Filings for 23335
Case Style APPLICATION FOR SALE, TRANSFER AND MERGER OF ENTERGY CORPORATION AND FPL GROUP, INC.
149 filing(s).
Item | File Stamp | Party | Item Type | Filing Description |
---|---|---|---|---|
1 | 12/1/2000 | ENTERGY CORP | PL | APPLICATION FOR SALE, TRANSFER AND MERGER OF ENTERGY CORPORATION AND FPL GROUP, INC. |
2 | 12/1/2000 | OPC | PL | OFFICE OF PUC MOTION TO INTERVENE |
3 | 12/6/2000 | TIEC | PL | MOTION TO INTERVENE |
4 | 12/6/2000 | PUC POLICY DEVELOPMENT | PL | ORDER OF REFERRAL |
5 | 12/7/2000 | IBEW | PL | MOTION TO INTERVENE |
6 | 12/14/2000 | SAM RAYBURN G&T | PL | MOTION TO INTERVENE |
7 | 12/22/2000 | BRAZOS ELEC POWER COOP | PL | MOTION TO INTERVENE |
8 | 12/27/2000 | CORAL POWER, L.L.C. | PL | PETITION FOR LEAVE TO INTERVENE |
9 | 12/27/2000 | CALPINE CORPORATION | PL | PETITION FOR LEAVE TO INTERVENE |
10 | 12/27/2000 | DYNEGY INC. | PL | PETITION FOR LEAVE TO INTERVENE |
11 | 12/28/2000 | POWER CHOICE | PL | MOTION TO INTERVENE |
12 | 1/3/2001 | COMMISSION STAFF | PL | PROPOSED LIST OF ISSUES |
13 | 1/3/2001 | POWER CHOICE, INC | PL | PROPOSED ISSUES |
14 | 1/3/2001 | BRAZOS ELEC POWER COOP | PL | LIST OF ISSUES |
15 | 1/3/2001 | PUC REGULATORY AFFAIRS | RFI | STAFF 1ST RFI TO ENTERGY CORPORATION AND FPL GROUP, INC. QUESTION NOS. DJ-01 THROUGH DJ-09 |
16 | 1/3/2001 | DYNEGY INC., CALPINE CORP ET A | PL | ISSUE LIST OF INTERVENERS DYNEGY INC., CALPINE CORPORATION AND CORAL POWER, L.L.C. |
17 | 1/3/2001 | TEXAS RATEPAYERS | PL | TEXAS RATEPAYERS' ORGANIZATION TO SAVE ENERGY'S MOTION TO INTERVENE AND LIST OF ISSUES |
18 | 1/3/2001 | ENTERGY CORP AND FPL GROUP INC | PL | APPLICANTS PROPOSED LIST OF ISSUES |
19 | 1/4/2001 | Colonial Pipeline Company | PL | COLONIAL PIPELINE COMPANY'S MOTION TO INTERVENE |
20 | 1/4/2001 | COLONIAL PIPELINE COMPANY | PL | INITIAL LIST OF ISSUES |
21 | 1/8/2001 | PUC REGULATORY AFFAIRS | RFI | STAFF'S 2ND RFI TO ENTERGY CORPORATION AND FPL GROUP, INC. QUESTION NOS. DJ-10 THROUGH DJ-17 |
22 | 1/8/2001 | PUC REGULATORY AFFAIRS | PL | STAFF HEREBY WITHDRAWS REQUEST FOR INFORMATION DJ-09 IN STAFF'S 1ST RFI |
23 | 1/11/2001 | OCCIDENTAL CHEMICAL CORP | PL | MOTION TO INTERVENE |
24 | 1/12/2001 | SOAH | PL | ORDER NO. 1: NOTICE OF PREHEARING CONFERENCE AND GRANTING INTERVENTION |
25 | 1/12/2001 | COMMISSION STAFF | RFI | 3RD RFI TO ENTERGY CORPORATION AND FPL GROUP, INC. QUESTION NOS. TN-18 THROUGHT TN-34 |
26 | 1/16/2001 | PUC POLICY DEVELOPMENT | PL | ORDER REQUESTING BRIEFING ON THRESHOLD ISSUES |
27 | 1/17/2001 | OPUC | RFI | 1ST RFI TO ENTERGY CORPORATION, EGSI AND FPL GROUP, INC. |
28 | 1/17/2001 | BEAUMONT POWER & LIGHT CO | PL | MOTION TO INTERVENE |
29 | 1/22/2001 | PUC REGULATORY AFFAIRS | PL | STAFF'S COMMENTS ON NOTICE |
30 | 1/23/2001 | EGSI (ENTERGY GULF STATES) | RFI | Reply to Staff 3-31 |
31 | 1/23/2001 | EGSI (ENTERGY GULF STATES) | RFI | REPLY TO PUCT STAFF'S 1ST RFI |
32 | 1/24/2001 | EGSI (ENTERGY GULF STATES) | RFI | Reply of EGSI to Staff's 2nd RFI |
33 | 1/24/2001 | EGSI (ENTERGY GULF STATES) | RFI | Reply of EGSI to Staff 2nd Set RFI: Staff 2-DJ-12, 13, 15 & 16 |
34 | 1/24/2001 | CITY OF PORT NECHES | PL | MOTION TO INTERVENE |
35 | 1/24/2001 | CITY OF PORT NECHES | PL | BRIEF ON THRESHOLD ISSUES |
36 | 1/24/2001 | TIEC | PL | BRIEF ON THRESHOLD ISSUES |
37 | 1/24/2001 | Dynegy Inc., Calpine Corporati | BR | Brief on Threshold Issues of Interventors Dynegy, Inc., Calpine Corporation, Coral Power, LLC and Colonial Pipeline Company |
38 | 1/24/2001 | Entergy Corporation and FPL Gr | PL | Applicants' Brief on Threshold Issues |
39 | 1/24/2001 | SAM RAYBURN G AND T | PL | RESPONSE TO THE ORDER REQUESTING BRIEFING ON THRESHOLD ISSUES |
40 | 1/24/2001 | BRAZOS ELEC POWER COOP | BR | BRIEFING ON THRESHOLD ISSUES |
41 | 1/24/2001 | OPUC | PL | STATEMENT OF POSITION ON THRESHOLD ISSUES |
42 | 1/24/2001 | PUC REGULATORY AFFAIRS | PL | STAFF'S PROPOSED LIST OF ISSUES |
43 | 1/25/2001 | EGSI (ENTERGY GULF STATES) | RFI | Reply of EGSI to STAFF's 2nd Set |
44 | 1/25/2001 | COLONIAL PIPELINE | PL | NOTICE OF SUBSTITUTION OF COUNSEL |
45 | 1/26/2001 | EGSI (ENTERGY GULF STATES) | RFI | Reply of EGSI to Staff's 3rd Set |
46 | 1/26/2001 | EGSI (ENTERGY GULF STATES) | RFI | EGSI reply to Staff 3RD RFI |
47 | 1/26/2001 | SOAH | PL | ORDER NO. 2: RESCHEDULING PREHEARING CONFERENCE; REQUIRING NOTICE; ADOPTING PROTECTIVE ORDER; AND GRANTING INTERVENTION |
48 | 1/30/2001 | ENTERGY CORPORATION ET AL | PL | COMMENTS REGARDING ORDER NO. 2 |
49 | 1/31/2001 | EGSI (ENTERGY GULF STATES) | RFI | EGSI REPLY TO STAFF'S 2ND RFI QUESTION NO. 2-10 |
50 | 1/31/2001 | BEAUMONT POWER & LIGHT CO. | PL | OBJECTION TO APPLICANTS' REQUEST FOR EXPEDITED HEARING |
51 | 2/1/2001 | EGSI (ENTERGY GULF STATES) | RFI | REPLY TO STAFF'S 3RD RFI |
52 | 2/1/2001 | EGSI (ENTERGY GULF STATES) | RFI | EGSI Reply to Staff 3rd Set: Staff 3-19,33 |
53 | 2/2/2001 | PUC POLICY DEVELOPMENT | PL | DRAFT PRELIMINARY ORDER |
54 | 2/2/2001 | EGSI (ENTERGY GULF STATES) | RFI | EGSI reply to Staff 3rd Set: Staff 03-34 |
55 | 2/2/2001 | EGSI (ENTERGY GULF STATES) | PL | REPLY TO OBJECTION OF BEAUMONT POWER AND LIGHT COMPANY |
56 | 2/5/2001 | EGSI | RFI | Reply of EGSI to OPC 1st Set: OPC 1-3 |
57 | 2/7/2001 | EGSI | RFI | Reply of EGSI to OPC 1st Set RFI: OPC 1-1 & 4 |
58 | 2/8/2001 | EGSI | RFI | Reply of EGSI to OPC 1st Set RFI: OPC 1-3 Addendum 1 |
59 | 2/8/2001 | EGSI (ENTERGY GULF STATES) | RFI | REPLY TO PUCT OPC'S 1ST RFI |
60 | 2/8/2001 | PUC POLICY DEVELOPMENT | PL | CHAIRMAN WOOD'S CHANGES TO DRAFT PRELIMINARY ORDER |
61 | 2/9/2001 | EGSI (ENTERGY GULF STATES) | PL | PROPOSED PROCEDURAL SCHEDULE FOR DISCUSSION PURPOSES |
62 | 2/13/2001 | OPUC | RFI | 2ND RFI TO ENTERGY CORPORATION, ENTERGY GULF STATES, INC., AND FPL GROUP, INC. |
63 | 2/13/2001 | COMMISSION STAFF | RFI | 4TH RFI TO ENTERGY CORPORATION AND FPL |
64 | 2/13/2001 | ENTERGY | PL | PROCEDURAL SCHEDULE ATTACHED AND BEING FORWARDED ELECTRONICALLY .... |
65 | 2/16/2001 | PUC POLICY DEVELOPMENT | PL | PRELIMINARY ORDER |
66 | 2/20/2001 | CITIES | RFI | 1ST RFI TO EGS |
67 | 2/20/2001 | SOAH | PL | ORDER NO.3 MEMORIALIZING PREHEARING CONFERENCE, ESTABLISHING PREHEARING PROCEDURES AND SCHEDULES, AND NOTICE OF HEARING ON THE MERITS |
68 | 2/20/2001 | Colonial Pipeline | RFI | Colonial Pipeline Company's First Request for Information to Entergy Corporation, Entergy Gulf States, Inc., and FPL Group, Inc. Question Nos. CPC-1 through CPC-158 |
69 | 2/28/2001 | MR & MRS ARTHUR OWENS | PC | COMMENTS |
70 | 3/1/2001 | EGSI | RFI | Reply of EGSI to OPC 2nd Set RFI: OPC 2-1, 2, 3, 4, 5, 6, & 8 |
71 | 3/1/2001 | JOY BYROM | PC | PUBLIC COMMENTS |
72 | 3/2/2001 | Entergy Corporation and FPL Gr | PL | Applicants' Objections to Colonial Pipeline Company's First Request for Information |
73 | 3/2/2001 | GARY BERGQUIST | PC | PROTEST LETTER |
74 | 3/2/2001 | WESTVACO CORPORATION | PL | PETITION TO INTERVENE |
75 | 3/5/2001 | EGSI | RFI | Reply of EGSI to CPC's 1st Set |
76 | 3/5/2001 | EGSI | RFI | Reply of Entergy/FPL Group, Inc. to CPC 1st Set RFI: CPC 1-3, 4, 7 & 26 |
77 | 3/5/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RFI |
78 | 3/5/2001 | EGSI | RFI | EGSI reply to CPC'S 1ST RFI 1: 21,22,23,24, 31,33,39,40,52,78 |
79 | 3/5/2001 | EGSI | RFI | Reply of Entergy/FPL Group to CPN 1st SEt RFI: CPN 1-1, 2, 4, 15 & 16 |
80 | 3/5/2001 | EGSI | RFI | Reply of EGSI to OPC 2nd Set RFI: OPC 2-7 |
81 | 3/5/2001 | EGSI | RFI | Reply of Entergy/FPL Group, Inc. to CPN 1st Set RFI: CPN 1-5 & 6 |
82 | 3/6/2001 | EGSI ET AL | RFI | REPLY TO CPC'S 1ST RFI |
83 | 3/6/2001 | EGSI | RFI | EGSI REPLY TO CPC 1ST RFI (1:12,32,114,116,117) |
84 | 3/6/2001 | EGSI | RFI | Reply of Entergy/FPL Group, Inc. to Staff's 4th Set RFI: Staff 4-38, 40, 41 |
85 | 3/6/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RFI (1:89,141) |
86 | 3/6/2001 | EGSI ET AL | RFI | REPY TO CPN'S 1ST RFI |
87 | 3/6/2001 | PUC REGULATORY AFFAIRS | PL | SUPPLEMENTAL REQUESTS FOR INFORMATION REGARDING APPLICATION FOR SALE TRANSFER, AND MERGER OF ENTERGY CORPORATION AND FPL GROUP, INC. |
88 | 3/7/2001 | EGSI | RFI | Reply of Entergy/FPL Group,Inc to CPN 1st Set RFI: CPN 1-9, 10, 13, 14, 17, 18, 19, 22, 23, 24, 25, 26. |
89 | 3/7/2001 | EGSI | RFI | EGSI REPLY TO CPC 1ST SET |
90 | 3/8/2001 | EGSI | RFI | Reply of EGSI to CPC'S 1ST RFI QUESTION NOS. 113,149,154-158 |
91 | 3/8/2001 | EGSI | RFI | Reply of EGSI to CPC 1ST RFI QUESTION NO. 152 |
92 | 3/8/2001 | EGSI | RFI | Reply of Entergy/FPL Group to CPC 1st Set RFI: CPC 1-98 & 134 |
93 | 3/8/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RFI QUESTION NOS. 82-83, 101, 137 & 153 |
94 | 3/8/2001 | EGSI (ENTERGY GULF STATES) | RFI | RESPONSE TO COMMISSION'S STAFF 4TH RFI |
95 | 3/9/2001 | EGSI | RFI | Reply of Entergy/FPL Group, Inc. to STAFF 4th Set RFI: STAFF 4-36, 37 & 39 |
96 | 3/9/2001 | EGSI | RFI | Reply of Entergy/FPL Group, Inc. to CPC 1st Set RFI: CPC 1-138 & 140 |
97 | 3/9/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RFI |
98 | 3/9/2001 | EGSI | RFI | Reply of EGSI to CPN 1st Set: CPN 1-8 |
99 | 3/9/2001 | EGSI (ENTERGY GULF STATES) | RFI | REPLY TO STAFF'S 4TH RFI |
100 | 3/9/2001 | J. DOUGLAS BAILEY,L.I. PH.D. | PC | PROTEST LETTER |
101 | 3/9/2001 | COLONIAL PIPELINE COMPANY | PL | NOTICE OF AGREEMENT TO MODIFY DEADLINE FOR FILING MOTION TO COMPEL |
102 | 3/12/2001 | EGSI | RFI | EGSI REPLY TO CPC 1ST SET |
103 | 3/13/2001 | EGSI | RFI | REply of Entergy/FPL Group, Inc. to STAFF 4th Set RFI: STAFF 4-42 |
104 | 3/13/2001 | EGSI | RFI | Reply of EGSI to CPC 1st Set: CPC 1-64, 122, 128, 131 & 145 |
105 | 3/13/2001 | EGSI | RFI | REPLY TO CPC'S 1ST RFI (56, 91, 115, 132) |
106 | 3/13/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RFI (105, 107, 111) |
107 | 3/13/2001 | EGSI | RFI | REPLY TO CPC'S 1ST RFI QUESTION NOS. 85,87 & 88 |
108 | 3/13/2001 | EGSI | RFI | REPLY TO CPN'S 1ST RFI QUESTION NOS. 3,11,12,20,21 & 27 |
109 | 3/13/2001 | EGSI | RFI | REPLY TO CPC'S 1ST RFI QUESTION NOS. 29 & 81 |
110 | 3/13/2001 | EGSI | RFI | REPLY TO CPC'S 1ST RFI QUESTION NO. 146 |
111 | 3/13/2001 | EGSI | RFI | REPLY TO CPC'S 1ST RFI QUESTION NO. 120 & 147 |
112 | 3/13/2001 | EGSI | RFI | REPLY TO CPC'S 1ST RFI QUESTION NOS. 36,41,49,51,70 & 90 |
113 | 3/14/2001 | EGSI | RFI | REPLY TO CPC'S 1ST RFI QUESTION NOS. 38, 65, 73 & 75 |
114 | 3/14/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RFI |
115 | 3/14/2001 | EGSI | RFI | EGSI REPLY TO CPC 1ST RFI QUESTION NOS. 53, 62 & 94 |
116 | 3/14/2001 | EGSI | RFI | Reply of Entergy/FPL Group Inc. to STAFF 4th Set RFI: STAFF 4-42 Addendum 1 |
117 | 3/14/2001 | EGSI | RFI | EGSI REPLY TO CPS'S 1ST RFI QUESTION NO. 95 |
118 | 3/14/2001 | PUC LEGAL | PL | LETTER PROVIDING SPECIFIC INFORMATION ON THE TIME AND LOCATION OF EACH OF THE TECHNICAL CONFERENCES SCHEDULED IN THIS DOCKET |
119 | 3/14/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RFI QUESTION NO. 118 |
120 | 3/14/2001 | COLONIAL PIPELINE CO | PL | NOTICE OF AGREEMENT TO MODIFY DEADLINE FOR FILING MOTION TO COMPEL |
121 | 3/15/2001 | EGSI | RFI | REPLY TO CPC'S 1ST RFI QUESTION NO. 110 |
122 | 3/16/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RFI QUESTION NO. 25, 27 & 86 |
123 | 3/16/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RFI QUESTION NOS. 13, 14, 55, 63 & 124 |
124 | 3/16/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RFI QUESTIONS: 28, 30, 34, 35, 50, 57 |
125 | 3/16/2001 | EGSI | RFI | REPLY TO CPC'S 1ST RFI QUESTION NO. 80 7& 135 |
126 | 3/16/2001 | EGSI | RFI | REPLY TO CPC'S 1ST RFI QUESTION NOS. 92,93, 97, 100, 108 & 136 |
127 | 3/19/2001 | EGSI | RFI | EGSI REPLY TO CPC 1ST SET ( 1-OPD, 1- ORA-LEGAL) |
128 | 3/19/2001 | ATTORNEY GENERAL | PL | MOTION TO INTERVENE OF THE STATE OF TEXAS BY THE OAGIN ACCORDANCE WITH P.U.C. PROC. R. SUBST. R. 22.103 & 22.104. |
129 | 3/20/2001 | EGSI | RFI | Reply of Entergy/FPL Group, Inc. to CPC 1st Set RFI: CPC 1-96 |
130 | 3/21/2001 | EGSI | RFI | REPLY TO CPC'S 1ST RFI QUESTION NO. 72 |
131 | 3/21/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RFI QUESTION NO. 106 |
132 | 3/21/2001 | EGSI | RFI | REPLY TO CPC'S 1ST RFI QUESTION NO. 130 |
133 | 3/21/2001 | KENNEDY REPORTING | PL | TRANSCRIPT - PREHEARING CONFERENCE,TUES, FEBRUARY 13,2001 |
134 | 3/22/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RFI (1:151) |
135 | 3/22/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RFI (1:84,99, 112) |
136 | 3/22/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RFI (1: 150) |
137 | 3/26/2001 | EGSI | RFI | REPLY TO CPC'S 1ST RFI QUESTION NO. 119 |
138 | 3/26/2001 | EGSI | RFI | REPLY TO CPC'S 1ST RFI QUESTION NO. 133 |
139 | 3/27/2001 | EGSI | RFI | CORRECTED COPY TO OF ADDENDUM 1 TO CPC 1-26 |
140 | 4/2/2001 | EGSI | RFI | EGSI REPLY TO CPC'S 1ST RF I (25 ADDENDUM1, 115 ADDENDUM 1, 147 AND ADDENDUM 1) |
141 | 4/2/2001 | EGSI | RFI | Reply of Entergy/FPL Group, Inc to OPC 1st Set RFI: OPC 1-2 Addendum 1 |
142 | 4/2/2001 | SOAH | PL | ORDER NO. 4: GRANTING INTERVENTION TO WESTVACO AND THE STATE OF TEXAS |
143 | 4/2/2001 | ENTERGY | PL | NOTICE OF WITHDRAWAL OF APPLICATION REGARDING PROPOSED MERGER |
144 | 4/2/2001 | SAM RAYBURN G&T | PL | LETTER NOTIFYING THE COMMISSION OF THE NAME, ADDRESS AND TELEPHONE NUMBER OF SAM RAYBURN G&T'S AUTHORIZED REPRESENTATIVE. |
145 | 4/4/2001 | SOAH | PL | ORDER NO. 5 GRANTING WITHDRAWAL AND DISMISSING CASE |
146 | 4/6/2001 | PUC POLICY DEVELOPMENT | PL | ORDER NO. 6: ORDER OF DISMISSAL |
147 | 5/2/2001 | KENNEDY REPORTING | PL | TRANSCRIPT - TECHNICAL CONFERENCE 9:37 THURSDAY MARCH 29, 2001 PAGES 1 - 149 (AGENDA) |
148 | 6/20/2001 | BOLIVAR PENINSULA | PL | QUESTIONS OF ISSUE ON MERGER BETWEEN ENTERGY / FLORIDA POWER & LIGHT |
149 | 4/28/2009 | CENTRAL RECORDS | PL | FILE PURGED (4/09) |
Export to Excel |