1/29/2020 | VINTON STEEL, LLC | RFI | 2ND RFI ON EL PASO ELECTRIC COMPANY |
35 | 1/29/2020 | TIEC | PL | PROTECTIVE ORDER CERTIFICATIONS |
36 | 2/3/2020 | CITY OF EL PASO | RFI | 1ST RFI TO EL PASO ELECTRIC COMPANY CEP-1-CEP-30 |
37 | 2/6/2020 | EL PASO ELECTRIC COMPANY | RFI | RESPONSE TO OFFICE OF PUBLIC UTILITY COUNSELS FIRST REQUEST FOR INFORMATION QUESTION NOS. OPUC 1-1 THROUGH OPUC 1-13 |
38 | 2/7/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY'S THIRD SUPPLEMENTAL RESPONSE TO STAFF'S SECOND REQUEST FOR INFORMATION QUESTION NOS. STAFF 2-1 THROUGH STAFF 2-15 |
39 | 2/10/2020 | TIEC | RFI | 2ND RFI TO EL PASO ELECTRIC COMPANY |
40 | 2/18/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY’S RESPONSE TO VINTON STEEL’S SECOND REQUEST FOR INFORMATION QUESTION NOS. VS 2-1 THROUGH 2-7 |
41 | 2/25/2020 | CIT OF EL PASO | RFI | RFI TO EL PASO ELECTRIC CEP-2-1 TO CEP 2-29 |
42 | 2/28/2020 | VINTON STEEL, LLC | RFI | 3RD RFI TO EL PASO ELECTRIC COMPANY |
43 | 3/2/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANYS RESPONSE TO TEXAS INDUSTRIAL ENERGY CONSUMERS SECOND SET OF REQUESTS FOR INFORMATION QUESTION NOS. TIEC-2-1 THROUGH TIEC 2-8 |
44 | 3/2/2020 | EL PASO ELECTRIC COMPANY | CONF | CONFIDENTIAL- EL PASO ELECTRIC COMPANY'S RESPONSE TO TIEC'S 2ND RFI TIEC ATTACHEMENT 1 BATE STAMP- CD |
45 | 3/2/2020 | OPUC | RFI | 2ND RFI TO EL PASO ELECTRIC COMPANY |
46 | 3/6/2020 | PUC LEGAL | RFI | 3RD RFI TO EL PASO ELECTRIC COMPANY QUESTION NOS. STAFF 3-1 THROUGH 3-2 |
47 | 3/11/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANYS RESPONSE TO CITY OF EL PASO SECOND REQUESTS FOR INFORMATION QUESTION NOS. CEP 2-1 THROUGH CEP 2-29 |
48 | 3/11/2020 | EL PASO ELECTRIC COMPANY | CONF | CONFIDENTIAL- RESPONSE TO CITY OF EL PASO'S 2ND RFI CEP 2-27 ATTACHMENT 2- HIGHLY SENSITIVE BATE STAMP- CD |
49 | 3/13/2020 | PUC LEGAL | PL | NOTICE OF CHANGE OF COUNSEL |
50 | 3/19/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANYS RESPONSE TO VINTON STEELS THIRD REQUESTS FOR INFORMATION QUESTION NOS. VS 3-1 THROUGH VS 3-3 |
51 | 3/23/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANYS RESPONSE TO OFFICE OF PUBLIC UTILITY COUNSELS SECOND REQUESTS FOR INFORMATION QUESTION NOS. OPUC 2-1 THROUGH OPUC 2-9 |
52 | 3/26/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANYS RESPONSE TO STAFFS THIRD REQUEST FOR INFORMATION QUESTION NOS. STAFF 3-1 THROUGH STAFF 3-2 |
53 | 3/27/2020 | PUC LEGAL | RFI | COMMISSION STAFF'S FOURTH REQUEST FOR INFORMATION |
54 | 4/1/2020 | PUC OPDM | PL | ORDER NO. 6 REQUESTING PROCEDURAL SCHEDULE |
55 | 4/16/2020 | EL PASO ELECTRIC COMPANY | PL | Request for Referral |
56 | 4/16/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY RESPONSE TO STAFF FOURTH REQUEST FOR INFORMATION QUESTION NOS. STAFF 4-1 THROUGH STAFF 4-2 |
57 | 4/22/2020 | EL PASO ELECTRIC COMPANY | PL | Ltr re Response to Order No. 6 |
58 | 6/16/2020 | PUC OPDM | PL | ORDER OF REFERRAL |
59 | 6/17/2020 | SOAH | PL | SOAH ORDER NO. 1-FILING DESCRIPTION; SETTING PREHEARING CONFERENCE; AND REQUIRING A PROPOSED PROCEDURAL SCHEDULE |
60 | 6/30/2020 | PUC LEGAL | PL | COMMISSION STAFF’S PROPOSED LIST OF ISSUES |
61 | 6/30/2020 | EL PASO ELECTRIC COMPANY | PL | EPE List of Issues |
62 | 6/30/2020 | CITY OF EL PASO | PL | CoEP's Notice Pursuant to SOAH Order No. 1 |
63 | 7/1/2020 | OPUC | PL | OPUC'S NOTICE OF PARTICIPATION IN PREHEARING CONFERENCE |
64 | 7/1/2020 | TIEC | PL | NOTICE OF PARTICIPATION |
65 | 7/1/2020 | VINTON STEEL, LLC | PL | NOTICE OF PARTICIPATION |
66 | 7/1/2020 | EL PASO ELECTRIC COMPANY | PL | PARTIES AGREED SCHEDULE |
67 | 7/1/2020 | PUC LEGAL | PL | COMMISSION STAFF'S NOTICE OF PARTICIPATION IN PREHEARING CONFERENCE |
68 | 7/1/2020 | EL PASO ELECTRIC COMPANY | PL | EPE Notification of Participation at PHC |
69 | 7/7/2020 | CITY OF EL PASO | RFI | City of El Paso Third RFI's to El Paso ELectric Co. |
70 | 7/8/2020 | OPUC | RFI | OPUC's 3RD RFI TO EPE |
71 | 7/9/2020 | PUC OPDM | PL | DRAFT PRELIMINARY ORDER |
72 | 7/13/2020 | PUC OPDM | PL | REVISED DRAFT PRELIMINARY ORDER |
73 | 7/15/2020 | CITY OF EL PASO | PL | CoEP's Protective Order Certifications |
74 | 7/15/2020 | KENNEDY REPORTING SERVICE | TRAN | TELEPHONIC PREHEARING CONFERENCE THURSDAY JULY 2 2020 |
75 | 7/16/2020 | PUC OPDM | PL | PRELIMINARY ORDER |
76 | 7/16/2020 | PUC OPDM | PL | OUTGOING COMMISSION SIGNED ORDER MAIL LOG |
77 | 7/17/2020 | SOAH | PL | ORDER NO.2-MEMORIALIZING PREHEARING CONFERENCE; ADOPTING PARTIES AGREED PROCEDURAL SCHEDULE; SETTING HEARING ON THE MERITS; AND ADVISORY ON DOCUMENTS PROVIDED TO THE ALJ'S |
78 | 7/21/2020 | CITY OF EL PASO | RFI | City of El Paso's Fourth Request for Information to El Paso Electric |
79 | 7/23/2020 | FREEPORT-MCMORAN, INC. | PL | FREEPORT-MCMORAN, INC.'S MOTION TO INTERVENE |
80 | 7/24/2020 | FREEPORT-MCMORAN, INC. | PL | FREEPORT-MCMORAN, INC.'S PROTECTIVE ORDER CERTIFICATIONS |
81 | 7/27/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY RESPONSE TO CITY OF EL PASO THIRD REQUESTS FOR INFORMATION QUESTION NOS. CEP 3-1 THROUGH CEP 3-33 |
82 | 7/28/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY RESPONSE TO OFFICE OF PUBLIC UTILITY COUNSEL THIRD REQUESTS FOR INFORMATION QUESTION NOS. OPUC 3-1 THROUGH OPUC 3-5 |
83 | 7/29/2020 | FREEPORT-MCMORAN, INC. | PL | FREEPORT-MCMORAN, INC. PROTECTIVE ORDER CERTIFICATION |
84 | 7/29/2020 | EL PASO ELECTRIC COMPANY | PL | Objection to Motion to Intervene |
85 | 7/30/2020 | CITY OF EL PASO | RFI | City of El Paso's Fifth Request for Information |
86 | 7/30/2020 | TIEC | RFI | TTEXAS INDUSTRIAL ENERGY CONSUMERS’ THIRD SET OF |
87 | 7/31/2020 | FREEPORT-MCMORAN, INC. | PL | RESPONSE OF FREEPORT-MCMORAN, INC. TO OPPOSITION BY EL PASO ELECTRIC TO LATE INTERVENTION OF FREEPORT-MCMORAN, INC. |
88 | 8/3/2020 | CITY OF EL PASO | RFI | City of El Paso's Sixth Request for Information |
89 | 8/5/2020 | SOAH | PL | ORDER NO. 3-GRANTING FREPORT-MCMORAN, INC.'S MOTION TO INTERVENE |
90 | 8/7/2020 | TIEC | RFI | FOURTH SET OF REQUESTS FOR INFORMATION TO EL PASO ELECTRIC COMPANY |
91 | 8/10/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY RESPONSE TO CITY OF EL PASO FOURTH REQUESTS FOR INFORMATION QUESTION NOS. CEP 4-1 THROUGH CEP 4-17 |
92 | 8/10/2020 | SOAH | PL | ORDER NO. 4-PROVIDING REVISED ZOOM DIAL-IN INFORMATION FOR THE HEARING ON THE MERITS |
93 | 8/11/2020 | CITY OF EL PASO | RFI | City of El Paso's Seventh RFI's to EPE |
94 | 8/12/2020 | OPUC | RFI | OPUC'S 4TH RFI TO EPE |
95 | 8/19/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY RESPONSE TO TEXAS INDUSTRIAL ENERGY CONSUMERS THIRD SET OF REQUESTS FOR INFORMATION QUESTION NOS. TIEC 3-1 THROUGH TIEC 3-3 |
96 | 8/19/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY RESPONSE TO CITY OF EL PASO FIFTH REQUESTS FOR INFORMATION QUESTION NOS. CEP 5-1 THROUGH CEP 5-17 |
97 | 8/20/2020 | EL PASO ELECTRIC COMPANY | PL | Errata to Appendix C |
98 | 8/24/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY RESPONSE TO CITY OF EL PASO SIXTH REQUESTS FOR INFORMATION QUESTION NOS. CEP 6-1 THROUGH CEP 6-13 |
99 | 8/27/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY RESPONSE TO TEXAS INDUSTRIAL ENERGY CONSUMERS FOURTH SET OF REQUESTS FOR INFORMATION QUESTION NO. TIEC 4-1 |
100 | 8/27/2020 | CITY OF EL PASO | TEST | Testimony and Exhibits of Scott Norwood |
101 | 8/27/2020 | OPUC | TEST | OPUC'S DIRECT TESTIMONY AND WORKPAPERS OF CLARENCE JOHNSON |
102 | 8/31/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY SUPPLEMENTAL RESPONSE TO CITY OF EL PASO FIRST REQUESTS FOR INFORMATION QUESTION NOS. CEP 1-1 THROUGH CEP 1-30 |
103 | 8/31/2020 | EL PASO ELECTRIC COMPANY | RFI | First Request for Information to City of El Paso |
104 | 8/31/2020 | EL PASO ELECTRIC COMPANY | RFI | First Request for Information to Office of Public Utility Counsel |
105 | 9/1/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY RESPONSE TO OFFICE OF PUBLIC UTILITY COUNSEL FOURTH REQUESTS FOR INFORMATION QUESTION NOS. OPUC 4-1 THROUGH OPUC 4-3 |
106 | 9/3/2020 | PUC LEGAL | TEST | DIRECT TESTIMONY - F. Quijano |
107 | 9/4/2020 | OPUC | RFI | OPUC RESPONSE TO EPE FIRST RFI |
108 | 9/8/2020 | CITY OF EL PASO | PL | CoEP Response to EPE's 1st RFI |
109 | 9/9/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY RESPONSE TO CITY OF EL PASO SEVENTH REQUESTS FOR INFORMATION QUESTION NOS. CEP 7-1 THROUGH CEP 7-7 |
110 | 9/17/2020 | EL PASO ELECTRIC COMPANY | TEST | REBUTTAL TESTIMONY OF JAMES SCHICHTL |
111 | 9/17/2020 | EL PASO ELECTRIC COMPANY | TEST | REBUTTAL TESTIMONY OF DAVID C. HAWKINS |
112 | 9/17/2020 | EL PASO ELECTRIC COMPANY | TEST | REBUTTAL TESTIMONY OF VICTOR MARTINEZ PART 1 OF 2 |
113 | 9/17/2020 | EL PASO ELECTRIC COMPANY | TEST | REBUTTAL TESTIMONY OF VICTOR MARTINEZ PART 2 OF 2 |
114 | 9/21/2020 | CITY OF EL PASO | RFI | 8TH RFI |
115 | 9/22/2020 | CITY OF EL PASO | RFI | City of El Paso's Ninth RFI's to El Paso Electric |
116 | 9/23/2020 | TEXAS INDUSTRIAL ENERGY CONSUMERS | RFI | TIEC's 5th RFI to El Paso Electric |
117 | 9/25/2020 | EL PASO ELECTRIC COMPANY | PL | Letter to ALJs re Hearing |
118 | 9/28/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY RESPONSE TO TEXAS INDUSTRIAL ENERGY CONSUMERS FIFTH SET OF REQUESTS FOR INFORMATION QUESTION NO. TIEC 5-1 THROUGH TIEC 5-3 |
119 | 9/28/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY RESPONSE TO CITY OF EL PASO EIGHTH REQUESTS FOR INFORMATION QUESTION NOS. CEP 8-1 THROUGH CEP 8-14 |
120 | 9/28/2020 | EL PASO ELECTRIC COMPANY | RFI | EL PASO ELECTRIC COMPANY RESPONSE TO CITY OF EL PASO NINTH REQUESTS FOR INFORMATION QUESTION NOS. CEP 9-1 THROUGH CEP 9-15 |
121 | 9/28/2020 | TIEC | PL | TEXAS INDUSTRIAL ENERGY CONSUMERS' STATEMENT OF POSITION |
122 | 9/28/2020 | FREEPORT-MCMORAN, INC. | PL | FREEPORT-MCMORAN, INC.'S STATEMENT OF POSITION |
123 | 9/29/2020 | EL PASO ELECTRIC COMPANY | PL | Letter to ALJs requesting postponement of hearing |
124 | 9/30/2020 | SOAH | PL | ORDER NO. 5- CONTINUING HEARING ON THE MERITS TO OCTOBER 12, 2020 |
125 | 10/7/2020 | EL PASO ELECTRIC COMPANY | LTRS | Request for Abatement of Schedule |
126 | 10/7/2020 | SOAH | PL | ORDER NO. 6-GRANTING REQUEST TO ABATE PROCEDURAL SCHEDULE AND CANCELLING HEARING ON THE MERITS |
127 | 11/2/2020 | EL PASO ELECTRIC COMPANY | LTRS | Status Report |
128 | 12/2/2020 | EL PASO ELECTRIC COMPANY | PL | Status Report |
129 | 1/6/2021 | EL PASO ELECTRIC COMPANY | PL | Status Report |
130 | 1/15/2021 | EL PASO ELECTRIC COMPANY | PL | Joint Motion to Implement Stipulation and Agreement |
131 | 1/15/2021 | EL PASO ELECTRIC COMPANY | TEST | Settlement Testimony of James Schichtl |
132 | 1/15/2021 | PUC LEGAL | TEST | TESTIMONY IN SUPPORT OF AGREEMENT - F. QUIJANO |
133 | 1/22/2021 | SOAH | PL | ORDER NO.7- GRANTING MOTION TO ADMIT EVIDENCE, REMANDING DOCKET, AND DISMISSING CASE FROM SOAH DOCKET |
134 | 2/24/2021 | PUC OPDM | PL | PROPOSED ORDER & MEMORANDUM |
135 | 3/8/2021 | PUC LEGAL | PL | COMMISSION STAFF'S CORRECTIONS TO THE PROPOSED ORDER |
136 | 3/8/2021 | OPUC | PL | OPUC'S RESPONSE TO OFFICE OF POLICY AND DOCKET MANAGEMENT'S NOTICE |
137 | 3/9/2021 | PUC OPDM | PL | CORRECTION PROPOSED ORDER MEMORANDUM |
138 | 4/7/2021 | PUC OPDM | PL | ORDER |
139 | 4/7/2021 | PUC OPDM | PL | OUTGOING COMMISSION-SIGNED ORDER MAIL LOG |