Filings for 48400
Case Style JOINT APPLICATION OF RAYBURN COUNTRY ELECTRIC COOPERATIVE INC. AND LONE STAR TRANSMISSION LLC TO TRANSFER LOAD TO ERCOT, FOR SALE OF TRANSMISSION FACILITIES, AND TRANSFER OF CERTIFICATE RIGHTS IN HENDERSON AND VAN ZANDT COUNTIES
224 filing(s).
Item | File Stamp | Party | Item Type | Filing Description |
---|---|---|---|---|
1 | 5/30/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | PL | JOINT APPLICATION OF RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC TO TRANSFER LOAD TO ERCOT, FOR SALE OF TRANSMISSION FACILITIES, AND TRANSFER OF CERTIFICATE RIGHTS IN HENDERSON AND VAN ZANDT COUNTIES |
2 | 5/30/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | TEST | DIRECT TESTIMONY OF DAVID A. NAYLOR |
3 | 5/30/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | TEST | DIRECT TESTIMONY OF AUNDREA N. WILLIAMS |
4 | 5/30/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | TEST | DIRECT TESTIMONY OF DANIEL J. MAYERS |
5 | 5/30/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | TEST | DIRECT TESTIMONY OF MEHRIAR TABRIZI, PhD, PE |
6 | 5/30/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | TEST | DIRECT TESTIMONY OF CARL N. STOVER, JR. |
7 | 5/30/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | TEST | DIRECT TESTIMONY OF EVAN C. ROWE |
8 | 5/30/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | PL | APPLICANTS’ NOTICE OF CONFIDENTIAL FILING |
9 | 5/30/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | CONF | CONFIDENTIAL- ATTACHMENT ANW-1; BATE STAMP 1-84 |
10 | 6/13/2018 | ERCOT | PL | MOTION TO INTERVENE |
11 | 6/15/2018 | PUC OPDM | PL | ORDER NO. 1 - REQUIRING COMMISSION STAFF RECOMMENDATION; SCHEDULING PREHEARING CONFERENCE |
12 | 6/15/2018 | PUC OPDM | PL | NOTICE OF APPLICATION FOR SALE, TRANSFER, OR MERGER AND TO TRANSFER LOAD TO ERCOT |
13 | 6/20/2018 | PUC OPDM | PL | ACKNOWLEDGMENT OF RECEIPT |
14 | 6/20/2018 | PUC LEGAL | PL | PROTECTIVE ORDER CERTIFICATIONS |
15 | 6/22/2018 | ERCOT | PL | ERCOT'S PROTECTIVE ORDER CERTIFICATIONS |
16 | 6/22/2018 | PUC OPDM | PL | THE ABOVE REFERENCED DOCKET HAS BEEN PLACED ON THE AGENDA OF THE JUNE 28, 2018 OPEN MEETING |
17 | 6/25/2018 | SOUTHWEST POWER POOL, INC. | PL | MOTION TO INTERVENE |
18 | 6/26/2018 | PUC LEGAL | PL | RECOMMENDATION ON APPLICATION SUFFICIENCY AND NOTICE |
19 | 6/28/2018 | TIEC | PL | MOTION TO INTERVENE |
20 | 6/28/2018 | PUC OPDM | PL | ORDER NO.2 DEEMING APPLICATION AND TEXT OF NOTICE SUFFICIENT, AND REQUIRING ADDITIONAL NOTICE |
21 | 6/28/2018 | PUC OPDM | PL | DUPLICATE OF ITEM NO. 20 |
22 | 7/2/2018 | PUC OPDM | PL | ORDER NO.3 MEMORIALIZING PREHEARING CONFERENC AND ADOPTING PROCEDURAL SCHEDULE |
23 | 7/5/2018 | PUC LEGAL | PL | PROTECTIVE ORDER CERTIFICATION |
24 | 7/6/2018 | PUC OPDM | PL | DOCKET HAS BEEN PLACED ON THE AGENDA OF THE OPEN MEETING SCHEDULED TO BEGIN AT 9:30 AM ON JULY 12,2018 |
25 | 7/10/2018 | SOUTHWEST POWER POOL, INC. | PL | SOUTHWEST POWER POOL, INC.'S PROTECTIVE ORDER CERTIFICATIONS |
26 | 7/13/2018 | JIM WISE | PL | REQUESTING TO BE REGISTERED AS AN INTERVENOR AND COMMENTER |
27 | 7/13/2018 | KENNEDY REPORTING SERVICE | PL | PREHEARING CONFERENCE THURSDAY, JUNE 28, 2018 PAGES 1-13 |
28 | 7/16/2018 | TIEC | RFI | 1ST RFI TO RAYBURN COUNTRY ELECTRIC COOP |
29 | 7/16/2018 | TIEC | RFI | 1ST RFI TO LONESTAR TRANSMISSION |
30 | 7/18/2018 | PUC LEGAL | PL | NOTICE OF CHANGE OF COUNSEL AND PROTECTIVE ORDER CERTIFICATION |
31 | 7/20/2018 | PUC OPDM | PRJ | THE ABOVE REFERENCED DOCKET HAS BEEN PLACE ON THE AGENDA OF THE OPEN MEETING SCHEDULED TO BEGIN AT 9:30 ON JULY 26,2018 |
32 | 7/20/2018 | PUC LEGAL | PL | COMMISSION STAFF'S FIRST RFI TO RAYBURN COUTRY ELECTRIC COOPERATIVE INC. QUESTION NOS STAFF 1-1 THROUGH STAFF 1-5 |
33 | 7/20/2018 | PUC LEGAL | PL | COMMISSION STAFF'S FIRST RFI TO LONESTAR TRANSMISSION LLC QUESTION NOS STAFF1-1 THROUGH STAFF 1-2 |
34 | 7/26/2018 | LONE STAR TRANSMISSION LLC | CONF | CONFIDENTIAL- ATTACHMENT 1 TO LONE STAR- TIEC 1-6 BATE STAMP 1-93 |
35 | 7/26/2018 | LONE STAR TRANSMISSION LLC | CONF | CONFIDENTIAL- ATTACHMENT 2 TO LONE STAR- TIEC 1-6 BATE STAMP 1-33 |
36 | 7/26/2018 | LONE STAR TRANSMISSION, LLC | PL | Lone Star Transmission, LLC's Notice of Confidential Filing |
37 | 7/26/2018 | LONE STAR TRANSMISSION, LLC | RFI | Lone Star Transmission, LLC's Response to Texas Industrial Energy Consumers' First Request for Information Question Nos. TIEC 1-1 Through TIEC 1-7 |
38 | 7/26/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | Rayburn's Response to Texas Industrial Energy Consumers' First Request for Information |
39 | 7/30/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | RESPONSE TO COMMISSION STAFF'S 1ST RFI |
40 | 7/30/2018 | LONE STAR TRANSMISSION LLC | RFI | RESPONSE TO COMMISSION STAFF'S FIRST RFI; QUESTION NOS. STAFF 1-1 THROUGH STAFF 1-2 |
41 | 7/31/2018 | TIEC | RFI | 2ND RFI TO LONESTAR TRANSMISSION |
42 | 7/31/2018 | TIEC | RFI | 2ND RFI TO RAYBURN COUNTY ELECTRIC |
43 | 8/7/2018 | ONCOR ELECTRIC DELIVERY CO | PL | MOTION TO INTERVENE |
44 | 8/7/2018 | TIEC | RFI | 3RD RFI TO RAYBURN COUNTY ELECTRIC |
45 | 8/7/2018 | EAST TEXAS ELECTRIC COOPERATIVE, INC. | PL | MOTION TO INTERVENE |
46 | 8/8/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | RESPONSE TO TIEC'S 2ND RFI |
47 | 8/9/2018 | EAST TEXAS ELECTRIC COOPERATIVE | PL | PROTECTIVE ORDER CERTIFICATIONS |
48 | 8/9/2018 | LONE STAR TRANSMISSION LLC | RFI | RESPONSE TO TIEC'S 2ND RFI |
49 | 8/9/2018 | LONE STAR TRANSMISSION LLC | RFI | RESPONSE TO TIEC'S 2ND RFI |
50 | 8/9/2018 | TIEC | RFI | 1ST RFI TO ONCOR ELECTRIC |
51 | 8/9/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | 1ST RFI TO ERCOT |
52 | 8/9/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | 1ST RFI TO ONCOR ELECTRIC DELIVERY COMPANY |
53 | 8/10/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | PL | PROTECTIVE ORDER CERTIFICATIONS |
54 | 8/13/2018 | ONCOR ELECTRIC DELIVERY COMPANY | RFI | 1ST RFI TO RAYBURN COUNTRY ELECTRIC |
55 | 8/13/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | RFI | ONCOR ELECTRIC DELIVERY COMPANY LLC'S FIRST REQUEST FOR INFORMATION TO LONE STAR TRANSMISSION, LLC |
56 | 8/13/2018 | ONCOR ELECTRIC DELIVERY COMPANY | RFI | 1ST RFI TO ERCOT |
57 | 8/14/2018 | ONCOR ELECTRIC DELIVERY CO | PL | OBJECTIONS TO RAYBURN COUNTRY ELECTRIC COOPERATIVE INC'S FIRST SET FOR INFORMATION TO ONCOR |
58 | 8/15/2018 | TIEC | PL | PROTECTIVE ORDER CERTIFICATIONS |
59 | 8/16/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | PL | RAYBURN'S PROTECTIVE ORDER CERTIFICATIONS |
60 | 8/17/2018 | PUC LEGAL | RFI | 2ND RFI TO LONE STAR TRANSMISSION |
61 | 8/17/2018 | PUC LEGAL | RFI | 1ST RFI TO ONCOR |
62 | 8/17/2018 | PUC LEGAL | RFI | 1ST RFI TO ERCOT |
63 | 8/17/2018 | PUC LEGAL | RFI | 2ND RFI TO RAYBURN ELECTRIC |
64 | 8/17/2018 | PUC OPDM | PL | ORDER NO.4 GRANTING MOTIONS TO INTERVENE |
65 | 8/17/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | PL | NOTICE OF DISCOVERY AGREEMENT |
66 | 8/17/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | RAYBURN'S RESPONSE TO TEXAS INDUSTRIAL ENERGY CONSUMERS' THIRD REQUEST FOR INFORMATION |
67 | 8/20/2018 | ERCOT | RFI | RESPONSES TO APPLICANTS' 1ST RFI |
68 | 8/20/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | PL | OBJECTIONS TO ONCOR'S 1ST RFI |
69 | 8/20/2018 | ONCOR ELECTRIC DELIVERY COMPANY | RFI | RESPONSE TO TIEC'S 1ST RFI |
70 | 8/20/2018 | ONCOR ELECTRIC DELIVERY COMPANY | PL | STATEMENT REGARDING PROTECTED MATERIALS FOR APPLICANT'S 1ST RFI |
71 | 8/20/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | RFI | RESPONSE OF ONCOR ELECTRIC DELIVERY COMPANY LLC TO APPLICANTS' FIRST REQUESTS FOR INFORMATION |
72 | 8/20/2018 | LONE STAR TRANSMISSION, LLC | PL | Lone Star Transmission, LLC's Objections to Oncor Electric Delivery Company's First Request for Information |
73 | 8/20/2018 | LONE STAR TRANSMISSION LLC | PL | Lone Star Transmission, LLC's Protective Order Certifications |
74 | 8/21/2018 | TIEC | RFI | 2ND RFI TO ONCOR ELECTRIC |
75 | 8/22/2018 | ONCOR ELECTRIC DELIVERY COMPANY | RFI | RESPONSE TO COMMISSION STAFF'S 1ST RFI |
76 | 8/23/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | PL | Rayburn Country Electric Cooperative, Inc.'s Notice of Confidential Filing |
77 | 8/23/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | Rayburn's Response to Oncor Electric Company LLC's First Request for Information |
78 | 8/23/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | CONF | CONFIDENTIAL - RESPONSE OF RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC TO ONCOR ELECTRIC DELIVERY LLC'S FIRST RFI ATTACHMENT - RAYBURN - ONCOR RFI 1 - 13.1 (CONF); BATE STAMP: 1 |
79 | 8/23/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | CONF | CONFIDENTIAL - RESPONSE OF RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC TO ONCOR ELECTRIC DELIVERY LLC'S FIRST RFI ATTACHMENT - RAYBURN - ONCOR RFI 1 - 23(a) (CONF) (DISK) (CONF); ATTACHMENT RAYBURN-ONCOR I-23(b) (CONF) BATE STAMP 1 OF 1 |
80 | 8/23/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | CONF | RESPONSE OF RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC TO ONCOR ELECTRIC DELIVERY COMPANY LLC'S FIRST RFI - ATTACHMENT RAYBURN-ONCOR RFI 1-22(d) (CONF); BATE STAMP; 1OF 1 |
81 | 8/23/2018 | ERCOT | PL | ERCOT'S RESPONSES TO ONCOR ELECTRIC DELIVERY COMPANY LLC'S FIRST REQUEST FOR INFORMATION TO ERCOT QUESTION NOS. 1-1 THROUGH 1-3 |
82 | 8/23/2018 | ERCOT | PL | NOTICE OF CONFIDENTIAL FILING |
83 | 8/23/2018 | ERCOT | CONF | CONFIDENTIAL- RESPONSES TO ONCOR'S 1ST RFI BATE STAMP CD |
84 | 8/23/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | PL | NOTICE OF DISCOVERY AGREEMENT |
85 | 8/23/2018 | LONE STAR | RFI | Lone Star Transmission, LLC's Response to Oncor Electric Delivery Company LLC's First Request for Information Question Nos. 1-1 Through 1-31 |
86 | 8/23/2018 | LONE STAR | CONF | CONFIDENTIAL - ATTACHMENT 2 TO LONE STAR-ONCOR (HIGHLY SENSITIVE); BATE STAMP: 1 TO 49 |
87 | 8/23/2018 | LONE STAR | CONF | CONFIDENTIAL - ATTACHMENT 1 TO LONE STAR-ONCOR 1 - 3 (CONFIDENTIAL); BATE STAMP: 1 TO 4 |
88 | 8/23/2018 | LONE STAR | CONF | CONFIDENTIAL - ATTACHMENT 1 TO LONE STAR-ONCOR 1 - 22(CONFIDENTIAL); BATE STAMP: 1 TO 7 |
89 | 8/23/2018 | LONE STAR | CONF | CONFIDENTIAL - ATTACHMENT 1 TO LONE STAR-ONCOR 1 - 25(d) (HIGHLY SENSITIVE ); BATE STAMP: 1 TO 4 |
90 | 8/23/2018 | LONE STAR | CONF | CONFIDENTIAL - ATTACHMENT 1 TO LONE STAR-ONCOR 1 - 27(HIGHLY SENSITIVE ); BATE STAMP: 1 TO 1 |
91 | 8/23/2018 | LONE STAR TRANSMISSION LLC | PL | REQUEST FOR NON-DISCLOSURE OF CERTAIN HIGHLY SENSITIVE PROTECTED MATERIALS TO ONCOR |
92 | 8/23/2018 | LONE STAR TRANSMISSION LLC | PL | NOTICE OF CONFIDENTIAL MATERIALS |
93 | 8/23/2018 | LONE STAR TRANSMISSION LLC | CONF | CONFIDENTIAL- ATTACHMENT 2 TO LONE STAR-ONCOR 1-2 BATE STAMP 1-49 |
94 | 8/23/2018 | LONE STAR TRANSMISSION LLC | CONF | CONFIDENTIAL- ATTACHMENT 1 TO LONE STAR-ONCOR 1-25 BATE STAMP 1-4 |
95 | 8/24/2018 | PUC OPDM | PL | DOCKET HAS BEEN PLACED ON THE AGENDA OF THE OPEN MEETING ON AUGUST 30, 2018 |
96 | 8/27/2018 | LONE STAR TRANSMISSION LLC | RFI | NON-DISCLOSURE OF CERTIAN HIGHLY SENSITIVE PROTECTED MATERIALS TO ONCOR |
97 | 8/27/2018 | LONE STAR TRANSMISSION LLC | RFI | RESPONSE TO COMMISSION STAFF'S SECOND RFI QUESTION NO. 2-1 |
98 | 8/27/2018 | LONE STAR TRANSMISSION LLC | PL | NOTICE OF CONFIDENTIAL MATERIALS |
99 | 8/27/2018 | LONE STAR TRANSMISSION LLC | CONF | CONFIDENTIAL: ATTACHMENT 1 TO LONE STAR-STAFF 2-1(HIGHLY SENSITIVE) |
100 | 8/27/2018 | ERCOT | PL | PROTECTIVE ORDER CERTIFICATIONS |
101 | 8/27/2018 | ERCOT | RFI | RESPONSES TO COMMISSION STAFF'S FIRST RFI TO ERCOT QUESTION NOS. STAFF 1-1 THROUGH STAFF 1-2 |
102 | 8/27/2018 | LONE STAR TRANSMISSION LLC | RFI | RESPONSE TO COMMISSION STAFF'S SECOND RFI QUESTION NO 2-1 |
103 | 8/27/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | PL | PROTECTIVE ORDER CERTIFICATIONS |
104 | 8/27/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | RAYBURN'S RESPONSE TO COMMISSION STAFF'S SECOND REQUEST FOR INFORMATION |
105 | 8/28/2018 | SOUTHWEST POWER POOL | TEST | DIRECT TESTIMONY OF CHARLES LOCKE |
106 | 8/28/2018 | SOUTHWEST POWER POOL, INC. | TEST | DIRECT TESTIMONY OF ANTOINE LUCAS |
107 | 8/28/2018 | ERCOT | TEST | ERCOT'S DIRECT TESTIMONY OF JEFFREY BILLO |
108 | 8/28/2018 | EAST TEXAS ELECTRIC COOPERATIVE, INC. | TEST | Direct Testimony of David M. Brian on behalf of East Texas Electric Cooperative, Inc. |
109 | 8/28/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | TEST | DIRECT TESTIMONY OF EITHAR NASHAWATI |
110 | 8/28/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | TEST | DIRECT TESTIMONY OF ELLEN E. BUCK |
111 | 8/28/2018 | TIEC | TEST | DIRECT TESTIMONY OF CHARLES S. GRIFFEY |
112 | 8/30/2018 | PUC LEGAL | PL | PROTECTIVE ORDER CERTIFICATIONS |
113 | 8/30/2018 | PUC LEGAL | PL | PROTECTIVE ORDER CERTIFICATIONS |
114 | 8/31/2018 | LONE STAR TRANSMISSION LLC | PL | NOTICE OF DISCOVERY AGREEMENT |
115 | 8/31/2018 | ONCOR ELECTRIC DELIVERY COMPANY | RFI | RESPONSE TO TIEC'S 2ND RFI |
116 | 9/6/2018 | TIEC | RFI | 4TH RFI TO RAYBURN COUNTRY ELECTRIC |
117 | 9/6/2018 | TIEC | RFI | 3RD RFI TO LONESTAR TRANSMISSION, LLC |
118 | 9/6/2018 | TIEC | RFI | 1ST RFI TO ERCOT |
119 | 9/6/2018 | TIEC | RFI | 3RD RFI TO ONCOR ELECTRIC |
120 | 9/7/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | RFI | 2ND REDI TO RAYBURN COUNTRY ELECTRIC |
121 | 9/7/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | RFI | 2ND RFI TO LONE STAR TRANSMISSION |
122 | 9/7/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | RFI | 1ST RFI TO TIEC |
123 | 9/10/2018 | LONE STAR TRANSMISSION, LLC | RFI | Lone Star Transmission, LLC's 2nd RFI to Oncor Electric Delivery Company LLC |
124 | 9/10/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | Rayburn's Second Request for Information to Electric Reliability Council of Texas Question Nos. 2-1 through 2-16 |
125 | 9/10/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | Rayburn's First Request for Information to Southwest Power Pool, Inc. Question Nos. 1-1 through 1-19 |
126 | 9/10/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | Rayburn's First Request for Information to Texas Industrial Energy Consumers Question Nos. 1-1 through 1-13 |
127 | 9/11/2018 | PUC LEGAL | PL | DIRECT TESTIMONY OF JOHN POOLE |
128 | 9/11/2018 | PUC LEGAL | TEST | DIRECT TESTIMONY OF GRANT GERVAIS |
129 | 9/11/2018 | PUC LEGAL | TEST | WORKPAPERS TO THE DIRECT TESTIMONY OF GRANT GERVAIS (CD) |
130 | 9/11/2018 | PUC LEGAL | TEST | DIRECT TESTIMONY OF REGINALD TUVILLA |
131 | 9/12/2018 | PUC LEGAL | TEST | WORKPAPERS TO THE DIRECT TESTIMONY OF REGINALD TUVILLA |
132 | 9/12/2018 | PUC LEGAL | TEST | WORKPAPERS TO THE DIRECT TESTIMONY OF JOHN POOLE |
133 | 9/12/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | 3RD RFI TO ONCOR ELECTRIC |
134 | 9/12/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | 1ST RFI TO STAFF OF THE PUCT |
135 | 9/12/2018 | LONE STAR TRANSMISSION LLC | PL | OBJECTIONS TO ONCOR ELECTRICS 2ND RFI |
136 | 9/12/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | Rayburn's Third Request for Information to Electric Reliability Council of Texas Question Nos. 3-1 through 3-3 |
137 | 9/12/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | Rayburn's Second Request for Information to Southwest Power Pool, Inc. Question No. 2-1 |
138 | 9/14/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | 4TH RFI TO ONCOR ELECTRIC |
139 | 9/14/2018 | SOUTHWEST POWER POOL, INC. | PL | LETTER TO JUDGE PEARSON |
140 | 9/17/2018 | ERCOT | PL | REPONSE TO TEXAS INDUSTRIAL ENERGY CONSUMERS' FIRST RFI TO ERCOT QUESTION NO. TIEC 1-1 |
141 | 9/17/2018 | TIEC | RFI | RESPONSES TO ONCOR ELECTRIC FIRST RFI |
142 | 9/17/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | RESPONSE TO TIEC'S FOURTH RFI |
143 | 9/17/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | RFI | RESPONSE TO ONCOR SECOND RFI |
144 | 9/17/2018 | ONCOR ELECTRIC DELIVERY COMPANY | PL | NOTICE OF DISCOVERY AGREEMENT |
145 | 9/17/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | RFI | RESPONSE TO TIEC THIRD RFI |
146 | 9/17/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | RFI | RESPONSE TO TIEC SECOND RFI QUESTION NO. 2-01 |
147 | 9/17/2018 | LONE STAR | RFI | LONE STAR TRANSMISSION, LLC'S RESPONSE TO ONCOR ELECTRIC DELIVERY COMPANY LLC'S SECOND REQUEST FOR INFORMATION QUESTION NOS. 2-1 THROUGH 2-11 |
148 | 9/17/2018 | LONE STAR | CONF | CONFIDENTIAL: ATTACHMENT 1 TO LONE STAR-ONCOR 2-8; BATE STAMP:1-88 |
149 | 9/17/2018 | LONE STAR | PL | NOTICE OF CONFIDENTIAL FILING |
150 | 9/17/2018 | LONE STAR TRANSMISSION, LLC | RFI | RESPONSE TO TIEC THIRD RFI QUESTION NO. TIEC3-1 |
151 | 9/17/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | PL | Applicant's Proof of Notice |
152 | 9/18/2018 | SOUTHWEST POWER POOL, INC | PL | ERRATA TO THE DIRECT TESTIMONEY OF CHARLES LOCKE |
153 | 9/18/2018 | RAYBURN ELECTRIC COOPERATIVE, INC AND LONE STAR TRANSMISSION, LLC | RFI | FOURTH RFI TO THE ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC QUESTION NOS. 4 - 1 THROUGH 4 - 4 |
154 | 9/19/2018 | LONE STAR TRANSMISSION LLC | PL | PROTECTIVE ORDER CERTIFICATIONS |
155 | 9/20/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | RFI | RESPONSE OF ONCOR ELECTRIC DELIVERY COMPANY LLC TO LONE STAR TRANSMISSION SECOND REQUEST FOR INFORMATION |
156 | 9/20/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | PL | STATEMENT REGARDING PROTECTED MATERIALS FOR LONE STAR'S 2ND RFI |
157 | 9/20/2018 | ERCOT | RFI | ERCOT'S RESPONSES TO RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC.'S SECOND REQUEST FOR INFORMATION TO ERCOT QUESTION NOS. 2-1 THROUGH 2-16 |
158 | 9/20/2018 | TEXAS INDUSTRIAL ENERGY CONSUMERS | RFI | TIEC's Responses to Rayburn Country Electric Cooperative's First Request for Information |
159 | 9/20/2018 | SOUTHWEST POWER POOL, INC. | PL | SOUTHWEST POWER POOL, INC.'S RESPONSE TO RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC.'S FIRST REQUESTS FOR INFORMATION |
160 | 9/20/2018 | SOUTHWEST POWER POOL | PL | CONFIDETNIALITY STATEMENT UNDER SECTION 4 OF THE PROTECTIVE ORDER |
161 | 9/20/2018 | SOUTHWEST POWER POOL | CONF | CONFIDENTIAL- RESPONSE TO RCEC RFI 1-1- BATE STAMP 1-1 |
162 | 9/21/2018 | PUC OPDM | PL | THE ABOVE REFERENCED DOCKET HAS BEN PLACED ON THE AGENDA OF THE OPEN MEETING SCHEDULED ON SEPT 27TH, 2018 |
163 | 9/21/2018 | PUC LEGAL | PL | Commission Staff's Response to Rayburn Country Electric Coop and Lone Star Transmission First RFI Question Nos. 1-1 through 1-32 |
164 | 9/24/2018 | ERCOT | RFI | RESPONSES TO APPLICANTS' 4TH RFI |
165 | 9/24/2018 | ERCOT | RFI | AMENDED RESPONSES TO APPLICANTS' 1ST RFI |
166 | 9/24/2018 | ERCOT | RFI | RESPONSES TO APPLICANTS' RAYBURN COUNTRY ELECTRIC'S 3RD RFI |
167 | 9/24/2018 | PUC LEGAL | TEST | ERRATA TO DIRECT TESTIMONY OF GRANT GERVIS |
168 | 9/24/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | PL | STATEMENT REGARDING PROTECTED MATERIALS FOR APPLICANT'S 4TH RFI |
169 | 9/24/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | RFI | RESPONSE TO APPLICANT'S 3RD RFI |
170 | 9/24/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | RFI | RESPONSE OF ONCOR ELECTRIC DELIVERY COMPANY LLC TO APPLICANTS' FOURTH REQUEST FOR INFORMATION |
171 | 9/24/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | CONF | CONFIDENTIAL- RESPONSE OF ONCOR ELECTRIC DELIVERY COMPANY LLC TO APPLICANTS' FOURTH REQUEST FOR INFORMATION BATE STAMP 1-22 |
172 | 9/24/2018 | SOUTHWEST POWER POOL, INC. | RFI | RESPONSE TO RAYBURN COUNTRY ELECTRIC'S 2ND RFI |
173 | 9/24/2018 | LONE STAR TRANSMISSION LLC | RFI | RESPONSE TO ONCOR'S RFI NOS. 2-1 THROUGH 2-5 |
174 | 9/25/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | TEST | REBUTTAL TESTIMONY OF CARL N. STOVER, JR. |
175 | 9/25/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | TEST | REBUTTAL TESTIMONY OF DAVID A. NAYLOR |
176 | 9/25/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | PL | SUPPLEMENTAL RESPONSE TO LONE STAR TRANSMISSION'S 2ND RFI |
177 | 9/25/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | TEST | CROSS REBUTTAL TESTIMONY OF ELLEN E. BUCK |
178 | 9/25/2018 | ONCOR ELECTRIC DELIVERY COMPANY LLC | TEST | Cross Rebuttal Testimony of Eithar Nashawati |
179 | 9/25/2018 | TEXAS INDUSTRIAL ENERGY CONSUMERS | TEST | Cross Rebuttal Testimony of Charles S. Griffey |
180 | 9/25/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | TEST | Rebuttal Testimony of David J. Turner |
181 | 9/25/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | CONF | CONFIDENTIAL-ATTACHMENT MAT-R-3; BATE STAMP 1-1 |
182 | 9/25/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | TEST | Rebuttal Testimony of Mehriar Tabrizi |
183 | 9/25/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | TEST | Rebuttal Testimony of Daniel J. Mayers |
184 | 9/25/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | TEST | Rebuttal Testimony of Evan C. Rowe |
185 | 9/25/2018 | LONE STAR TRANSMISSION LLC | PL | NOTICE OF CONFIDENTIAL MATERIALS |
186 | 9/25/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. AND LONE STAR TRANSMISSION, LLC | TEST | Rebuttal Testimony of Aundrea N. Williams |
187 | 9/27/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | PL | Motion to Abate Procedural Schedule |
188 | 9/27/2018 | PUC LEGAL | PL | PRELIMINARY RESPONSE TO RAYBURN ELECTRIC'S MOTION TO ABATE |
189 | 9/28/2018 | PUC OPDM | PL | ORDER NO.5 REQUIRING RESPONSE |
190 | 9/28/2018 | PUC LEGAL | RFI | 3RD RFI TO RAYBURN |
191 | 9/28/2018 | PUC LEGAL | RFI | 1ST RFI TO SOUTHWEST POWER POOL |
192 | 9/28/2018 | RAYBURN COUNTRY ELECTRIC | PL | Joint Response Motion to Abate |
193 | 9/28/2018 | LONE STAR TRANSMISSION, LLC | PL | NOTICE OF DISCOVERY AGREEMENT |
194 | 10/1/2018 | PUC OPDM | PL | ORDER NO.6 CANCELING HEARING, GRANTING JOINT MOTION, ABATING PROCEEDING, AND REQUIRING FILING |
195 | 10/5/2018 | PUC OPDM | PL | THE ABOVE REFERENCED DOCKET HAS BEEN PLACED ON THE AGENDA OF THE OPEN MEETING ON OCTOBER 12, 2018 |
196 | 10/15/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | PL | Status Report |
197 | 10/16/2018 | PUC OPDM | PL | ORDER NO. 7 REQUIRING STATUS REPORT |
198 | 10/23/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | PL | Status Report |
199 | 10/24/2018 | JIM WISE | PL | INTERVENER, RESPONSE ADDRESSING HIS CONCERNS AND OBJECTIONS |
200 | 11/5/2018 | PUC LEGAL | PL | THE DOCKET HAS BEEN PLACED ON THE AGENDA OF THE OPEN MEETING ON NOV 8, 2018 |
201 | 11/6/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | PL | STATUS REPORT |
202 | 11/16/2018 | ERCOT | PL | ERCOT'S STATEMENT OF POSITION |
203 | 11/20/2018 | PUC OPDM | PL | THE ABOVE REFERENCED DOCKET HAS BEEN PLACED ON THE AGENDA OF THE OPEN MEETING ON DEC 7TH, 2018 |
204 | 11/29/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | PL | STIPULATION |
205 | 11/29/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | TEST | DIRECT TESTIMONY IN SUPPORT OF STIPULATION OF DAVID A. NAYLOR |
206 | 11/29/2018 | RAYBURN COUNTRY ELECTRIC COOPERATIVE, INC. | PL | JOINT MOTION TO ADMIT EVIDENCE |
207 | 11/30/2018 | PUC LEGAL | TEST | DIRECT TESTIMONY IN SUPPORT OF THE SETTLEMENT OF JOHN POOLE |
208 | 11/30/2018 | PUC LEGAL | TEST | TESTIMONY IN SUPPORT OF SETTLEMENT BY GRANT GERVAIS |
209 | 12/7/2018 | PUC OPDM | PL | ORDER NO. 8 UNABATING PROCEEDING |
210 | 12/7/2018 | PUC OPDM | PL | ORDER NO.9 ADMITTING EVIDENCE |
211 | 12/14/2018 | PUC OPDM | PL | THE ABOVE REFERENCED DOCKET HAS BEEN PLACED ON THE AGENDA OF THE OPEN MEETING SCHEDULED TO BEGIN AT 9:30 AM ON DECEMBER 20, 2018 |
212 | 1/11/2019 | PUC OPDM | PL | THE DOCKET HAS BEEN PLACED ON THE AGENDA OF THE OPEN MEETING SCHEDULE ON JANUARY 17, 2019 |
213 | 1/22/2019 | PUC OPDM | PL | PROPOSED ORDER AND COVER MEMO |
214 | 1/31/2019 | RAYBURN COUNTRY ELECTRIC COOPERATIVE INC | PL | RAYBURN'S CORRECTIONS AND EXCEPTION TO THE PROPOSED ORDER |
215 | 1/31/2019 | PUC LEGAL | PL | COMMISSION STAFF HAS NO PROPOSED CORRECTIONS OR EXCEPTIONS |
216 | 2/1/2019 | PUC OPDM | PL | CORRECTED PROPOSED ORDER AND COVER MEMO |
217 | 2/6/2019 | PUC OPDM | PL | OPEN MEETING FEBRUARY 7, 2019 DISCUSSION AND POSSIBLE ACTION WITH RESPECT TO CHAIRMAN WALKER'S MEMORANDUM |
218 | 2/8/2019 | PUC OPDM | PL | BRIEFING ORDER |
219 | 2/26/2019 | RAYBURN COUNTRY ELECTRIC COOPERATIVE INC | PL | RAYBURN'S RESPONSE TO FEBRUARY 8, 2019 BRIEFING ORDER |
220 | 2/26/2019 | LUMINANT ENERGY COMPANY LLC | PL | LUMINANT ENERGY COMPANY LLC'S COMMENTS IN RESPONSE TO THE REQUEST FOR BRIEFING |
221 | 2/26/2019 | ERCOT | MISC | BRIEF OF ERCOT IN RESPONSE TO COMMISSION'S BRIEFING ORDER |
222 | 3/12/2019 | PUC OPDM | PL | OPEN MEETING, MARCH 13, 2019 |
223 | 3/13/2019 | PUC OPDM | PL | ORDER |
224 | 3/13/2019 | PUC OPDM | PL | OUTGOING COMISSION-SIGNED ORDER MAIL LOG |