Filings for 17922
Case Style PETITION OF WALLER CREEK COMMUNICATIONS, INC. FOR ARBITRATION WITH SOUTHWESTERN BELL TELEPHONE COMPANY
381 filing(s).
Item | File Stamp | Party | Item Type | Filing Description |
---|---|---|---|---|
1 | 9/2/1997 | WALLER CREEK COMMUNICATIONS, I | PL | PETITION OF WALLER CREEK COMMUNICATIONS, INC. FOR ARBITRATION WITH SOUTHWESTERN BELL TELEPHONE COMPANY |
2 | 9/3/1997 | WALLER CREEK COMMUNICATIONS, I | PL | INADVERTENTLY OMITTED EXHIBIT #19 TO THE PETITION |
3 | 9/29/1997 | SWB | PL | Response to Petition of SWBT |
4 | 10/1/1997 | SWB | PL | Proposed interconnection agreement with Waller Creek |
5 | 10/15/1997 | PUC POLICY DEVELOPMENT | PL | ORDER NO. 1 -- NOTICE OF JOINT PREHEARING CONFERENCE |
6 | 10/20/1997 | SWB | PL | Motion to Define Scope of Proceedings |
7 | 10/27/1997 | PUC POLICY DEVELOPMENT | PL | ORDER NO. 2 -- ESTABLISHING PROCEDURES AND NOTICE OF HEARING |
8 | 10/28/1997 | WALLER CREEK COMMUNICATIONS, I | BR | Brief on Threshold Issues |
9 | 10/28/1997 | WALLER CREEK COMMUNICATIONS, I | PL | Clarification of Procedural Schedule in Order No. 2 |
10 | 10/28/1997 | SWB | BR | Brief in Support of Motion to Dismiss |
11 | 10/28/1997 | TIME WARNER COMMUNICATIONS | BR | BRIEF ON THRESHOLD ISSUE |
12 | 10/29/1997 | WALLER CREEK COMMUNICATIONS, I | PL | Cover letter with attachments, including DPL |
13 | 10/30/1997 | WALLER CREEK COMMUNICATIONS, I | PL | REPLY TO MOTION TO DEFINE SCOPE |
14 | 11/4/1997 | PUC POLICY DEVELOPMENT | PL | SUBMISSION FORM-NOTICE OF OPEN MEETING |
15 | 11/4/1997 | WALLER CREEK COMMUNICATIONS, I | RFI | WCC's First Round of Discovery to SWBT |
16 | 11/5/1997 | WALLER CREEK COMMUNICATIONS, I | PL | Objections to SWBT's 1st RFIs |
17 | 11/5/1997 | KENNEDY REPORTING | PL | TRANSCRIPT-PHC,10:00AM TUE 10/21/97 |
18 | 11/6/1997 | SWB | RFI | First RFI to Waller Creek Communications, Inc. |
19 | 11/7/1997 | PUC POLICY DEVELOPMENT | PL | ORDER NO. 3 : ORDER ON MOTION TO DISMISS, MOTION TO DEFINE, CONSOLIDATION, AND THE NEED FOR AN EVIDENTIARY HEARING AND ORDER AMENDING THE PROCEDURAL SCHEDULE |
20 | 11/7/1997 | SWB | PL | SWBT's Objections to WCC's First Round of Discovery |
21 | 11/10/1997 | SWB | PL | LETTER TO WALLER CREEK COMMUNICATIONS RE : Response to Special Request |
22 | 11/10/1997 | WALLER CREEK COMMUNICATIONS, I | PL | OBJECTIONS TO SWBT'S 1ST RFI |
23 | 11/12/1997 | WALLER CREEK COMMUNICATIONS, I | RFI | Second Round of Discovery to Southwestern Bell Telephone Company |
24 | 11/12/1997 | SWB | RFI | Second RFI to Waller Creek Communications, Inc. |
25 | 11/13/1997 | SWB | TEST | DIRECT TESTIMONY OF Daniel L. Poole |
26 | 11/13/1997 | SWB | TEST | DIRECT TESTIMONY OF DENNIS B EIDSON |
27 | 11/13/1997 | SWB | TEST | Direct Testimony of W. Michael Grogan |
28 | 11/13/1997 | SWB | TEST | DIRECT TESTIMONY OF O.R. STANLEY |
29 | 11/13/1997 | WALLER CREEK COMMUNICATIONS, I | TEST | DIRECT TESTIMONY OF LOWELL FELDMAN |
30 | 11/13/1997 | WALLER CREEK COMMUNICATIONS, I | TEST | Direct Testimony of Dr. August H. Ankum on Behalf of Waller Creek Communications, Inc. |
31 | 11/13/1997 | WALLER CREEK COMMUNICATIONS, I | TEST | Testimony of Sarah J. Goodfriend on Behalf of Waller Creek Communications Incorporated |
32 | 11/13/1997 | WALLER CREEK COMMUNICATIONS, I | TEST | Pre-Filed Testimony of Joe M. Coffey |
33 | 11/13/1997 | SWB | PL | REDLINED VERSION OF WALLER CREEK PROPOSED CONTRACT LANGUAGE |
34 | 11/14/1997 | ACSEC | PL | STATEMENT OF POSITION AND PUBLIC COMMENT |
35 | 11/14/1997 | SWB | RFI | SWBT's Objections to WCC's Second Round of Discovery |
36 | 11/17/1997 | WALLER CREEK COMMUNICATIONS, I | RFI | Waller Creek Communications, Inc.'s Objections to Southwestern Bell Telephone Company's Second Request for Information |
37 | 11/19/1997 | WALLER CREEK COMMUNICATIONS, I | RFI | Responses to Southwestern Bell Telephone Company's 2nd Round of Discovery |
38 | 11/20/1997 | SWB | PL | SWBT's Motion to Strike |
39 | 11/21/1997 | SWB | PL | SWBT's Exhibit No. 12 |
40 | 11/24/1997 | SWB | PL | NOTICE OF SUBMISSION OF CONFIDENTIAL COST STUDIES |
41 | 11/25/1997 | PUC POLICY DEVELOPMENT | PL | ORDER NO. 4-ORDER REQUESTING BRIEFING ON MOTION TO STRIKE AND THE COLLACTION OF SIEMENS SWITCHING EQUIPMENT |
42 | 11/26/1997 | SWB | TEST | DIRECT TESTIMOY O. R. Stanley |
43 | 11/26/1997 | SWB | TEST | DIRECT TESTIMONY OF Jack R. Frith |
44 | 11/26/1997 | SWB | TEST | Direct Testimony of Dennis B. Eidson |
45 | 11/26/1997 | SWB | TEST | DIRECT TESTIMONY OF Daniel L. Poole |
46 | 11/26/1997 | SWB | TEST | Direct Testimony of Albert P. Halprin |
47 | 11/26/1997 | SWB | TEST | SWBT's Direct Testimony of Paul L. Cooper |
48 | 11/26/1997 | WALLER CREEK COMMUNICATIONS, I | TEST | DIRECT TESTIMONY OF LOWELL FELDMAN |
49 | 11/26/1997 | WALLER CREEK COMMUNICATIONS, I | TEST | DIRECT TESTIMONY OF AUGUST H. ANKUM |
50 | 12/1/1997 | WALLER CREEK COMMUNICATIONS, I | TEST | Revised Direct Testimony of Lowell Feldman |
51 | 12/3/1997 | WALLER CREEK COMMUNICATIONS, I | RFI | Waller Creek Communications, Inc. Third Round of Discovery to Southwestern Bell Telephone Company |
52 | 12/3/1997 | SWB | RFI | SWBT's Third RFI to Waller Creek Communications, Inc. |
53 | 12/4/1997 | TELEPORT COMM. GROUP | BR | Amicus Brief |
54 | 12/4/1997 | Brooks Fiber Communications of | PL | Comments |
55 | 12/4/1997 | AT&T COMMUNICATIONS SW | PL | Comments |
56 | 12/4/1997 | WALLER CREEK COMMUNICATIONS, I | RFI | Waller Creek Communications, Inc. Objection to Southwestern Bell Telephone Company's Third Request for Information to Waller Creek Communications, Inc. |
57 | 12/4/1997 | WALLER CREEK COMMUNICATIONS, I | PL | Waller Creek Communications, Inc. Motion to Correct the Transcript |
58 | 12/4/1997 | WALLER CREEK COMMUNICATIONS, I | PL | Letter to Thomas J. Horn from W. Scott McCollough re: request for copies of SWBT responses to Time Warner RFI's |
59 | 12/5/1997 | WORLDCOM, INC. | PL | COMMENTS |
60 | 12/5/1997 | SWB | TEST | Supplemental TESTIMONY OF DENNIS B EDISON |
61 | 12/5/1997 | WALLER CREEK COMMUNICATIONS, I | BR | Brief on Initial Issues |
62 | 12/5/1997 | KMC TELECOM,GST LIGHTWAVE & CO | PL | COMMENTS |
63 | 12/5/1997 | SWB | BR | Post-Hearing Brief |
64 | 12/5/1997 | SWB | PL | Joint Affidavit of O. R. Stanley and Daniel L. Poole |
65 | 12/8/1997 | SWB | PL | Objections to WCC's Third Round of Discovery |
66 | 12/9/1997 | MCI | PL | MOTION FOR LEAVE TO LATE FILE COMMENTS |
67 | 12/9/1997 | WALLER CREEK COMMUNICATIONS, I | PL | Waller Creek Communications Affidavit of Lowell Feldman in Response to SWBT's Joint Affidavit |
68 | 12/11/1997 | WALLER CREEK COMMUNICATIONS, I | RFI | Responses to SWBT's Third Request for Information |
69 | 12/11/1997 | SWB | PL | Motion to Strike Feldman Affidavit |
70 | 12/11/1997 | SWB | PL | Motion to Strike |
71 | 12/11/1997 | TIME WARNER COMMUNICATIONS | PL | MOTION TO STRIKE THE DIRECT TESTIMONY OF ALBERT P HALPRIN |
72 | 12/15/1997 | SWB | PL | Letter of Explanation and Correction to First Supplement Response to Time Warner's First Request for Information No. 1-36.b |
73 | 12/17/1997 | ACSEC | PL | AMENDED PUBLIC COMMENT AND STATEMENT OF POSITION |
74 | 12/18/1997 | WALLER CREEK COMMUNICATIONS, I | BR | Brief on Reciprocal Compensation |
75 | 12/18/1997 | SWB | BR | SWBT's Post Hearing Brief |
76 | 12/18/1997 | SWB | PL | LETTER TO THE COMMISSSION REGARDING 12/17/97 FILING |
77 | 12/19/1997 | ACSEC | PL | LETTER TO ARBITRATORS RE : CLARIFYING SUPPLEMENT TO AMENDED PUBLIC COMMENT AND STATEMENT OF POSITION |
78 | 12/19/1997 | ACSEC | PL | SECOND CLARIFYING SUPPLEMENT TO ITS AMENDED PUBLIC COMMENT |
79 | 12/19/1997 | WALLER CREEK COMMUNICATIONS, I | PL | Waller Creek Communications, Inc. Request for the Commission to Take Official Notice |
80 | 12/19/1997 | WALLER CREEK COMMUNICATIONS, I | PL | letter to Honorable Howard Siegel and the Honorable Meena Thomas from W. Scott McCollough re: 9-1-1 interim access |
81 | 12/19/1997 | WALLER CREEK COMMUNICATIONS, I | PL | Copy of a letter received today from SWBT concerning WCC's continuing request for terms and conditions of collocation and access to SWBT's facilities ... |
82 | 12/19/1997 | PUC POLICY DEVELOPMENT | PL | ORDER NO. 5: ORDER ADMITTING EVIDENCE |
83 | 12/22/1997 | WALLER CREEK COMMUNICATIONS, I | PL | Response to request for extension of deadline |
84 | 12/22/1997 | SWB | PL | Letter to Arbitrators re extension re the Award. |
85 | 12/23/1997 | OPD | PL | ORDER #6 : ORDER EXTENDING JURISDICTIONAL DEADLINE APPLICABLE TO THE ISP-RECIPROCAL COMPENSATION ISSUE |
86 | 12/23/1997 | KENNEDY REPORTING | PL | TRANSCRIPT-HOM,12/11/97 9:40AM THU |
87 | 12/23/1997 | KENNEDY REPORTING | PL | TRANSCRIPT-HOM,9:00AM THU 11/20/97 |
88 | 12/29/1997 | PUC POLICY DEVELOPMENT | PL | ARBRITRATION AWARD AND ATTACHMENT A - SPECIFIC LANGUAGE AWARD |
89 | 1/7/1998 | PUC POLICY DEVELOPMENT | PL | ARBITRATION AWARD RELATING TO ISP COMPENSATION ISSUES |
90 | 1/9/1998 | MCI | PL | REQUEST FOR REVIEW OF ARBITRATION AWARD |
91 | 1/9/1998 | TCG | BR | AMICUS BRIEF |
92 | 1/9/1998 | GOLDEN HARBOR OF TEXAS | PL | LETTER TO CHAIRMAN WOOD RE : ARBITRATION DECISIONS ISSUED JAN 7 1998 |
93 | 1/12/1998 | OPD | PL | NOTICE TO ALL PARTIES THAT THIS DOCKET HAS BEEN PLACED ON THE OPEN MEETING AGENDA FOR FEB 5, 1998 |
94 | 1/16/1998 | COMMISSIONER WALSH | PL | EMAILS AND LETTERS |
95 | 1/16/1998 | COMMISSIONER CURRAN | PL | LETTER FROM DAVID W GARRISON |
96 | 1/20/1998 | TAYLOR COMM. GROUP, INC. | PL | AFFIDAVIT ADDRESSING THE ARBITRATORS AWARD |
97 | 1/20/1998 | WALLER CREEK COMMUNICATIONS, I | BR | WCC's Brief on Commission's Review of Arbitrator's Award |
98 | 1/20/1998 | COSERV, L.L.C., KMC TELECOM, G | PL | Comments on Arbitration Award in Dockets 17922 and 18082 |
99 | 1/20/1998 | SPRINT COMMUNICATIONS CO | PL | Joint Motion of Sprint for Leave to File Comments; and Joint Comments of Sprint, United Telephone and Central Telephone of Texas |
100 | 1/20/1998 | SWB | BR | Brief in Response to Commission's Memorandum of January 12, 1998 filed in Docket No. 18082. |
101 | 1/20/1998 | TELEPORT COMM. GROUP | BR | Amicus Brief in Response to Awards on ISP Compensation |
102 | 1/21/1998 | SWB | BR | Attachment I to SWBT's Brief filed 01/20/98 |
103 | 1/21/1998 | CHAIRMAN WOOD,III | PL | EMAILS |
104 | 1/26/1998 | TELEPORT COMM. GROUP | PL | LETTER TO COMMISSIONERS RE : DECISION TO REVIEW THE AWARDS ON THE INTERNET SERVICE PROVIDER COMPENSATION |
105 | 1/26/1998 | PUC POLICY DEVELOPMENT | PL | PUC PUBLIC NOTICE OF INTERCONNECTION AGREEMENT |
106 | 1/26/1998 | WALLER CREEK COMMUNICATIONS, I | BR | Reply Brief on Commission Review of Arbitrator's Decisions |
107 | 1/27/1998 | INTERNET THE RIGHT WAY | PL | LETTER TO THE COMMISSION RE : THE ARBITRATION DECISION |
108 | 1/27/1998 | COMWERX | PL | LETTER TO THE COMMISSION RE : THE ARBITRATION DECISION |
109 | 1/29/1998 | CHAIRMAN PAT WOOD, III | PL | RESPONSE LETTER TO STATE REP. DISTRICT 45 |
110 | 1/29/1998 | CHAIRMAN PAT WOOD, III | PL | RESPONSE LETTER TO STATE REP. DISTRICT 121 |
111 | 1/29/1998 | WALLER CREEK COMMUNICATIONS, I | PL | letter to Commissioners re: Bell Atlantic filing with the FCC |
112 | 1/29/1998 | TELEPORT COMM. GROUP | PL | ORDER PUBLISHED BY MICHIGAN PUBLIC SERVICE |
113 | 1/30/1998 | TELEPORT COMM. GROUP | PL | INADVERTENTLY OMITTED PAGE 8 TO THE ORDER ISSUED BY MICHIGAN PUBLIC SERVICE COMMISSION |
114 | 1/30/1998 | CHAIRMAN WOOD,III | PC | RESPONSE TO LETTER FROM REPRESENTATIVE HORN |
115 | 1/30/1998 | CHAIRMAN PAT WOOD III | PC | RESPONSE LETTER TO STATE REPRESENTATIVE DISTRICT 124 |
116 | 2/3/1998 | OPD | PL | SUBMISSION FORM-PUBLIC NOTICE OF INTERCONNECTION (ACKNOWLEDGEMENT OF RECEIPT) |
117 | 2/4/1998 | America Online, Inc. | PL | Non-party comments submitted in lieu of filing a brief. |
118 | 2/4/1998 | SWB | PL | INFORMATIONAL copy of article from The New York Times dated February 3, 1998. |
119 | 2/4/1998 | COMMISSIONER WALSH | PL | EMAILS |
120 | 2/4/1998 | GTE | PL | LETTER TO COMMISSIONER WALSH RE : SUPPORT FOR DECISION RENDERED BY THE ARBITRATOR |
121 | 2/4/1998 | CHAIRMAN WOOD,III | PL | EMAILS |
122 | 2/6/1998 | CHAIRMAN WOOD,III | PL | EMAILS |
123 | 2/6/1998 | CHAIRMAN WOOD,III | PC | RESPONSE TO LETTER FROM REPRESENTATIVE HIGHTOWER |
124 | 2/10/1998 | PUC POLICY DEVELOPMENT | PL | ORDER NO. 7 - ORDER MODIFYING FILING OF INTERCONNECTION AGREEMENT AND REQUESTING BRIEFING ON RECIPROCAL COMPENSATION RATES |
125 | 2/18/1998 | COMMISSIONER WALSH | PL | EMAILS |
126 | 3/4/1998 | WALLER CREEK COMMUNICATIONS, I | PL | LETTER TO JUDGE SIEGEL RE : CLARIFICATION |
127 | 3/5/1998 | WALLER CREEK COMMUNICATIONS, I | BR | Brief in Response to Order No. 7 |
128 | 3/5/1998 | TCG DALLAS | BR | AMICUS BRIEF |
129 | 3/5/1998 | SWB | BR | SWBT's Brief in Response to Questions Raised by the Arbitrator |
130 | 3/6/1998 | SWB | BR | Brief in Response to Questions Raised by the Arbitrator (originally filed 03/05/98); includes Attachment. |
131 | 3/12/1998 | WALLER CREEK COMMUNICATIONS, I | BR | REPLY BRIEF TO ORDER NO. 7 |
132 | 3/12/1998 | SWB | BR | Reply Brief in Response to Questions Raised by the Arbitrator |
133 | 3/18/1998 | Waller Creek Communications, I | PL | Request for extension of time to submit agreement |
134 | 3/23/1998 | SWB | PL | confidential cost studies |
135 | 3/23/1998 | Waller Creek Communications, I | PL | Motion to Approve Interconnection Agreement with Supporting Affidavit and Request for Clarification DPL |
136 | 3/23/1998 | WALLER CREEK COMMUNICATIONS, I | PL | INTERCONNECTION AND AGREEMENT WITH SWBT |
137 | 3/26/1998 | AT&T COMMUNICATIONS SW | PL | Comments |
138 | 3/26/1998 | OPUC | PL | COMMENTS |
139 | 3/30/1998 | MCI | PL | LETTER TO COMMISSIONERS RE : COMMENTS ON WALLER CREEK'S PROPOSED INTERCONNECTION AGREEMENT APPENDIX UNE DARK FIBER |
140 | 3/31/1998 | SWB | PL | Comments of SWBT |
141 | 4/6/1998 | SWB | PL | SWBT's Affidavit of O. R. Stanley |
142 | 4/13/1998 | SWB | PL | CATEGORY ONE ISSUES MATRIX |
143 | 4/14/1998 | SWB | PL | SUPPLEMENTAL AFFIDAVIT OF O.R. STANLEY |
144 | 4/14/1998 | WALLER CREEK COMMUNICATIONS, I | PL | JOINT DECISION POINT LIST FOR BUCKETS TWO,THREE & FOUR |
145 | 4/14/1998 | SWB | BR | REPLY BRIEF |
146 | 4/15/1998 | PUC POLICY DEVELOPMENT | PL | NOTICE TO ALL PARTIES OF RECORD THAT THIS DOCKET HAS BEEN PLACED ON THE AGENDA OF THE APRIL 21, 98 OPEN MEETING. |
147 | 4/15/1998 | WALLER CREEK COMMUNICATIONS, I | BR | BRIEF IN SUPPORT OF PROPOSED INTERCONNECTION AGREEMENT |
148 | 4/15/1998 | WALLER CREEK COMMUNICATIONS, I | PL | INADVERTENTLY OMITTED DIAGRAM |
149 | 4/17/1998 | PUC POLICY DEVELOPMENT | PL | ARBITRATOR'S COMMENTS |
150 | 4/20/1998 | Waller Creek Communications, I | PL | Request for Clarification of Arbitrators' Recommendation |
151 | 4/21/1998 | SWB | PL | Letter to Arbitrators |
152 | 4/22/1998 | PUC POLICY DEVELOPMENT | PL | RECOMMENDATION SUPPLEMENT |
153 | 4/28/1998 | PUC POLICY DEVELOPMENT | PL | ORDER APPROVING INTERCONNECTION AGREEMENT |
154 | 5/18/1998 | SWB | PL | Motion for Rehearing |
155 | 6/2/1998 | Waller Creek Communications, I | PL | Interconnection agreement between SWB and Waller Creek |
156 | 6/10/1998 | SWB | PL | RESPONSE TO THE PROPOSED INTERCONNECTION AGREEMENT FILED BY WALLER CREEK |
157 | 6/18/1998 | PUC POLICY DEVELOPMENT | PL | LETTER TO ALL PARTIES RE : THIS DOCKET HAS BEEN PLACED ON THE 6/24/98 OPEN MEETING AGENDA |
158 | 6/19/1998 | PUC POLICY DEVELOPMENT | PL | MEMO TO COMMISSIONERS RE THREE CLARIFICATION ISSUES |
159 | 6/25/1998 | Waller Creek Communications, I | PL | Letter transmitting conforming contract pages and discussion of requested order |
160 | 6/29/1998 | PUC POLICY DEVELOPMENT | PL | ORDER DELEGATING AUTHORITY TO ARBITRATORS TO IMPLEMENT INTERCONNECTION AGREEMENT |
161 | 10/9/1998 | SWB | PL | LETTER TO WALLER CREEK RE : WCC LATEST CONFIGURATION AND DOWN PAYMENT FOR INSTALLATION |
162 | 10/9/1998 | WALLER CREEK COMMUNICATIONS, I | PL | LETTER TO MR SIEGEL (OPD) RE : 10/9/98 LETTER FILED BY SWB |
163 | 10/13/1998 | WALLER CREEK COMMUNICATIONS, I | PL | LETTER TO MR SIEGEL (OPD) RE : RESPONSE TO SWBT'S 10/9/98 FILING |
164 | 10/13/1998 | SWB | PL | LETTER TO MR SIEGEL (OPD) RE : A MEETING IN CONNECTION WITH WALLER CREEK COMMUNICATIONS INTERCONNECTION AGREEMENT |
165 | 10/13/1998 | Waller Creek Communications, I | PL | Response to SWBT Request for Clarification |
166 | 10/19/1998 | WALLER CREEK COMMUNICATIONS, I | PL | INEVERTENTLY OMITTED PAGES FROM FILING ON OCT. 9, 1998 |
167 | 10/20/1998 | SWB | PL | LETTER TO JUDGE SIEGEL (OPD) RE : INTERVENTION BY THE ARBITRATOR TO ADDRESS ISSUES THAT HAVE ARISEN BETWEEN THE PARTIES DURING IMPLEMENTATION |
168 | 10/26/1998 | Waller Creek Communications, I | PL | Letter to Patrick Halback from Lowell Feldman re: Payment due by WCC under the interconnection agreement |
169 | 11/13/1998 | KENNEDY | PL | TRANSCRIPT-HOM,WED,10/21/98 |
170 | 11/20/1998 | Waller Creek Communications, I | PL | Letter to Arbitrators |
171 | 11/25/1998 | WALLER CREEK COMMUNICATIONS, I | PL | LETTER TO ARBITRATORS CONTAINING SUMMARY OF DARK FIBER PROVISIONING PROCESSES |
172 | 12/7/1998 | SWB | PL | LETTER TO ARBITRATOR SIEGEL REGARDING DEC. 9, 1998 CONFERENCE CALL |
173 | 12/7/1998 | Waller Creek Communications, I | PL | Letter to Howard Siegel from W. Scott McCollough dated December 7, 1998 |
174 | 12/8/1998 | Waller Creek Communications, I | PL | Letter to Howard Siegel from W. Scott McCollough dated December 8, 1998 |
175 | 12/8/1998 | SWB | PL | LETTER TO ARBITRATOR'S RE : ALLEGED VIOLATIONS OF THE FILING DEADLINES AND GAMING THE PROCEDURES FOR IMPLEMENTATION MEETING |
176 | 12/16/1998 | SWB | PL | AFFIDAVIT OF DANIEL L POOLE |
177 | 12/17/1998 | SWB | PL | SIGNATURE PAGE OF AFFIDAVIT FILED DEC. 16, 1998 |
178 | 12/18/1998 | Waller Creek Communications, I | PL | LETTER TO SWB REGARDING DAN POOLE'S AFFIDAVIT RECEIVED WEDNESDAY AND LETTER CONCERNING FIBER IDENTIFICATION RECEIVED ON THURSDAY |
179 | 12/18/1998 | WALLER CREEK COMMUNICATIONS, I | PL | LETTER TO THE ARBITRATORS REGARDING SWB'S REFUSAL TO ABIDE BY THE TERMS OF THE INTERCONNECTION AGREEMENT |
180 | 12/21/1998 | SWB | PL | LETTER TO SIEGEL & THOMAS RE : THE BASIS FOR WCC PETITION FOR EXPEDITED BASIS |
181 | 12/21/1998 | Waller Creek Communications, I | PL | Letter transmitting missing attachment |
182 | 12/28/1998 | KENNEDY | PL | TRANSCRIPT-1ST TELEPHONE CONFERENCE, WED 12/9/98 |
183 | 12/21/1998 | WALLER CREEK COMMUNICATIONS, I | PL | EXECUTED VERIFICATION OF LOWELL FELDMAN |
184 | 1/7/1999 | SWB | PL | LETTER TO ARBITRATORS RE: SWB'S RECEIPT OF A BILL FOR LIQUIDATED DAMAGES PURPORTING TO CHARGE SWBT APPROXIMATELY $2.3 MILLION ... |
185 | 1/7/1999 | SWB | PL | LETTER TO ARBITRATORS RE: SWB'S RECEIPT OF THE DPL FILED BY WALLER CREEK YESTERDAY AFTERNOON |
186 | 1/7/1999 | Waller Creek Communications, I | PL | Legal Issues DPL |
187 | 1/7/1999 | Waller Creek Communications, I | PL | Specific Language DPL |
188 | 1/8/1999 | SWB | BR | brief on legal issues |
189 | 1/8/1999 | SWB | PL | Supplemental Affidavit of Daniel L. Poole |
190 | 1/8/1999 | SWB | PL | LETTER TO THE ARBITRATORS RE: THE LETTER FILED BY WALLER CREEK COMMUNICATIONS YESTERDAY, WHICH SUGGESTED THAT SWB SHOULD PROCEED TO PAY LIQUIDATED DAMAGE AMOUNTS INTO ESCROW PENDING A DETERMINATION ... |
191 | 1/11/1999 | Waller Creek Communications, I | BR | Brief on Legal Issues |
192 | 1/11/1999 | Waller Creek Communications, I | PL | Filing Documents Discussed in Phone Conference |
193 | 1/11/1999 | PUC POLICY DEVELOPMENT | PL | ORDER #1 : INTERIM ORDER REGARDING INTERIM REQUIREMENTS ON SWBT RELATING TO THE PROVISION AND INSTALLATION OF CROSS-CONNECTS |
194 | 1/11/1999 | KENNEDY REPORTING | PL | POST/IMPLEMENTATION HEARING MON. DEC 21, 1998 |
195 | 1/11/1999 | WALLER CREEK COMMUNICATIONS, I | PL | LETTER TO ARBITRATORS RE : SWBT'S DPL ANTICIPATED FILING |
196 | 1/12/1999 | SWB | PL | Letter to Mr. Siegel AND JUDGE THOMAS RE : LANGUAGE TO RESPOND TO THE ADDITIONAL ISSUES AND LANGUAGE WCC INCLUDED IN THE FINAL DPL |
197 | 1/13/1999 | SWB | PL | LETTER RE : STATUS REPORTS |
198 | 1/13/1999 | Waller Creek Communications, I | PRJ | January 13, 1999 Status Report |
199 | 1/13/1999 | Waller Creek Communications, I | PL | Comments on SWBT DPL |
200 | 1/15/1999 | Waller Creek Communications, I | PL | January 15, 1999 Status Report |
201 | 1/15/1999 | SWB | PL | STATUS REPORT #2 |
202 | 1/20/1999 | SWB | PL | 3RD Status Report |
203 | 1/20/1999 | WALLER CREEK COMMUNICATIONS, I | PL | JAN 20, 1999 STATUS REPORT |
204 | 1/21/1999 | PUC POLICY DEVELOPMENT | PL | ORDER #9 : ORDER ON THRESHOLD ISSUES AND ORDER REQUIRING PARTIES TO REVIEW DECISION POINT LIST |
205 | 1/22/1999 | SWB | PL | 4th Status Report |
206 | 1/22/1999 | WALLER CREEK COMMUNICATIONS, I | PL | STATUS REPORT |
207 | 1/26/1999 | KENNEDY | PL | TRANSCRIPT - TELEPHONE CONFERENCE JAN. 8, 1999 |
208 | 1/26/1999 | MCI | PL | LETTER TO THE COMMISSIONERS REGARDING THE ARBITRATOR'S DECISION |
209 | 1/26/1999 | OPUC | PL | COMMENTS |
210 | 1/26/1999 | SWB | PL | STATUS REPORT NO. 5 |
211 | 1/26/1999 | WALLER CREEK COMMUNICATIONS, I | PL | APPEAL OF ORDER 9/2 |
212 | 1/27/1999 | WALLER CREEK COMMUNICATIONS, I | PL | STATUS REPORT |
213 | 1/28/1999 | WALLER CREEK COMMUNICATIONS, I | PL | STATUS REPORT #6 |
214 | 1/29/1999 | SWB | PL | Letter to Arbitrators RE : INSTRUCTIONS TO INSTALL WCC'S EQUIPMENT |
215 | 1/29/1999 | PUC POLICY DEVELOPMENT | PL | LETTER TO ALL PARTIES RE : THIS DKT HAS BEEN PLACED ON THE 2/4/99 AGENDA, THE COMMISSIONERS WILL CONSIDER THE APPEAL OF ORDER #9 & 2 |
216 | 1/29/1999 | CLEC Coalition | PL | Comments of CLEC Coalition in Support of Waller Creek Communications Appeal of Order No. 9 |
217 | 1/29/1999 | TEXALTEL | PL | LETTER TO COMMISSIONERS RE : REQUEST TO REVERSE THE ARBITRATORS DECISION |
218 | 1/29/1999 | SWB | BR | REPLY BRIEF |
219 | 2/1/1999 | INTERMEDIA COMMUNICATIONS ET A | PL | CLARIFICATION OF THE APPEAL OF ORDER #9/2 |
220 | 2/1/1999 | WALLER CREEK COMMUNICATIONS, I | PL | WCC Letter to Commission re SWBT Reply |
221 | 2/2/1999 | SWB | PL | REPLY COMMENTS REGARDING THE AWARD OF 1/4/99 BY INTERESTED PARTIES |
222 | 2/4/1999 | PUC POLICY DEVELOPMENT | PL | MEMO TO COMMISSIONERS REGARDING QUESTIONS TO BE BRIEFED |
223 | 2/5/1999 | PUC POLICY DEVELOPMENT | PL | ORDER REQUESTING BRIEFING |
224 | 2/9/1999 | PUC POLICY DEVELOPMENT | PL | ORDER REQUESTING BRIEFING |
225 | 2/9/1999 | WALLER CREEK COMMUNICATIONS, I | PL | JOINT MOTION FOR ABATEMENT OF REQUIREMENT TO FILE REVISED DPLS |
226 | 2/9/1999 | PUC POLICY DEVELOPMENT | PL | ORDER#10 : AGREED ORDER ABATING REQUIREMENT TO FILE REVISED DPLS |
227 | 2/10/1999 | SWB | PL | RESPONSE TO COMMISSION QUESTIONS REGARDING BYPASS OF INCUMBENT LEC'S ACCESS SERVICES |
228 | 2/10/1999 | GTE | BR | INITIAL BRIEF |
229 | 2/10/1999 | SPRINT COMMUNICATIONS CO | BR | BRIEF |
230 | 2/10/1999 | TEXALTEL | PL | Response of TEXALTEL to Order Requesting Briefing |
231 | 2/10/1999 | WALLER CREEK COMMUNICATIONS, I | BR | BRIEF IN RESPONSE TO ORDER REQUESTING BRIEFING RELATED TO APPEAL OF ORDER #9 & 2 |
232 | 2/10/1999 | MCI WORLDOM | PL | RESPONSE TO THE ORDER REQUESTING BRIEFING |
233 | 2/10/1999 | AT&T COMMUNICATIONS SW | PL | RESPONSE TO BRIEFING QUESTIONS |
234 | 2/10/1999 | INTERMEDIA COMMUNICATIONS INC. | PL | LETTER TO COMMISSIONERS RE : UNABLE TO FILE BRIEFS |
235 | 2/11/1999 | CLEC COALITION | BR | BRIEF IN RESPONSE TO ORDER REQUESTING BRIEFING |
236 | 2/12/1999 | PUC POLICY DEVELOPMENT | PL | LETTER TO ALL PARTIES RE : THE COMMISSIONERS WILL CONSIDER THE APPEAL OF ORDER #9 & 2 AT THE 2/18/99 OPEN MEETING |
237 | 2/12/1999 | WESTEL COMMUNICATION SYS | PL | LETTER TO COMMISSIONERS RE : CONCURRENCE WITH CLEC'S COALITION'S BRIEF |
238 | 2/16/1999 | WALLER CREEK COMMUNICATIONS, I | PL | REPLY BRIEF REGARDING QUESTIONS RELATED TO APPEAL OF ORDERS #9 2 |
239 | 2/16/1999 | SWB | PL | RESPONSE TO COMMISSION'S QUESTIONS REGARDING BYPASS OF ILEC'S ACCESS SERVICES |
240 | 2/16/1999 | GTE | BR | REPLY BRIEF |
241 | 2/16/1999 | TSTCI | PL | REPLY TO PARTIES RESPONSES TO BRIEFING QUESTIONS |
242 | 2/16/1999 | MCI | PL | REPLY TO SWB'S AND GTE'S RESPONSES TO THE ORDER REQUESTING BRIEFING |
243 | 2/19/1999 | PUC POLICY DEVELOPMENT | PL | ORDER ADDRESSING PROCEDURES FOR HEARING ON THRESHOLD ISSUE NO. 1 |
244 | 2/24/1999 | SWB | TEST | JOINT DIRECT TESTIMONY OF PAUL L COOPER, JAN BRAINARD, MICHAEL VAN WEELDEN AND ALAN SAMSON |
245 | 2/24/1999 | Waller Creek Communications, I | TEST | Testimony of Gary Nekula, Lowell Feldman, and Bill Magness on Behalf of Waller Creek Communications, Inc. |
246 | 3/1/1999 | Waller Creek Communications, I | PL | Issues List |
247 | 3/1/1999 | Waller Creek Communications, I | TEST | Rebuttal Testimony |
248 | 3/1/1999 | PUC POLICY DEVELOPMENT | PL | ORDER ON APPEAL OF ORDER NOS. 9 AND 2 |
249 | 3/1/1999 | SWB | TEST | JOINT REBUTTAL TESTIMONY OF PAUL L. COOPER, JAN BRAINARD, MICHAEL VAN WEELDEN, ALLAN SAMSON, AND REBECCA SPARKS |
250 | 3/3/1999 | Waller Creek Communications, I | PL | Letter Transmitting DS3 Local Loop Documentation |
251 | 3/3/1999 | Waller Creek Communications, I | PL | Letter regarding stipulation and uncontested factual claims |
252 | 3/4/1999 | PUC POLICY DEVELOPMENT | PL | LETTER TO ALL PARTIES RE : THIS DOCKET HAS BEEN PLACED ON THE 3/11/99 OPEN MEETING. THE COMMISSIONERS WILL CONSIDER THE APPEAL OF ORDERS #9 & 12 |
253 | 3/5/1999 | SWB | PL | LETTER TO JUDGES SIEGEL & THOMAS RE : TESTIMONIES THAT SWB WILL NOT CONTROVERT |
254 | 3/8/1999 | SWB | PL | LETTER TO ARBITRATORS RE : SCHEDULING FOR FILING JOINT DPL AND HEARING ON IMPLEMENTATION |
255 | 3/8/1999 | SWB | PL | Implementation Issues - DPL |
256 | 3/8/1999 | Waller Creek Communications, I | PL | WCC's Implementation DPL |
257 | 3/10/1999 | PUC POLICY DEVELOPMENT | PL | NOTICE OF CHANGE IN OPEN MEETING DATE AT WHICH THE APPEAL OF #9 & 2 WILL BE CONSIDERED |
258 | 3/12/1999 | SWB | PL | MOTION FOR CONTINUANCE |
259 | 3/12/1999 | Waller Creek Communications, I | PL | Final Closing Statement in Appeal of Order Nos 9 and 2 |
260 | 3/12/1999 | SWB | PL | LETTER TO COMMISSIONERS RE : TRANSPORT ONLY WHOLESALE SERVICES |
261 | 3/15/1999 | SWB | PL | Joint DLP - Implementation Issues |
262 | 3/15/1999 | PUC POLICY DEVELOPMENT | PL | ORDER #11 : ORDER GRANTING MOTION FOR CONTINUANCE |
263 | 3/18/1999 | PUC POLICY DEVELOPMENT | PL | NOTIFICATION TO ALL PARTIES THAT THE COMMISSIONERS WILL CONSIDER THE APPEAL OF ORDERS NO. 9 & 2 AT THE 03/25/99 OPEN MEETING |
264 | 3/18/1999 | SWB | PL | CORRECTED JOINT DPL |
265 | 3/22/1999 | SWB | PL | CORRECTED DPL |
266 | 3/22/1999 | SWB | TEST | DIRECT TESTIMONY OF LEONARD D ELLIS |
267 | 3/22/1999 | SWB | TEST | DIRECT TESTIMONY OF V ALLAN SAMSON |
268 | 3/22/1999 | SWB | TEST | DIRECT TESTIMONY OF DANIEL L POOLE |
269 | 3/22/1999 | SWB | TEST | DIRECT TESTIMONY OF JAMES S HEARST |
270 | 3/22/1999 | SWB | TEST | DIRECT TESTIMONY OF DON PALMER |
271 | 3/22/1999 | SWB | TEST | DIRECT TESTIMONY OF JAN BRAINARD |
272 | 3/22/1999 | WALLER CREEK COMMUNICATIONS, I | TEST | Joint Testimony OF FELDMAN, NEKULA AND MAGNESS |
273 | 3/24/1999 | PUC POLICY DEVELOPMENT | PL | ORDER #12 : ORDER GRANTING MOTION FOR CONTINUANCE |
274 | 3/26/1999 | SWB | PL | LETTER TO SIEGEL & THOMAS RE : THE HEARING SCHEDULE |
275 | 3/29/1999 | PUC POLICY DEVELOPMENT | PL | ORDER #13 : ORDER GRANTING MOTION FOR CONTINUANCE |
276 | 4/5/1999 | KENNEDY REPORTING | PL | TRANSCRIPT-HOM,TUE 3/9/99 VOL 1 - Pages 1 - 380 |
277 | 4/5/1999 | KENNEDY REPORTING | PL | TRANSCRIPT-TELEPHONE CONFERENCE, FRI 3/12/99 |
278 | 4/7/1999 | SWB | PL | LETTER TO ARBITRATORS SIEGEL & THOMAS RE : PRICING OF DS-3 LOOP |
279 | 4/8/1999 | SWB | PL | OBJECTIONS TO DISCOVERY REQUESTS |
280 | 4/8/1999 | Waller Creek Communications, I | PL | Reply to SWBT "Motion to Strike" Cost Study |
281 | 4/8/1999 | WALLER CREEK COMMUNICATIONS, I | PL | Letter to SWBT re Request for Documents |
282 | 4/9/1999 | SWB | PL | LETTER TO SIEGEL & THOMAS RE : DS-3 MATTERS |
283 | 4/20/1999 | PUC POLICY DEVELOPMENT | PL | ORDER #14 : ORDER GRANTING MOTION FOR EXTENSION OF DEADLINES |
284 | 4/22/1999 | WALLER CREEK COMMUNICATIONS, I | BR | BRIEF ON IMPLEMENTATION ISSUES |
285 | 4/22/1999 | SWB | BR | INITIAL BRIEF |
286 | 4/23/1999 | PUC POLICY DEVELOPMENT | PL | SECOND ORDER ON APPEAL OF ORDER NOS. 9 AND 2 |
287 | 4/23/1999 | WALLER CREEK COMMUNICATIONS, I | PL | LETTER TO SIEGEL & THOMAS RE : THE ABSENCE OF ITEMS SWB AGREED TO PROVIDE |
288 | 4/23/1999 | SWB | PL | INFORMATION SWB AGREED TO PROVIDE TO WALLER CREEK DURING THE HEARING |
289 | 4/28/1999 | Waller Creek Communications, I | BR | Reply Brief |
290 | 4/28/1999 | SWB | BR | REPLY BRIEF |
291 | 4/30/1999 | KENNEDY REPORTING | PL | TRANSCRIPT-HOM,MON 4/12/99 VOL 3 - Pasges 657 to 1015 |
292 | 4/30/1999 | KENNEDY REPORTING | PL | TRANSCRIPT-HOM,TUE, 4/13/99 VOL 4 - Pages 1016 to 1513 |
293 | 4/30/1999 | KENNEDY REPORTING | PL | TRANSCRIPT-HOM,FRI 4/9/99 VOL 2 - Pages 381 to 656 |
294 | 5/4/1999 | WALLER CREEK COMMUNICATIONS, I | PL | LETTER TO ARBITRATORS ON RECENT EVENTS, WITH SUPPORTING AFFIDAVIT |
295 | 5/6/1999 | SWB | PL | LETTER TO ARBITRATORS RE : WALLER CREEK'S CONDUCT IN FILING A LETTER WITHOUT ATTEMPTING TO RESOLVE THE ISSUES |
296 | 5/12/1999 | SWB | PL | LETTER TO ARBITRATORS RE : COPY OF MR TOWNES' 5/12/99 LETTER IN RESPONSE TO WCC'S 5/4/99 LETTER |
297 | 5/13/1999 | WALLER CREEK COMMUNICATIONS, I | PL | MOTION FOR ORDER NUNC PRO TUNC OF 2ND ORDER ON APPEAL |
298 | 5/13/1999 | PUC POLICY DEVELOPMENT | PL | MOTION FOR RECONSIDERATION AND CLARIFICATION |
299 | 5/18/1999 | SWB | PL | LETTER TO COMMISSIONERS RE : RESPONSE TO WALLER CREEK'S MOTION FOR ORDER NUNC PRO TUNC OF 2ND ORDER ON APPEAL OF ORDERS #8 & 9 IN ORDER TO CLARIFY THAT SWB DOES NOT OPPOSE WCC'S MOTION |
300 | 5/24/1999 | Waller Creek Communications, I | PL | Reply to SWBT Motion for Reconsideration and Clarification |
301 | 5/26/1999 | PUC POLICY DEVELOPMENT | PL | LETTER TO ALL PARTIES RE : THE COMMISSIONERS HAVE VOTED NOT TO CONSIDER SWB'S MOTION FOR RECONSIDERATION & CLARIFICATION & HAVE VOTED TO CONSIDER WALLER CREEK'S MOTION FOR ORDER NUNC PRO TUNC AT THE 6/3/99 MEETING |
302 | 5/27/1999 | PUC POLICY DEVELOPMENT | PL | LETTER TO ALL PARTIES RE : THE COMMISSIONERS HAVE VOTED TO CONSIDER SWB'S MOTION FOR RECONSIDERATION AND CLARIFICATION AND THE COMMISSIONERS HAVE VOTED TO CONSIDER WALLER CREEK'S MOTION FOR NUNC PRO TUNC AT THE 6/3/99 OP |
303 | 6/8/1999 | PUC POLICY DEVELOPMENT | PL | ARBITRATION AWARD ON POST INTERCONNECTION DISPUTES |
304 | 6/10/1999 | PUC POLICY DEVELOPMENT | PL | ORDER ON RECONSIDERATION OF SECOND ORDER ON APPEAL NOS. 9 AND 2 |
305 | 6/10/1999 | WALLER CREEK COMMUNICATIONS, I | PL | REQUEST THAT COMMISSIONERS PLACE ARBITRATORS' DECISION ON AGENDA FOR NEXT AVAILIBLE OPEN MEETING |
306 | 6/11/1999 | PUC POLICY DEVELOPMENT | PL | LETTER TO ALL PARTIES RE : THE COMMISSIONERS HAVE VOTED TO CONSIDER THE ARBITRATION AWARD AT THE 7/1/99 OPEN MEETING |
307 | 6/11/1999 | SWB | PL | LETTER TO COMMISSIONERS RE : WALLER CREEK'S REQUEST THAT THE COMMISSION PLACE THE ARBITRATION AWARD ON THE NEXT AVAILABLE AGENDA |
308 | 6/16/1999 | SWB | PL | Unopposed Motion for Order Nunc Pro Tunc |
309 | 6/18/1999 | PUC POLICY DEVELOPMENT | PL | ORDER DIRECTING BRIEFING |
310 | 6/18/1999 | WALLER CREEK COMMUNICATIONS, I | PL | WCC'sResponse to PUC's Order Directing Briefing and Order Requesting Clarifications |
311 | 6/18/1999 | PUC POLICY DEVELOPMENT | PL | ORDER REQUESTING CLARIFICATIONS |
312 | 6/22/1999 | WALLER CREEK COMMUNICATIONS, I | PL | WWC'S RESPONSE TO ORDER REQUESTING CLARIFICATION |
313 | 6/22/1999 | SWB | PL | Southwestern Bell Telephone Company's Response to Order Requesting Clarification |
314 | 6/22/1999 | PUC POLICY DEVELOPMENT | PL | REVISED ARBITRATION AWARD IN RESPONSE TO MOTION FOR ORDER NUNC PRO TUNC ON POST INTERCONNECTION DISPUTES |
315 | 6/22/1999 | PUC POLICY DEVELOPMENT | PL | RESPONSE TO ORDER REQUESTING CLARIFICATION |
316 | 7/8/1999 | Waller Creek Communications, I | PL | Request for specific text in Final Order |
317 | 7/15/1999 | SWB | PL | Joint application for approval of an amendment to the interconnection agreement between Waller Creek Communications, Inc. and SWB, which was executed on 06/15/99 and 06/24/99 respectively |
318 | 7/22/1999 | WALLER CREEK COMMUNICATIONS, I | PL | Status Report |
319 | 7/23/1999 | Waller Creek Communications, I | PL | Correction of typographical error on prior filing |
320 | 7/28/1999 | SWB | PL | LETTER TO JUDGES RE : LETTER TOF EXPLANATION |
321 | 8/10/1999 | PUC POLICY DEVELOPMENT | PL | FINAL ORDER |
322 | 8/10/1999 | PUC POLICY DEVELOPMENT | PL | ORDER NO. 15: APPROVING AMENDMENT TO INTERCONNECTION AGREEMENT |
323 | 8/11/1999 | SPRINT COMMUNICATIONS CO | PL | SPRINT COMMUNICATIONS COMPANY L.P.'S NOTICE OF SUBSTITUTION OF COUNSEL |
324 | 8/20/1999 | SWB | PL | SWB TELEPHONE COMPANYS STATUS REPORT |
325 | 8/30/1999 | SWB | PL | Motion for Rehearing and Clarification |
326 | 9/3/1999 | PUC POLICY DEVELOPMENT | PL | ORDER DIRECTING RESPONSES TO MOTION FOR REHEARING AND CLARIFICATION |
327 | 9/8/1999 | Waller Creek Communications, I | PL | WCC's Reply to SWBT's Motion for Rehearing and Clarification |
328 | 9/10/1999 | SWB | PL | SOUTHWESTERN BELL TELEPHONE COMPANY'S STATUS REPORT |
329 | 9/15/1999 | PUC POLICY DEVELOPMENT | PL | LETTER TO ALL PARTIES INDICATING THAT THE COMMISSIONERS HAVE VOTED TO CONSIDER SWBT'S MOTION FOR REHEARING AT THE 9/23/99 OPEN MEETING |
330 | 9/30/1999 | PUC POLICY DEVELOPMENT | PL | TO ALL PARTIES OF RECORD BE ADVISED THIS DOCKETS HAVE BEEN PLACED ON THE OPEN MEETING AGENDA ON WEDNESDAY, OCT. 6, 1999. THE COMMISSIONERS WILL CONSIDER THIS MATTER FOR DISCUSSION & POSSIBLE ACTION ... |
331 | 10/11/1999 | SWB | PL | STATUS REPORT |
332 | 11/8/1999 | PUC POLICY DEVELOPMENT | PL | ORDER DIRECTING BRIEFING ON FEDERAL COMMUNICATIONS COMMISSION ORDER |
333 | 11/10/1999 | SWB | PL | STATUS REPORT |
334 | 11/17/1999 | WALLER CREEK COMMUNICATIONS | PL | BRIEF ON THE FCC UNE ORDER. |
335 | 11/17/1999 | PUC POLICY DEVELOPMENT | PL | ARBITRATORS' RESPONSE TO REQUEST FOR BRIEFING |
336 | 11/17/1999 | SWB | PL | RESPONSE TO ORDER DIRECTING BRIEFING ON EFFECT OF THE FCC'S "UNE REMAND ORDER" |
337 | 11/29/1999 | PUC POLICY DEVELOPMENT | PL | NOTICE TO ALL PARTIES THAT THE COMMISSIONERS WILL CONSIDER THIS MATTER FOR DISCUSSION AND POSSIBLE ACTION WITH RESPECT TO SWBT'S MOTION FOR CLARIFICATION AT THE 12/01/99 OPEN MEETING |
338 | 12/8/1999 | PUC POLICY DEVELOPMENT | PL | ORDER SETTING INTERIM RATE AND ESTABLISHING PROCEDURAL SCHEDULE |
339 | 12/10/1999 | PUC POLICY DEVELOPMENT | PL | ORDER ON CLARIFICATION AND REMANDING PROCEEDING TO ARBITRATORS |
340 | 12/10/1999 | SWB | PL | STATUS REPORT |
341 | 1/7/2000 | SWB | PL | LETTER TO MS DODSON RE : DEVELOPEMENT OF A JOINT DPL |
342 | 1/10/2000 | SWB | PL | MOTION TO CORRECT THE ORDER OF DECEMBER 10, 1999 |
343 | 1/10/2000 | SWB | PL | STATUS REPORT |
344 | 1/12/2000 | SWB | PL | DECISION POINT LIST |
345 | 1/12/2000 | WALLER CREEK COMMUNICATIONS | PL | NOTICE OF SUBMISSION OF CONFIDENTIAL COST STUDY |
346 | 1/14/2000 | WALLER CREEK COMMUNICATIONS | TEST | NOTICE OF SUBMISSION OF CONFIDENTIAL TESTIMONY OF DR AUGUST ANKUM |
347 | 1/14/2000 | WALLER CREEK COMMUNICATIONS | TEST | DIRECT TESTIMONY OF LOWELL FELDMAN |
348 | 1/14/2000 | WALLER CREEK COMMUNICATIONS | TEST | DIRECT TESTIMONY OF GARY NEKULA |
349 | 1/14/2000 | WALLER CREEK COMMUNICATIONS | TEST | DIRECT TESTIMONY OF BRIAN DE HAVEN |
350 | 1/14/2000 | SWB | TEST | Direct Testimony of Curtis L. Hopfinger |
351 | 1/14/2000 | SWB | TEST | DIRECT TESTIMONY OF LEONARD D ELLIS |
352 | 1/14/2000 | SWB | TEST | Direct Testimony of Cherylann Mears |
353 | 1/14/2000 | SWB | TEST | DIRECT TESTIMONY OF JAN BRAINARD |
354 | 1/14/2000 | SWB | TEST | Direct Testimony of John P. Lube |
355 | 1/21/2000 | PUC POLICY DEVELOPMENT | PL | LETTER TO ALL PARTIES RE : THE COMMISSIONERS WILL CONSIDER THE MOTION TO CORRECT ORDER AND POSSIBLE ACTION AT THE 1/27/00 OPEN MEETING |
356 | 1/24/2000 | PUC POLICY DEVELOPMENT | PL | ORDER MEMORIALIZING PARTIES ASSERTIONS WITH RESPECT TO THE NEED FOR ARBITRATION |
357 | 1/27/2000 | PUC POLICY DEVELOPMENT | PL | 2ND ORDER ON CLARIFICATION AND REMANDING PROCEEDING TO ARBITRATORS |
358 | 2/10/2000 | SWB | PL | STATUS REPORT |
359 | 7/18/2000 | PUC POLICY DEVELOPMENT | PL | ORDER REQUIRING STATUS REPORT |
360 | 7/31/2000 | SWB | PL | REQUEST FOR EXTENSION TO FILE STATUS REPORT |
361 | 8/1/2000 | PUC POLICY DEVELOPMENT | PL | ORDER GRANTING EXTENSION OF TIME TO FILE STATUS REPORT |
362 | 8/4/2000 | WALLER CREEK COMMUNICATIONS | PL | STATUS REPORT |
363 | 8/17/2000 | PUC POLICY DEVELOPMENT | PL | ORDER EXTENDING ABATEMENT |
364 | 11/6/2000 | SWB | PL | REQUEST HEARING |
365 | 11/6/2000 | WALLER CREEK COMMUNICATIONS | PL | REQUEST FOR HEARING |
366 | 11/9/2000 | PUC POLICY DEVELOPMENT | PL | ORDER UNABATING |
367 | 11/20/2000 | SWB | PL | JOINT DECISION POINT LIST |
368 | 12/5/2000 | SWB/WALLER CREEK | PL | PROPOSED SCHEDULING ORDER |
369 | 12/12/2000 | SWB | PL | ALTERNATIVE PROPOSED SCHEDULING ORDER FOR DS-3 PHASE |
370 | 5/24/2001 | SWB | PL | REQUEST OF TWO WEEK DELAY FOR FINALIZATION |
371 | 6/5/2001 | WALLER CREEK COMMUNICATIONS | PL | JOINT MOTION TO DISMISS WITH PREJUDICE |
372 | 6/5/2001 | PUC POLICY DEVELOPMENT | PL | ORDER DISMISSING PROCEEDINGS WITH PREJUDICE- WALLER CREEK |
373 | 7/15/2003 | PUC POLICY DEVELOPMENT | EX | SWBT EXHIBITS #1A |
374 | 7/15/2003 | PUC POLICY DEVELOPMENT | EX | WC EXHIBITS #11 |
375 | 7/15/2003 | PUC POLICY DEVELOPMENT | EX | WCC EXHIBITS #24-25, 36-38, 40 |
376 | 9/16/2004 | PUC POLICY DEVELOPMENT | CONF | WCC DS-3 UNE LOOP COST STUDY (NO. 806, 6-ENVELOPES) (RETURN FROM POLICY DEVELOPMENT) |
377 | 9/16/2004 | PUC POLICY DEVELOPMENT | CONF | TESTIMONY OF DR. AUGUST H. ANKAM (NO. 747) 3-ENVELOPES (RETURN FROM POLICY DEVELOPMENT) |
378 | 9/16/2004 | PUC POLICY DEVELOPMENT | CONF | CONFIDENTIAL COST STUDY FOR ITEM ON AIS 345 (RETURN FROM POLICY DEVELOPMENT) |
379 | 9/16/2004 | PUC POLICY DEVELOPMENT | CONF | CONFIDENTIAL; DS3 LOOP, TX UNBUNDLED LOCAL LOOP, NETWORK COMPONENTS 2-ENVELOPES (RETURN FROM POLICY DEVELOPMENT) |
380 | 8/1/2006 | CENTRAL RECORDS | PL | FILE PURGED (2/17) |
381 | 7/23/2019 | CENTRAL RECORDS | PL | BOOK FILE |
Export to Excel |