Filings for 11520



Case Style   PETITION OF THE GENERAL COUNSEL FOR AN INQUIRY INTO THE REASONABLENESS OF THE RATES AND SERVICES OF SOUTHWESTERN PUBLIC SERVICE CO.

619 filing(s).

Item File Stamp Party Item Type Filing Description
1 10/9/1992 GC PL PETITION OF THE GENERAL COUNSEL FOR AN INQUIRY INTO THE REASONABLENESS OF THE RATES AND SERVICES OF SOUTHWESTERN PUBLIC SERVICE CO.
2 10/20/1992 HEARINGS PL EXAMINER'S ORDER #1: NOTICE OF PREHEARING CONFERENCE AND ESTABLISHING FILING REQUIREMENTS
3 10/22/1992 SOUTHWESTERN PL LETTER: REQUESTING ALL FUTURE ORDERS.
4 10/28/1992 SPS PL ORGINAL ANSWER
5 10/28/1992 TIEC PL PETITION FOR LEAVE TO INTERVENE
6 10/29/1992 DEPT OF ENERGY PL APPLICATION TO INTERVENE
7 10/29/1992 ASARCO PL MOTION TO INTERVENE
8 11/2/1992 HEARINGS PL EXAMINER'S ORDER #2: PREHEARING ORDER ESTABLISHING DEADLINE FOR FILING RATE FILING PACKAGE, PROCEDURAL SCHEDULE & DATE FOR THE HOM
9 11/3/1992 KENNEDY PL TRANSCRIPT-PHC,10:00AM FRI 10/30/92
10 11/3/1992 SPS PL FORM OF NOTICE
11 11/12/1992 HEARINGS PL EXAMINER'S ORDER 33 : REQUESTING LIST OF MUNICIPALITIES EXERCISING ORIGINAL JURISDICTION
12 11/16/1992 SPS PL REQUESTS FOR ALL ORDERS AND OTHER COMMUNICATIONS TO BE SENT FEDRAL EXPRESS
13 11/18/1992 SPS PL NOTICE THAT DOCUMENTS IDENTIFIED AT THE PREHEARING CONFERENCE ARE BEING SENT TO THE PARTIES REFERENCED
14 11/19/1992 SPS PL APPROVED TARIFF LISTING THE COUNTIES AND CITIES PROVIDED ELECTICAL SERVICE BY SPS
15 11/19/1992 HEARINGS PL EXAMINER'S ORDER #4 : ESTABLISHING DEADLINE FOR STATEMENT DEFINING SCOPE OF GC'S INQUIRY
16 11/24/1992 SPS PL LETTER TO THE COMMISSION RE : UPDATED DOCUMENTS IDENTIFIED DURING THE PREHEARING CONFERENCE ARE BEING SENT TO THE PARTIES
17 12/8/1992 GC PL RESPONSE TO EXAMINER'S ORDER #4
18 12/10/1992 SPS PL DESIGNATION OF TEST YEAR
19 12/16/1992 SPS PL REPLY TO GC'S RESPONSE TO EXAMINER'S ORDER #4.
20 1/15/1993 SPS PL PUBLISHER'S AFFIDAVIT
21 1/20/1993 GC PL SUPPLEMENTAL PETITION
22 1/26/1993 SPS PL NOTICE OF UPDATED DOCUMENTS IDENTIFIED DURING THE PREHEARING CONFERENCE
23 2/25/1993 SPS PL LETTER TO THE COMISSION RE : UPDATED AS IDENTIFIED AT THE 10/30/92 ARE BEING SENT TO THE PARTIES
24 3/1/1993 CITY OF AMARILLO PL PETITION FOR LEAVE TO INTERVENE
25 3/8/1993 HEARINGS PL EXAMINER'S ORDER #5 : GRANTING MOTION TO INTERVENE
26 3/9/1993 SPS PL LETTER TO THE COMMISSION RE : CORRECTION TO THE 1/21/93 UPDATED DOCUMENTS AS IDENTIFIED DURING THE 10/30/92 PREHEARING CONFERENCE
27 3/17/1993 HEARINGS PL EXAMINER'S ORDER #6 : ESTABLISHING WORKPAPERS FILING REQUIREMENTS
28 3/30/1993 SPS PL RATE FILING PACKAGE AND WORKPAPAERS
29 4/1/1993 HEARINGS PL EXAMINER'S ORDER #7 : REQUESTING RESPONSE TO DRAFT PROTECTIVE ORDER; REQUIRING SPS FILING; AND ESTABLISHING NEW FILING REQUIREMENTS
30 4/5/1993 CITY OF AMARILLO RFI 1ST RFI TO SPS
31 4/5/1993 GC PL LETTER TO JUDGE HAMILTON AND EXAMINER POMERLEAU RE : THE FUEL PHASE
32 4/8/1993 SPS PL MOTION FOR EXPEDITED CLARIFICATION ON EXAMINER'S ORDER #7
33 4/9/1993 STATE OF TEXAS PL PLEA IN INTERVENTION
34 4/9/1993 GC PL LETTER TO SPS RE : CONFIDENTIALITY DISCLOSURE AGREEMENT
35 4/9/1993 ASARCO RFI 1ST RFI TO SPS
36 4/12/1993 SPS PL APPEAL FROM EXAMINER'S ORDER #7 AND REQUEST FOR STAY
37 4/12/1993 HEARINGS PL EXAMINER'S ORDER #8 : ORDER GRANTING MOTION FOR EXPEDITED CLARIFICATION
38 4/12/1993 ASARCO RFI 2ND RFI TO SPS
39 4/13/1993 CITIES RFI 2ND RFI TO SPS
40 4/13/1993 SPS PL WITHDRAWAL OF THE APPEAL OF EXAMINER'S ORDER #7 AND REQUEST FOR STAY
41 4/14/1993 SPS PL WITHDRAWAL OF APPEAL OF EXAMINER'S ORDER #7
42 4/16/1993 CITIES RFI 3RD RFI TO SPS
43 4/16/1993 GC PL MOTION REQUESTING ADDITIONAL TIME FOR DETERMINATION OF MATERIAL DEFICIENCIES
44 4/19/1993 CITIES RFI 4TH RFI TO SPS
45 4/19/1993 HEARINGS PL EXAMINER'S ORDER #9 : ORDER GRANTING MOTION TO INTERVENE AND SETTING DEADLINE FOR FILINGS
46 4/21/1993 CITIES RFI 5TH RFI TO SOUTHWESTERN PUBLIC SERVICE CO.
47 4/21/1993 GC PL PROTECTIVE ORDER (DRAFT)
48 4/22/1993 SPS PL OBJECTIONS TO ASARCO 2ND RFI
49 4/22/1993 SPS PL OBJECTIONS TO ASARCO 1ST RFI
50 4/22/1993 SPS PL LETTER FROM MR. SHACKELFORD, REGARDING NEGOTIATIONS CONCERNING OBJECTIONS TO ASARCO 1ST RFI.
51 4/22/1993 SPS PL OBJECTIONS TO CITIES 2ND RFI.
52 4/22/1993 GC RFI 1ST RFI TO SPS
53 4/22/1993 ASARCO RFI 3RD RFI TO SOUTHWESTERN PUBLIC SERVICE CO.
54 4/23/1993 CITIES RFI 6TH RFI TO SPS
55 4/23/1993 CANADIAN RIVER MUNICIPAL WATER PL PLEA IN INTERVENTION
56 4/26/1993 CITIES RFI 7TH RFI TO SPS
57 4/26/1993 SPS RFI RESPONSE TO CITIES 1ST RFI
58 4/27/1993 HEARINGS PL PROTECTIVE ORDER
59 4/28/1993 GC RFI 3RD RFI TO SPS #DG-41 THRU DG-53 (REV REQ)
60 4/28/1993 GC RFI 2ND RFI TO SPS #SFC-14 THRU SFC-40 (REV REQ)
61 4/29/1993 GC RFI 4TH RFI TO SPS #DG-54 THRU DG-65 (REV REQ)
62 4/30/1993 SPS CONF CONFIDENTIAL MATERIAL PURSUANT TO EXAMINER'S ORDER NO. 8, RELATED TO THE RATE FILING PACKAGE (5 VOLUMES)
63 4/30/1993 GC RFI 6TH RFI TO SPS #DG-139 THRU DG-147 (REV REQ)
64 4/30/1993 GC RFI 5TH RFI TO SPS #DW-66 THRU DW-138 (REV REQ)
65 4/30/1993 GC RFI 7TH RFI TO SPS #DG-148 THRU DG-151 (REV REQ)
66 4/30/1993 GC PL LETTER TO SPS RE : CERTIFICATION OF AGREEMENT TO BE BOUND BY PROTECTIVE ORDER
67 5/3/1993 HEARINGS PL EXAMINER'S ORDER #10 : ORDER GRANTING MOTION TO INTERVENE
68 5/3/1993 SPS RFI RESPONSE TO ASARCO'S 1ST RFI
69 5/3/1993 SPS RFI RESPONSE TO CITIES 1ST RFI
70 5/3/1993 SPS RFI RESPONSE TO CITIES 2ND RFI
71 5/3/1993 SPS RFI RESPONSE TO ASARCO'S 2ND RFI
72 5/4/1993 CITIES RFI 9TH RFI TO SOUTHWESTERN PUBLIC SERVICE
73 5/4/1993 SPS PL OBJECTIONS TO ASARCO'S 3RD RFI.
74 5/4/1993 GC RFI 8TH RFI TO SOUTHWESTERN PUBLIC SERVICE CO.
75 5/4/1993 GC RFI CORRECTED 5TH RFI TO SOUTHWESTERN PUBLIC SERVICE CO.
76 5/5/1993 ASARCO RFI 4TH RFI TO SPS
77 5/5/1993 GC RFI 9TH RFI TO SPS
78 5/5/1993 SPS PL OBJECTIONS TO GC 1ST RFI
79 5/5/1993 CITIES RFI 10TH RFI TO SPS
80 5/6/1993 SPS RFI RESPONSE TO CITIES 3RD RFI
81 5/6/1993 SPS TEST ERRATA TO THE DIRECT TESTIMONY OF THE RATE FILING PACKAGE SCHEDULES
82 5/7/1993 GC RFI 10TH RFI TO SPS #SFC-164 THRU SFC-167 (REV REQ)
83 5/10/1993 SPS RFI RESPONSE TO CITIES 4TH RFI
84 5/10/1993 CITIES RFI 11TH RFI TO SPS
85 5/11/1993 SPS RFI RESPONSE TO CITIES 5TH RFI
86 5/11/1993 GC PL LETER TO SPS RE : ADDITIONAL CERTIFICATIONS OF AGREEMENT TO BE BOUND BY THE PROTECTIVE ORDER
87 5/11/1993 GC RFI 11TH RFI TO SPS #DG-168 THRU DG-173 (REV REQ)
88 5/12/1993 GC RFI 13TH RFI TO SPS #DW-177 THRU DW-187 (REV REQ)
89 5/12/1993 GC RFI 14TH RFI TO SPS #SG-188 THRU SG-198 (REV REQ)
90 5/12/1993 GC RFI 12TH RFI TO SPS #DG-174 THRU DG-176 (REV REQ)
91 5/12/1993 GC RFI 17TH RFI TO SOUTHWESTERN PUBLIC SERVICE
92 5/12/1993 GC RFI 16TH RFI TO SOUTHWESTERN PUBLIC SERVICE
93 5/12/1993 GC RFI 15TH RFI TO SOUTHWESTERN PUBLIC SERVICE
94 5/13/1993 SPS RFI RESPONSE TO ASARCO 3RD RFI
95 5/13/1993 SPS RFI RESPONSE TO CITIES 6TH RFI
96 5/13/1993 ENERGAS PL MOTION TO INTERVENE
97 5/13/1993 ASARCO CONF CONFIDENTIAL MATERIALS RELATING TO ASARCO'S 3RD RFI
98 5/14/1993 TIEC RFI 1ST RFI TO SPS (REV REQ)
99 5/14/1993 TIEC RFI 2ND RFI TO SPS (RATE DESIGN)
100 5/14/1993 GC RFI 18TH RFI TO SPS #DW-216 THRU DW-217 (REV REQ)
101 5/14/1993 GC RFI CORRECTED 5TH RFI TO SPS #DW-99 (REV REQ)
102 5/17/1993 GOLDEN SPREAD ELECTRIC COOP PL MOTION TO INTERVENE
103 5/17/1993 SPS RFI RESPONSE TO CITIES 7TH RFI
104 5/17/1993 SPS RFI RESPONSE TO GC'S 1ST RFI
105 5/17/1993 SPS PL WORKPAPERS TO THE RATE FILING PACKAGE
106 5/18/1993 GC RFI 19TH RFI TO SPS #DW-219 THRU DW-222 (REV REQ)
107 5/19/1993 SPS PL SERVICE LIST OF PERSON'S AGREEING TO BE BOUND BY PROTECTIVE ORDER
108 5/19/1993 SPS RFI RESPONSE TO GC'S 3RD RFI
109 5/19/1993 SPS RFI RESPONSE TO GC'S 4TH RFI
110 5/19/1993 SPS RFI RESPONSE TO GC'S 2ND RFI
111 5/19/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO CITIES 6TH RFI
112 5/19/1993 GC RFI 20TH RFI TO SPS #DJ-223 THRU DJ-234 (REV REQ)
113 5/19/1993 SPS CONF CONFIDENTIAL MATERIAL RELATING TO GC'S 2ND RFI
114 5/19/1993 GC RFI 21ST RFI TO SPS #GS-235 THRU GS-245 (REV REQ)
115 5/20/1993 SPS PL MOTION TO COMPEL ANSWERS TO RFI TO CITIES
116 5/21/1993 GC RFI LETTER TO SPS RE : TYPO ERROR IN GC'S 7TH RIF
117 5/21/1993 GC RFI 22ND RFI TO SPS #DJ-246 THRU DJ-252 (REV REQ)
118 5/24/1993 GC RFI 24TH RFI TO SPS #DW-258 THRU DW-261 (REV REQ)
119 5/24/1993 GC RFI 23RD RFI TO SPS #BA-253 THRU BA-257 (REV REQ)
120 5/24/1993 CITY OF TEXHOMA PL LETTER OF SUPPORT FOR CONTINUING THE BILLING PROCESS OF SWBT
121 5/24/1993 SPS RFI RESPONSE TO GC'S 7TH RFI
122 5/24/1993 SPS RFI RESPONSE TO GC'S 6TH RFI
123 5/24/1993 SPS RFI RESPONSE TO CITIES 1ST RFI
124 5/24/1993 SPS PL UPDATED AND REVISED SCHEDULES RELATED TO THE RATE FILING PACKAGE
125 5/24/1993 SPS PL OBJECTIONS TO GC'S 16TH RFI
126 5/24/1993 SPS RFI RESPONSE TO GC'S 5TH RFI
127 5/24/1993 SPS RFI RESPONSE TO CITIES 9TH RFI
128 5/25/1993 TIEC RFI 5TH RFI TO SPS (RATE DESIGN)
129 5/25/1993 TIEC RFI 4TH RFI TO SPS (REV REQ)
130 5/25/1993 TIEC RFI 3RD RFI TO SPS (REV REQ)
131 5/25/1993 SPS PL CONFIRMATION OF WITHDRAWAL OF RFI 1-6
132 5/25/1993 SPS CONF CONFIDENTIAL MATERIAL RELATING TO CITIES 10TH RFI
133 5/25/1993 SPS RFI RESPONSE TO CITIES 10TH RFI
134 5/25/1993 GC RFI 27TH RFI TO SPS #GS-294 THRU GS-300 (REV REQ)
135 5/25/1993 GC RFI 26TH RFI TO SPS #IN-284 THRU IN-293 (REV REQ)
136 5/25/1993 GC RFI 25TH RFI TO SPS #DJ-262 THRU DJ-283 (REV REQ)
137 5/26/1993 SPS RFI RESPONSE TO ASARCO'S 4TH RFI
138 5/26/1993 SPS RFI RESPONSE TO GC'S 9TH RFI
139 5/26/1993 SPS RFI RESPONSE TO GC'S 8TH RFI
140 5/26/1993 GC PL LETTER TO SPS RE : ADDITIONAL CERTIFICATION OF AGREEMENT
141 5/26/1993 GC RFI 29TH RFI TO SPS #BA-303 THRU BA-306 (REV REQ)
142 5/26/1993 GC RFI 28TH RFI TO SPS #DW-301 THRU DW-302 (REV REQ)
143 5/26/1993 GC PL MEMO TO JUDGE HAMILTON RE : WITHDRAWAL OF GC'S 16TH RFI #DW-210
144 5/26/1993 GC RFI 30TH RFI TO SPS #DW-307 THRU DW-309 (REV REQ)
145 5/26/1993 HEARINGS PL EXAMINER'S ORDER #11 : ORDER GRANTING MOTION TO INTERVENE
146 5/27/1993 GC PL LETTER TO KPMG PEAT MARWICK RE : WORKPAPERS
147 5/27/1993 SPS PL MOTION TO INTERVENE
148 5/27/1993 GC RFI 31ST RFI TO SPS #GS-310 THRU GS-313 (REV REQ)
149 5/28/1993 SPS PL MOTION TO VACATE PORTION OF EXAMINER'S ORDER #11
150 5/28/1993 ASARCO PL MOTION TO STRIKE PREFILED TESTIMONY OF GERALD J MILLER
151 5/28/1993 GOLDEN SPREAD ELECTRIC COOP RFI 1ST RFI TO SPS AND ANSWERS TO SPS RESPONSE
152 5/28/1993 CITIES RFI 12TH RFI TO SPS
153 6/1/1993 STATE OF TX RFI 1ST RFI TO SPS
154 6/1/1993 GC RFI 33RD RFI TO SPS #DJ-318 THRU DJ-330 (REV REQ)
155 6/1/1993 SPS RFI RESPONSE TO GC'S 13TH RFI
156 6/1/1993 SPS RFI RESPONSE TO GC'S 11TH RFI
157 6/1/1993 HEARINGS PL ORDER #12 : ORDER SUSPENDING JURISDICTIONAL DEADLINE IN DKT 11824
158 6/1/1993 SPS RFI RESPONSE TO CITIES 11TH RFI
159 6/1/1993 SPS RFI RESPONSE TO CITIES 11TH RFI
160 6/1/1993 SPS RFI 2ND SUPPLEMENTAL RESPONSE TO CITIES 6TH RFI
161 6/1/1993 SPS RFI RESPONSE TO CITIES 4TH RFI
162 6/1/1993 SPS PL RESPONSE TO CITIES MOTION TO COMPEN ANSWERS TO RFI AND SUPPORTING AFFIDAVIT
163 6/1/1993 GC RFI 32ND RFI TO SPS #SFC-314 THRU SFC-317 (REV REQ)
164 6/2/1993 SPS RFI RESPONSE TO GC'S 15TH RFI
165 6/2/1993 SPS RFI RESPONSE TO GC'S 17TH RFI
166 6/2/1993 SPS RFI RESPONSE TO GC'S 16TH RFI
167 6/2/1993 SPS RFI RESPONSE TO GC'S 14TH RFI
168 6/2/1993 SPS RFI RESPONSE TO GC'S 12TH RFI
169 6/2/1993 SPS RFI SUPPLEMENTAL RESPONSE TO GC'S 13TH RFI
170 6/2/1993 SPS CONF CONFIDENTIAL MATERIALS RELATING TO GC'S 15TH RFI
171 6/2/1993 CITIES RFI 13TH RFI TO SPS
172 6/2/1993 ASARCO RFI 5TH RFI TO SPS
173 6/2/1993 GOLDEN SPREAD ELECTRIC COOP PL RESPONSE TO SPS'S MOTION TO VACATE A PORTION OF THE EXAMINER'S ORDER #11
174 6/2/1993 GOLDEN SPREAD ELECTRIC COOP PL CORRECTION TO ITEM ON DEFINITIONS TO 1ST RFI TO SPS
175 6/3/1993 GC RFI 36TH RFI TO SPS
176 6/3/1993 GC RFI 35TH RFI TO SPS
177 6/3/1993 GC RFI 44TH RFI TO SPS
178 6/3/1993 SPS RFI RESPONSE TO TIEC 2ND RFI
179 6/3/1993 SPS RFI RESPONSE TO GC 18TH RFI
180 6/3/1993 SPS RFI RESPONSE TO TIEC 1ST RFI
181 6/3/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO GC 14TH RFI
182 6/3/1993 GC RFI 37TH RFI TO SPS
183 6/4/1993 CITIES RFI 14TH RFI TO SPS
184 6/4/1993 SPS PL LIST OF PERSONS AGREEING TO BE BOUND BY PROTECTIVE ORDER
185 6/4/1993 GC RFI 39TH RFI TO SPS #DW-361 THRU DW-363 (REV REQ)
186 6/4/1993 GC RFI 38TH RFI TO SPS #SFC-351 THRU SFC-360 (REV REQ)
187 6/7/1993 SPS PL RESPONSE TO ASARCO'S MOTION TO STRIKE PREFILED TESTIMONY OF GERALD J MILLER AND SUPPORTING AFFIDAVIT
188 6/7/1993 SPS RFI RESPONSE TO GC'S 19TH RFI
189 6/7/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO ASARCO'S 3RD RFI
190 6/7/1993 GC RFI 40TH RFI TO SPS #DW-364 THRU DW-365 (REV REQ)
191 6/7/1993 GC RFI 41ST RFI TO SPS #DS-366 THRU DS-383 (RATE DESIGN)
192 6/8/1993 GC RFI 42ND RFI TO SPS #SMB-384 THRU SMB-389 - RATE DESIGN
193 6/8/1993 GC RFI 44TH RFI TO SPS #ECR-391 THRU ECR-400 - REV REQ
194 6/8/1993 GC RFI 43RD RFI TO SPS #SMB-390 - RATE DESIGN
195 6/8/1993 ASARCO RFI 6TH RFI TO SPS
196 6/8/1993 ASARCO RFI 7TH RFI TO SPS
197 6/9/1993 SOUTHWESTERN PUBLIC SERVICE RFI RESPONSE TO GC'S 20TH RFI
198 6/9/1993 SOUTHWESTERN PUBLIC SERVICE RFI RESPONSE TO GC'S 21ST RFI
199 6/9/1993 SPS PL AGREEMENT BETWEEN SPS AND ASRCO
200 6/9/1993 SPS CONF CONFIDENTIAL MATERIALS RELATING TO GC'S 21ST RFI
201 6/9/1993 SPS CONF CONFIDENTIAL MATERIALS RELATING TO GC'S 20TH RFI
202 6/9/1993 SPS RFI 2ND SUPPLEMENTAL RESPONSE TO ASARCO'S 3RD RFI
203 6/9/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO CITIES 7TH RFI
204 6/9/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO GC'S 2ND RFI
205 6/9/1993 SPS RFI 15TH RFI TO SPS
206 6/9/1993 GC RFI 44TH RFI TO SPS #DW-401 (REV REQ)
207 6/10/1993 GC RFI 47TH RFI TO SPS #SFC-405 THRU SFC-406 (REV REQ)
208 6/10/1993 GC RFI 46TH RFI TO SPS #DW-401 THRU DW-404 (REV REQ)
209 6/10/1993 GC RFI 48TH RFI TO SPS #SMB-407 (RATE DESIGN)
210 6/10/1993 HEARINGS PL EXAMINER'S ORDER #13 : ORDER DENYING SPS' MOTION TO VACATE PORTION OF EXAMINER'S ORDER #11
211 6/11/1993 GC RFI 50TH RFI TO SWBT
212 6/11/1993 GC RFI 49TH RFI TO SOUTHWESTERN PUBLIC SERVICE CO.
213 6/11/1993 TIEC RFI 6TH & 7TH RFI TO SOUTHWESTERN PUBLIC SERVICE CO.
214 6/14/1993 GC RFI 51ST RFI TO SPS #SFC-418 THRU SFC-421 (REV REQ)
215 6/14/1993 TIEC RFI 8TH RFI TO SPS
216 6/14/1993 SPS RFI RESPONSE TO GC'S 22ND RFI
217 6/14/1993 SPS RFI RESPONSE TO GC'S 24TH RFI
218 6/14/1993 SPS RFI RESPONSE TO GC'S 23RD RFI
219 6/14/1993 SPS RFI RESPONSE TO TIEC'S 5TH RFI
220 6/14/1993 SPS RFI RESPONSE TO TIEC'S 4TH RFI
221 6/14/1993 SPS RFI RESPONSE TO TIEC'S 3RD RFI
222 6/14/1993 SPS RFI SUPPLEMENTAL RESPONSE TO ASARACO'S 3RD RFI
223 6/14/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO CITIES 10TH RFI
224 6/14/1993 SPS RFI SUPPLEMENTAL RESPOSNE TO CITIES 3RD RFI
225 6/14/1993 SPS RFI SUPPLEMENTAL RESPONSE TO CITIES 9TH RFI
226 6/14/1993 SPS RFI 2ND SUPPLEMENTAL RESPONSE TO GC'S 13TH RFI
227 6/14/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO GC'S 5TH RFI
228 6/14/1993 HEARINGS PL EXAMINER'S ORDER #14 : ORDER REQUIRING SPS TO COMPLY WITH SCHEDULE S-6 OF COMMISSION RATE FILING PACKAGE
229 6/15/1993 CITY OF AMARILLO PL REPLY TO RESPONSE TO MOTION TO COMPEL ANSWERS TO RFI
230 6/15/1993 GOLDED SPREAD ELECTRIC COOP PL LETTER TO EXAMINER POMERLEAU AND JUDGE HAMILTON RE : REQUESTS FOR COPY OF ALL OF THE RESPONSES TO ITS RFI
231 6/15/1993 SPS RFI RESPONSE TO GC'S 26TH RFI
232 6/15/1993 SPS RFI RESPONSE TO GC'S 28TH RFI
233 6/15/1993 SPS RFI RESPONSE TO GC'S 27TH RFI
234 6/15/1993 SPS RFI RESPONSE TO GC'S 26TH RFI
235 6/15/1993 SPS CONF CONFIDENTIAL MATERIAL RELATING TO GC'S 25TH RFI
236 6/15/1993 ASARCO RFI 8TH RFI TO SPS
237 6/15/1993 GC RFI 52ND RFI TO SPS #IN-422 THRU IN-439 (RATE DESIGN)
238 6/16/1993 SPS RFI RESPONSE TO GC'S 29TH RFI
239 6/16/1993 SPS RFI PAGE 43 OF EXHIBIT (TIEC4-3)
240 6/16/1993 SPS CONF CONFIDENTIAL MATERIALS REALTING TO GC'S 30TH RFI
241 6/16/1993 SPS RFI RESPONSE TO GC'S 30TH RFI
242 6/16/1993 GC RFI 53RD RFI TO SPS #DW-440 THRU DW-443 (REV REQ)
243 6/17/1993 SPS RFI RESPONSE TO CITIES 12TH RFI
244 6/17/1993 SPS RFI RESPONSE TO GC'S 31ST RFI
245 6/17/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO GC'S 21ST RFI
246 6/17/1993 SPS RFI 2ND SUPPLEMENTAL RESPONSE TO CITIES 10TH RFI
247 6/17/1993 SPS RFI 2ND SUPPLEMENTAL RESPONSE TO GC'S 5TH RFI
248 6/17/1993 HEARINGS PL LETTER TO MS BALL RE : EXPLANATION OF WAYS IN WHICH YOU ARE ENTITLED TO PARTICIPATE
249 6/17/1993 HEARINGS PL LETTER TO MR DANKS RE : WAYS IN WHICH YOU ARE ENTITLED TO PARTICIPATE
250 6/17/1993 GC RFI 54TH RFI TO SPS #DW-44 THRU DW-453 (REV REQ)
251 6/18/1993 SPS PL OBJECTIONS TO ASARCO'S 6TH AND 7TH RFI
252 6/18/1993 SPS PL SUPPLEMENTAL OBJECTIONS TO ASARCO'S 6TH RFI
253 6/18/1993 ASARCO RFI 9TH RFI TO SPS
254 6/21/1993 SPS PL LETTER TO ASARCO RE : AGREEMENT TO RAISE NO OBJECTION FOR FILING OBJECTIONS AFTER THE 3:00PM DEADLINE
255 6/21/1993 SPS RFI RESPOSNE TO STATE OF TX'S 1ST RFI
256 6/21/1993 SPS RFI RESPONSE TO GOLDEN SPREAD ELECTRIC COOP'S 1ST RFI
257 6/21/1993 SPS RFI RESPONSE TO GC'S 32ND RFI
258 6/22/1993 SPS RFI RESPONSE TO GC'S 33RD RFI
259 6/22/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO GOLDEN SPREAD ELECTRIC COOP'S 1ST RFI
260 6/22/1993 SPS RFI RESPONSE TO GC'S 20TH RFI
261 6/22/1993 SPS RFI 4TH SUPPLEMENTAL RESPONSE TO ASARACO'S 3RD RFI
262 6/22/1993 GC RFI 56TH RFI TO SPS #DW-455 (REV REQ)
263 6/22/1993 GC RFI 55TH RFI TO SPS #DJ-454 (REV REQ)
264 6/22/1993 GC PL LETTER TO SPS RE : ADDITIONAL CONFIDENTIAL CERTIFICATIONS OF AGREEMENT TO BE BOUND BY PROTECTIVE ORDER
265 6/23/1993 SPS PL LETTER TO ASARCO RE : CONFIRMATION OF AGREEMENT TO PROVIDE INFORMATINO WITH REGARD TO ASARCO'S 6TH RFI #13
266 6/23/1993 SPS RFI 2ND SUPPLEMENTAL RESPONSE TO GC'S 20TH RFI
267 6/23/1993 SPS RFI RESPONSE TO GC'S 34TH RFI
268 6/23/1993 SPS RFI RESPONSE TO ASARCO'S 5TH RFI
269 6/23/1993 SPS RFI SUPPLEMENTAL RESPONSE TO ASARACO'S 3RD RFI
270 6/23/1993 GC RFI REVISED RFI #Q:DJ-277; QC:a, QC:b AND QC:c
271 6/24/1993 SPS RFI RESPONSE TO GC'S 39TH RFI
272 6/24/1993 SPS RFI RESPONSE TO GC'S 38TH RFI
273 6/24/1993 SPS RFI RESPONSE TO GC'S 37TH RFI
274 6/24/1993 SPS RFI RESPONSE TO GC'S 36TH RFI
275 6/24/1993 SPS RFI RESPONSE TO GC'S 35TH RFI
276 6/24/1993 SPS RFI RESPONSE TO GC'S 25TH RFI
277 6/24/1993 SPS RFI 3RD SUPPLEMENTAL RESPONSE TO GC'S 20TH RFI
278 6/24/1993 SPS RFI RESPONSE TO CITIES 14TH RFI
279 6/24/1993 SPS RFI RESPONSE TO CITIES 13TH RFI
280 6/25/1993 GC RFI 57TH RFI TO SPS #DJ-456 (REV REQ)
281 6/25/1993 ASARCO PL LETTERS CONFIRMING THE AGREEMENT TO WITHDRAW ASARCO'S QUESTIONS.
282 6/25/1993 GC RFI REVISED RFI #DW-402 THRU DW-404
283 6/28/1993 SPS RFI 3RD SUPPLEMENTAL RESPONSE TO GC'S 13TH RFI
284 6/28/1993 SPS RFI RESPONSE TO GC'S 40TH RFI
285 6/28/1993 SPS RFI RESPONSE TO GC'S 41ST RFI
286 6/28/1993 GC RFI 58TH RFI TO SPS #IN-457 THRU IN-463 (RATE DESIGN)
287 6/28/1993 SPS PL LIST OF PERSONS AGREEING TO BE BOUND BY PROTECTIVE ORDER
288 6/29/1993 SPS RFI RESPONSE TO GC'S 44TH RFI
289 6/29/1993 SPS CONF CONFIDENTIAL MATERIALS RELATING TO GC'S 44TH RFI
290 6/29/1993 SPS RFI RESPONSE TO GC'S 35TH RFI
291 6/29/1993 SPS RFI RESPONSE TO GC'S 43RD RFI
292 6/29/1993 SPS RFI RESPONSE TO CITIES 15TH RFI
293 6/29/1993 SPS RFI RESPONSE TO ASARCO'S 6TH RFI
294 6/29/1993 SPS RFI RESPONSE TO GC'S 42ND RFI
295 6/29/1993 SPS RFI RESPONSE TO ASARCO'S 7TH RFI
296 6/29/1993 ASARCO PL CORRESPONDENCE BETWEEN ASARCO AND SPS EXTENDING THE FILING DEADLINE FOR A MOTION TO COMPEL
297 6/30/1993 SPS RFI 3RD SUPPLEMENTAL RESPONSE TO GC' S5TH RFI
298 6/30/1993 SPS RFI 2ND SUPPLEMENTAL RESPONSE TO GC'S 25TH RFI
299 6/30/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO ASARCO'S 6TH RFI
300 6/30/1993 SPS RFI RESPONSE TO GC'S 45TH RFI
301 6/30/1993 SPS RFI RESPONSE TO GC'S 46TH RFI
302 6/30/1993 SPS RFI RESPONSE TO GC'S 47TH RFI
303 6/30/1993 SPS RFI RESPONSE TO TIEC'S 6TH RFI
304 6/30/1993 SPS RFI RESPONSE TO TIEC'S 7TH RFI
305 7/1/1993 STATE OF TEXAS RFI 2ND RFI TO SOUTHWESTERN PUBLIC SERVICE CO.
306 7/1/1993 SPS RFI 4TH SUPPLEMENTAL RESPONSE TO GC 12TH RFI.
307 7/1/1993 SPS RFI RESPONSE TO GC'S 49TH RFI
308 7/1/1993 SPS RFI RESPONSE TO GC 48TH RFI
309 7/1/1993 SPS RFI RESPONSE TO GC 50TH RFI.
310 7/1/1993 SPS RFI 3RD SUPPLEMENTAL RESPONSE TO THE CITIES 1ST RFI.
311 7/1/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO GC'S 33RD RFI.
312 7/1/1993 SPS RFI 3RD SUPPLEMENTAL RESPONSE TO GC 25TH RFI.
313 7/1/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO GC'S 9TH RFI.
314 7/1/1993 SPS RFI 4TH SUPPLEMENTAL RESPONSE TO GC'S 5TH RFI.
315 7/2/1993 SPS RFI 5TH SUPPLEMENTAL RESPONSE TO GC'S 20TH RFI
316 7/2/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO STATE OF TX'S 1ST RFI
317 7/2/1993 SPS RFI 4TH SUPPLEMENTAL RESPONSE TO GC'S 25TH RFI
318 7/2/1993 SPS RFI 2ND SUPLEMENTAL RESPONSE TO GC'S 33RD RFI
319 7/5/1993 HEARINGS PL EXAMINER'S ORDER #15:
320 7/5/1993 GC PL LETTER TO JUDGE HAMILTON AND POMERLEAU RE : REQUEST FOR A RULING SO THAT ALL PARTIES WILL BE ABLE TO ACCURATELY IDENTIFY THE PROPOSED PHASES
321 7/6/1993 SPS RFI 1TS SUPPLEMENTAL RESPONSE TO TIEC'S 6TH RFI
322 7/6/1993 SPS RFI RESPONSE TO GC'S 53RD RFI
323 7/6/1993 SPS RFI RESPONSE TO ASARCO'S 8TH RFI
324 7/6/1993 SPS RFI RESPONSE TO GC'S 52ND RFI
325 7/6/1993 SPS RFI RESPONSE TO TIEC'S 8TH RFI
326 7/6/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO GC'S 30TH RFI
327 7/6/1993 SPS RFI RESPONSE TO GC'S 51ST RFI
328 7/6/1993 GC RFI 59TH RFI TO SPS #DJ-464 (REV REQ)
329 7/6/1993 GC RFI 60TH RFI TO SPS #GS-465 THRU GS-467 (REV REQ)
330 7/6/1993 GC RFI 61ST RFI TO SPS #IN-468 THRU IN-473 (RATE DESIGN)
331 7/7/1993 STATE OF TX RFI 3RD RFI TO SPS
332 7/8/1993 CITY OF AMARILLO PL MOTION FOR EXTENSION OF TIME TO FILE INTERVENOR'S TESTIMONY
333 7/8/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO ASARCO'S 7TH RFI
334 7/8/1993 SPS RFI RESPONSE TO GC'S 54TH RFI
335 7/8/1993 HEARINGS PL EXAMINER'S ORDER #16 : ORDER GRANTING REQUEST TO EXTEND DEADLINE FOR INTERVENOR TESTIMONY
336 7/9/1993 SPS RFI SUPPLEMENTAL RESPONSE TO GC'S 41ST RFI
337 7/9/1993 SPS RFI SUPPLEMENTAL RESPON TO ASARCO'S 7TH RFI
338 7/9/1993 GC RFI 1ST RFI TO GOLDEN SPREAD ELECTRIC
339 7/12/1993 SPS RFI RESPONSE TO ASARCO'S 9TH RFI
340 7/12/1993 SPS RFI 6TH SUPPLEMENTAL RESPONSE TO GC'S 20TH RFI
341 7/12/1993 SPS TEST ERRATA TO THE DIRECT TESTIMONY AND THE RATE FILING PACKAGE SCHEDULES
342 7/12/1993 SPS CONF CONFIDENTIAL MATERIALS RELATING TO EXHIBIT (ASARCO 9.8 CONF) OF ASARCO'S 9TH RFI
343 7/12/1993 SPS RFI 7TH SUPPLEMENTAL RESPONSE TO GC'S 20TH RFI
344 7/12/1993 SPS RFI 3RD SUPPLEMENTAL RESPONSE TO GC'S 33RD RFI
345 7/12/1993 SPS RFI RESPONSE TO GC'S 56TH RFI
346 7/12/1993 SPS RFI RESPONSE TO GC'S 55TH RFI
347 7/12/1993 SPS RFI 5TH SUPPLEMENTAL RESPONSE TO GC'S 26TH RFI
348 7/12/1993 GC RFI 62ND RFI TO SPS #DT-474 THRU DT-475 (REV REQ)
349 7/12/1993 ASARCO PL LETTER TO SPS RE : CONFIRMATION OF AGREEMENT THAT IT IS NOT NECESSARY FOR SPS TO PROVIDE ANY ADDITIONAL INFORMATION TO RFI #6.21 AND 7.6
350 7/13/1993 GC RFI 63RD RFI TO SPS #DS-476 THRU DS-478 (RATE DESIGN)
351 7/13/1993 SPS RFI 8TH SUPPLEMENTAL RESPONSE TO GC'S 20TH RFI
352 7/13/1993 SPS CONF CONFIDENTIAL MATERIALS RELATING TO EXHIBIT (DJ-233sl)
353 7/14/1993 SPS TEST ERRATA TO THE DIRECT TESTIMONY AND THE RATE FILING PACKAGE SCHEDULES
354 7/14/1993 SPS RFI 6TH SUPPLEMENETAL RESPONSE TO GC'S 26TH RFI
355 7/15/1993 SPS RFI RESPONSE TO GC'S 7TH RFI
356 7/15/1993 SPS RFI RESPONSE TO GC'S 58TH RFI
357 7/15/1993 SPS RFI 9TH SUPPLEMENTAL RESPONSE TO GC'S 20TH RFI
358 7/15/1993 SPS PL LETTER TO EXAMINER HAMILTON AND POMERLEAU RE : REQUEST FOR ALL PARTIES TO PROVIDE RESPONSES TO RFI'S
359 7/16/1993 SPS RFI 4TH SUPPLEMENTAL RESPONSE TO CITIES 1ST RFI
360 7/16/1993 STATE OF TX RFI 5TH RFI TO SPS
361 7/16/1993 STATE OF TX RFI 4TH RFI TO SPS
362 7/19/1993 SPS TEST ERRATA TO THE DIRECT TESTIMONY AND THE RATE FILING PACKAGE SCHEDULES
363 7/19/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO GC'S 58TH RFI
364 7/19/1993 GC RFI 64TH RFI TO SPS #DG-479 THRU DG-480 (REV REQ)
365 7/20/1993 GC RFI 65TH RFI TO SPS #DJ-481 THRU DJ-483 REV REQ
366 7/21/1993 ASARCO PL MOTION FOR EXTENSION OF TIME TO FILE INTERVENOR TESTIMONY
367 7/21/1993 HEARINGS PL EXAMINER'S ORDER #17 : EXTENDING TIME TO FILE INTERVENOR TESTIMONY
368 7/22/1993 SPS RFI RESPONSE TO STATE OF TX'S 2ND RFI
369 7/23/1993 TIEC TEST TESTIMONY AND EXHIBIT OF MICHAEL GORMAN, THEODORA S CARLSON, JEFFREY POLLOCK
370 7/23/1993 ENERGAS TEST DIRECT TESTIMONY OF JOHN ZOOK
371 7/23/1993 STATE OF TX TEST RATE DESIGN TESTIMONY OF KELSON KING
372 7/23/1993 GOLDEN SPREAD ELECTRIC COOP TEST TESTIMONY OF CARL N STOVER, JR
373 7/23/1993 CANADIAN RIVER MUN WATER AUTH TEST PREPARED TESTIMONY
374 7/23/1993 CITIES TEST TESTIMONY OF MICHAEL L ARNDT
375 7/23/1993 CITIES TEST DIRECT TESTIMONY AND EXHIBITS OF JOHN H BAKER, JR
376 7/23/1993 CITY OF AMARILLO TEST DIRECT TESTIMONY
377 7/23/1993 CITIES TEST DIRECT TESTIMONY OF JACOB POUS
378 7/23/1993 ASARCO TEST DIRECT TESTIMONY OF RAYMOND J STANLEY
379 7/23/1993 ASARCO TEST DIRECT TESTIMONY OF NEIL A EISNER
380 7/26/1993 SPS RFI RESPONSE TO GC'S 59TH RFI
381 7/27/1993 SPS RFI RESPONSE TO GC'S 61ST RFI
382 7/27/1993 SPS RFI RESPONSE TO GC'S 6TH RFI
383 7/28/1993 SPS RFI 1ST RFI TO GOLDEN SPREAD ELECTRIC COOP
384 7/28/1993 SPS RFI 1ST RFI TO ASARCO
385 7/28/1993 SPS RFI 1ST RFI TO THE CANADIAN RIVER MUNICIPAL WATER AUTHORITY
386 7/28/1993 SPS RFI 1ST RFI TO THE STATE OF TEXAS
387 7/28/1993 SPS RFI 1ST RFI TO TIEC
388 7/29/1993 GC TEST DIRECT TESTIMONY OF GLENDA J SPENCE - REV REQ
389 7/29/1993 SPS RFI 1ST RFI TO CITIES
390 7/29/1993 SPS RFI RESPONSE TO STATE OF TX'S 3RD RFI
391 7/29/1993 GC TEST DIRECT TESTIMONY OF T BRIAN ALMON
392 7/29/1993 GC TEST DIRECT TESTIMONY OF DARRYL TIETJEN
393 7/29/1993 GC TEST DIRECT TESTIMONY OF EVAN ROWE
394 7/29/1993 GC CONF CONFIDENTIAL TESTIMONY OF GLENDA J SPENCE
395 7/29/1993 GC TEST DIRECT TESTIMONY OF ENOS JONES
396 7/29/1993 GC TEST DIRECT TESTIMONY OF DAMAYANTI GHOSH - REV REQ
397 7/29/1993 GC TEST DIRECT TESTIMONY OF STACIE FOREMAN COLLINS
398 7/29/1993 GC TEST DIRECT TESTIMONY OF RICHARD BACHMEIER
399 7/29/1993 GC TEST DIRECT TESTIMONY OF DENISE STOKES
400 7/29/1993 GC TEST DIRECT TESTIMONY OF DANIELLE JAUSSAUD - REV REQ
401 7/29/1993 GC TEST DIRECT TESTIMONY OF STEPHEN BENENSON - RATE DESIGN
402 7/29/1993 GC TEST DIRECT TESTIMONY OF SANDRA L MORRIS
403 7/29/1993 GC TEST DIRECT TESTIMONY OF DEBBIE WITBECK
404 7/29/1993 GC PL PROPOSED SEQUENCE OF WITNESSES
405 7/29/1993 GC PL LETTER TO THE COMMISSION RE : THE CONFIDENTIAL AND NON-CONFIDENTIAL PORTIONS OF STAFF'S TESTIMONY AND WORKPAPERS...
406 7/29/1993 GC TEST SCHEDULES AND WORKPAPERS OF ISAAC NWOKOGBA VOL II
407 7/29/1993 GC TEST DIRECT TESTIMONY OF ISAAC NWOKOGBA - RATE DESIGN
408 7/29/1993 GC CONF CONFIDENTIAL TESTIMONY OF EVAN ROWE
409 7/30/1993 SPS RFI 1ST RFI TO ENERGAS
410 8/2/1993 SPS RFI 2ND RFI TO TIEC
411 8/2/1993 SPS RFI 2ND RFI TO ASARCO
412 8/2/1993 SPS RFI 1ST RFI TO GC
413 8/2/1993 SPS RFI 2ND RFI TO CITIES
414 8/2/1993 SPS RFI RESPONSE TO GC'S 62ND RFI
415 8/2/1993 GOLDEN SPREAD ELECTRIC COOP RFI RESPONSE TO GC'S 1ST RFI
416 8/2/1993 SPS RFI 3RD RFI TO GC
417 8/3/1993 SPS RFI RESPONSE TO GC'S 63RD RFI
418 8/3/1993 SPS RFI 2ND RFI TO GC
419 8/3/1993 SPS RFI 3RD RFI TO GC
420 8/3/1993 GC PL LETTER TO ALL PARTIES OF RECORD RE : THE WORKPAPERS OF STACIE COLLINS...
421 8/3/1993 GOLDEN SPREAD ELECTRIC COOP PL OBJECTIONS TO SPS'S 1ST RFI
422 8/4/1993 GC RFI 66TH RFI TO SPS #DG-484 THRU DG-488 (REV REQ)
423 8/4/1993 GC PL LETTER TO ALL PARTIES OF RECORD RE : ALL WORKPAPERS HAVE BEEN MADE AVAILABLE TO THE PARTIES...
424 8/4/1993 STATE OF TX RFI 6TH RFI TO SPS
425 8/4/1993 ASARCO RFI 1ST RFI TO CITIES
426 8/4/1993 ASARCO RFI 1ST RFI TO THE STATE OF TEXAS
427 8/4/1993 ASARCO RFI 1ST RFI TO TIEC
428 8/4/1993 ASARCO RFI 1ST RFI TO GC
429 8/4/1993 ASARCO RFI 10TH RFI TO SPS
430 8/5/1993 SPS RFI 3RD RFI TO CITIES
431 8/5/1993 SPS RFI 4TH RFI TO GC
432 8/5/1993 STATE OF TEXAS PL LIST OF DISPUTED ISSUES
433 8/5/1993 SPS PL LIST OF CONTESTED ISSUES
434 8/5/1993 GOLDEN SPREAD ELECTRIC COOP PL LIST OF ISSUES
435 8/5/1993 ASARCO PL OBJECTIONS TO SPS'S 1ST RFI
436 8/5/1993 ASARCO PL LIST OF CONTESTED ISSUES
437 8/5/1993 SPS PL LETTER TO STATE OF TX RE : EXTENSION OF THE DEADLINE FOR FILING OBJECTIONS TO 1TS RFI
438 8/5/1993 SPS PL LETTER TO CITIES RE : EXTENSION OF THE DEADLINE FOR FILING OBJECTIONS TO 1ST RFI
439 8/5/1993 SPS RFI 2ND RFI TO GOLDEN SPREAD ELECTRIC COOP
440 8/5/1993 GC PL LIST OF CONTESTED ISSUES
441 8/5/1993 TIEC PL LETTER TO SPS RE : AGREEMENT TO EXTEND THE DATE TO FILE OBJECTIONS TO 1ST RFI
442 8/5/1993 TIEC PL LIST OF CONTESTED ISSUES AND LETTER TO OF AGREEMENT
443 8/6/1993 SPS PL 1ST REVISED SEQUENCE OF WITNESSES
444 8/6/1993 SPS PL LETTER TO THE CANADIAN RIVER MUNICIPAL WATER AUTHORITY RE : CONFIRMING AGREEMENT TO EXTEND THE DEADLINE FOR FILING OBJECTIONS TO SPS'S 1ST RFI
445 8/6/1993 STATE OF TEXAS PL MOTION TO DECLARE EXISTING RATES UNREASONABLE AND SUBJECT TO REFUND IN THE FINAL ORDER
446 8/10/1993 SPS RFI RESPONSE TO GC'S 64TH RFI
447 8/10/1993 SPS RFI RESPONSE TO GC'S 65TH RFI
448 8/10/1993 SPS RFI RESPONSE TO STATE OF TX'S 4TH RFI
449 8/10/1993 SPS RFI RESPONSE TO STATE OF TX'S 5TH RFI
450 8/10/1993 ASARCO PL OBJECTIONS TO SPS' 2ND RFI
451 8/11/1993 SPS PL LETTER TO GOLDEN SPREAD ELECTRIC COOP RE : AGREEMENT TO EXTEND THE DEADLINE FOR FILING OBJECTIONS TO SPS'S 2ND RFI
452 8/11/1993 SPS PL LETTER TO THE CANADIAN RIVER MUN WATER AUTHORITY RE : AGREEMENT TO EXTEND THE DEADLINE FOR FILING OBJECTIONS TO SPS'S 1ST RFI UNTIL 8/13/93
453 8/11/1993 SPS PL LETTER TO THE CITY OF AMARILLO RE : AGREEMENT REGARDING SPS'S 1ST RFI
454 8/11/1993 SPS PL LETTER TO THE STATE OF TX RE : EXTENSION OF THE DEADLINE FOR OBJECTION TO SPS'S 1ST RFI
455 8/11/1993 SPS PL LETTER TO MR CHAPMAN RE : EXTENSION OF DEADLINE FOR FILING OBJECTIONS TO SPS'S 1TS RFI UNTIL 8/12/93
456 8/11/1993 SPS PL LETTER TO GC RE : EXTENSION OF DEADLINE FOR FILING OBJECTIONS TO SPS' 1ST RFI UNTIL 8/12/93
457 8/11/1993 CITY OF AMARILLO PL LIST OF CONTESTED ISSSES
458 8/11/1993 GOLDEN SPREAD ELECTRIC COOP PL LETTER TO JUDGE HAMILTON RE : AGREEMENT TO EXTEND CERTAIN DISCOVERY DEADLINES
459 8/12/1993 STATE OF TX PL LETTER TO JUDGE HAMILTON AND EXAMINER POMERLEAU RE : EXTENSION OF THE DEADLINE TO OBJECTIONS TO ASARCO'S 1ST RFI
460 8/12/1993 SPS PL LETTER TO GC CONFIRMING AGREEMENT TO EXTEND THE DEADLINE FOR FILING OBJECTIONS TO 2ND RFI
461 8/13/1993 SPS PL LETTER TO THE STATE OF TX RE : AGREEMENT REGARDING DISCOVERY
462 8/13/1993 SPS PL LETTER TO GC RE : AGREEMENT REGARDING DISCOVERY
463 8/13/1993 SPS PL LETTER TO CRMWA RE : AGREEMENT REGARDING DISCOVERY
464 8/13/1993 SPS PL LETTER TO TIEC RE : AGREEMENT REGARDING DISCOVERY
465 8/13/1993 CANADIAN RIVER MUN WATER AUTH PL LIST OF CONTESTED ISSUES
466 8/13/1993 GC PL LETTER TO SPS RE : EXTENSION TO THE DEADLINE TO FILE OBJECTIONS TO SPS'S 2ND RFI
467 8/13/1993 SPS PL RESPONSE TO STATE OF TX'S MOTION TO DECLARE EXISTING RATES UNREASONABLE AND SUBJECT TO REFUND IN THE FINAL ORDER
468 8/13/1993 GOLDEN SPREAD ELECTRIC COOP PL NOTICE OF WITHDRAWAL
469 8/13/1993 CITY OF AMARILLO PL MOTION FOR PROTECTIVE ORDER, OR ALTERNATIVELY, OBJECTIONS TO RFI
470 8/13/1993 ASARCO PL LETTER TO SPS RE : DISCOVERY DISPUTES
471 8/16/1993 TIEC RFI RESPONSE TO SPS'S 1ST RFI
472 8/16/1993 CANADIAN RIVER MUN WATER AUTH RFI RESPONSE TO SPS'S 1ST RFI
473 8/16/1993 CITIES RFI RESPONSE TO SPS' 1ST RFI
474 8/16/1993 STATE OF TX RFI RESPONSES TO SPS'S 1ST RFI
475 8/16/1993 ASARCO RFI RESPONSE TO SOUTHWESTERN PUBLIC SERVICE COMPANY 1ST RFI
476 8/17/1993 STATE OF TEXAS PL REPLY TO SPS' RESPONSE TO THE STATE'S MOTION TO DECLARE EXISTING RATES UNREASONABLE AND SUBJECT TO REFUND IN THE FINAL ORDER
477 8/19/1993 GC RFI RESPONSE TO SPS'S 1ST RFI
478 8/19/1993 ASARCO RFI RESPONSE TO SPS'S 2ND RFI
479 8/19/1993 SPS RFI RESPONSE TO SPS'S 1ST RFI
480 8/19/1993 ASARCO PL LETTER TO SPS RE : AGREEMENTS CONCERNING ALL OUTSTANDING DISCOVERY DISPUTES
481 8/19/1993 TIEC PL LETTER TO ALL PARTIES OF RECORD RE : REQUEST FOR A COPY OF RESPONSES TO RFIS
482 8/19/1993 TIEC RFI RESPONSE TO SPS' 2ND RFI
483 8/19/1993 HEARINGS PL ORDER #17 : ORDER DIRECTING GC TO RELY TO MOTION TO DECLARE EXISTING RATES UNREASONABLE & SUBJECT TO REFUND IN THE FINAL ORDER
484 8/19/1993 TIEC PL SEQUENCE OF WITNESSES
485 8/20/1993 GC PL OBJECTIONS TO SPS'S 2ND RFI
486 8/20/1993 GC PL LETTER FROM SPS CONFIRMING THE AGREEMENTS REGARDING THE 2ND AND 4TH RFI
487 8/20/1993 ENERGAS RFI RESPONSE TO SPS'S 1ST RFI
488 8/20/1993 TIEC RFI 1ST SUPPLEMENTAL RESPONSE TO SPS'S 1ST RFI
489 8/20/1993 HEARINGS PL ORDER #18 : PROCEDURAL MATTERS IN CONNECTION WITH HEARING ON THE MERITS
490 8/20/1993 CITIES RFI RESPONSE TO ASARCO'S 1ST RFI
491 8/20/1993 CITIES RFI RESPONSE TO SPS' 2ND AND 3RD RFI
492 8/20/1993 STATE OF TEXAS RFI RESPONSE TO ASARCO'S 1ST RFI
493 8/20/1993 ASARCO PL LETTER TO THE CITY OF AMARILLO RE : AGREEMENT TO EXTEND THE TIME FOR ASARCO TO FILE A MOTION TO COMPEL
494 8/23/1993 CITIES TEST RATE CASE EXPENSE TESTIMONY AND EXHIBITS OF JACOB POUS
495 8/23/1993 CITIES PL REQUEST FOR RATE CASE EXPENSES
496 8/23/1993 CITIES RFI 5TH SUPPLEMENTAL RESPONSE TO CITIES 5TH RFI
497 8/23/1993 SPS RFI REFILED RFI'S
498 8/23/1993 SPS TEST SUPPLEMENTAL TESIMONY - RATE CASE EXPENSE
499 8/23/1993 SPS RFI 3RD SUPPLEMENTAL RESPONSE TO CITIES 10TH RFI
500 8/23/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO CITIES 2ND RFI
501 8/23/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO TIEC'S 4TH RFI
502 8/23/1993 GC RFI RESPONSE TO SPS'S 3RD RFI
503 8/23/1993 GC RFI RESPONSE TO SPS'S 2ND RFI
504 8/23/1993 SPS RFI 5TH SUPPLEMENTAL RESPONSE TO GC'S 5TH RFI
505 8/24/1993 SPS RFI RESPONSE TO ASARCO'S 10TH RFI
506 8/24/1993 SPS RFI RESPONSE TO STATE OF TX'S 6TH RFI
507 8/24/1993 SPS RFI RESPONSE TO GC'S 56TH RFI
508 8/24/1993 SPS CONF CONFIDENTIAL MATERIALS RELATING TO 10TH RFI EXHIBIT (ASARCO10.12)
509 8/24/1993 TIEC RFI RESPONSE TO ASARCO'S 1ST RFI
510 8/24/1993 GC PL REPLY TO THE STATE OF TX'S MOTION TO DECLARE EXISTING RATES UNREASONABLE AND SUBJECT TO REFUND
511 8/24/1993 SPS PL SUPPLEMENTAL RESPONSE TO OPPOSITION TO STATE'S MOTION TO DECLARE EXISTING RATES UNREASONABLE AND SUBJECT TO REFUND
512 8/24/1993 SPS PL 2ND REVISED SEQUENCE OF WITNESSES
513 8/24/1993 SPS TEST REBUTTAL TESTIMONY - 4 VOLUMES
514 8/24/1993 GC TEST RATE DESIGN SUPPLEMENTAL TESTIMONY OF STEPHEN BENENSON
515 8/24/1993 GC TEST RATE DESIGN SUPPLEMENTAL TESTIMONY OF DEBBIE WITBECK
516 8/24/1993 GC PL MOTION TO ALLOW SUPPLEMENTAL TESTIMONY
517 8/24/1993 GC TEST ERRATA TO THE DIRECT PREFILED TESTIMONY OF STACIE FOREMAN COLLINS
518 8/24/1993 GC TEST ERRATA TO THE TESTIMONY OF STEPHEN BENENSON
519 8/24/1993 GC TEST ERRATA TO THE DIRECT PREFILED TESTIMONY OF DARRYL TIETJEN
520 8/24/1993 GC TEST ERRATA TO THE DIRECT TESTIMONY OF EVAN ROWE
521 8/24/1993 GC TEST ERRATA TO THE TESTIMONY OF DEBBIE WITBECK
522 8/24/1993 GC TEST ERRATA TO THE DIRECT TESTIMONY OF GLENDA SPENCE
523 8/24/1993 GC TEST ERRATA TO THE DIRECT TESTIMONY OF RICHARD BACHMEIER
524 8/24/1993 GC TEST ERRATA TO THE DIRECT TESTIMONY OF DANIELLE JAUSSAUD
525 8/24/1993 GC TEST ERRATA TO THE DIRECT TESTIMONY OF ISAAC NWOKOGBA
526 8/24/1993 GC RFI RESPONSE TO ASARCO'S 1ST RFI
527 8/24/1993 GC RFI RESPONSE TO SPS' 4TH RFI
528 8/24/1993 ASARCO PL LETTER TO JUDGE HAMILTON AND EXAMINER POMERLEAU RE : THE UNAVAILABLITY OF WITNESSES
529 8/25/1993 ASARCO PL MOTION TO COMPEL CITIES RESPONSE TO RFIS
530 8/26/1993 SPS PL THIRD REVISED SEQUENCE OF WITNESSES.
531 8/26/1993 SPS PL MOTION FOR ENTRY OF AN ORDER COMPELLING DISCOVERY FROM GC.
532 8/27/1993 STATE OF TEXAS PL RESPONSE
533 8/27/1993 SPS PL LETTER TO THE ALJ FROM MR. SHACKELFORD, REGARDING RESPONSES.
534 8/27/1993 CITIES RFI 16TH RFI TO SPS
535 8/27/1993 SPS PL LETTER FROM MS. KROGER TO MR. GALLOWAY, REGARDING CERTIFICATIONS OF AGREEMENT.
536 8/27/1993 ASARCO PL LETTER TO JUDGE HAMILTON AND EXAMINER POMERLEAU RE : STATE'S MOTION TO DECLARE EXISTING RATES UNREASONABLE AND SUBJECT TO REFUND...
537 8/30/1993 GC PL RESPONSE TO SPS' MOTION FOR ENTRY OF AN ORDER COMPELLING DISCOVERY FROM GC
538 8/30/1993 CITIES RFI 17TH RFI TO SPS
539 8/30/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO STATE'S 6TH RFI
540 8/30/1993 SPS RFI 1ST SUPPLEMENTAL RESPONSE TO ASARCO'S 10TH RFI
541 8/30/1993 SPS PL LETTER TO JUDGES RE : THE UNAVAILABLITY OF WITNESSES
542 8/30/1993 SENATOR MONTFORD PL LETTER TO JUDGE HAMILTON AND EXAMINER POMERLEAU RE : COMMENTS
543 8/30/1993 SPS PL LIST OF PERSONS AGREEING TO BE BOUND BY PROTECTIVE ORDER
544 8/31/1993 CITIES RFI 18TH RFI TO SPS
545 8/31/1993 CITIES PL LETTER TO THE COMMISSION RE : COMPUTED DISC AS REQUESTED BY ASARCO IN RFI #1-12...
546 8/31/1993 STATE OF TX RFI 9TH RFI TO SPS
547 8/31/1993 SPS PL 4TH REVISED SEQUENCE OF WITNESSES
548 8/31/1993 CITIES PL 1ST SUPPLEMENTAL MOTION TO INTERVENE
549 8/31/1993 CITIES PL MOTION TO STRIKE PORTIONS OF REBUTTAL TESTIMONY
550 8/31/1993 GC PL REQUEST FOR CLARIFICATION OF EXAMINER'S ORDER #15 ON IN THE ALTERNATIVE REQUEST FOR EXTENSION OF TIME
551 8/31/1993 ASARCO RFI 11TH RFI TO SPS
552 8/31/1993 ASARCO PL MOTION TO STRIKE PREFILED REBUTTAL TESTIMONY OF GERALD J DILLER
553 8/31/1993 GC PL MOTION TO STRIKE REBUTTAL TESTIMONY FILED BY SPS
554 8/31/1993 GC RFI 67TH RFI TO SPS #DW-489 THRU DW-495 (REV REQ)
555 9/1/1993 ASARCO PL LETTER TO JUDGE HAMILTON AND EXAMINER POMERLEAU RE : DISPUTE WITH CITIES OVER 1ST RFI #1-12
556 9/1/1993 GC PL LETTER TO JUDGE HAMITLON & EXAMINER POMERLEAU RE : REQUEST THAT HEARING BE CONTINUED...
557 9/2/1993 TIEC PL LIST OF PARTICIPATING
558 9/2/1993 HEARINGS PL EXAMINER'S ORDER #19
559 9/3/1993 GC RFI 68TH RFI TO SPS #DW-496 THRU DW-527 (RATE CASE EXPENSE PHASE)
560 9/3/1993 SPS PL 5TH REVISED SEQUENCE OF WITNESSES AND DESIGNATION OF TESTIMONY BY PHASE
561 9/7/1993 ENERGAS PL LETTER TO HEARINGS OFFICERS RE : NOTICE OF WITNESS CONFLICT
562 9/7/1993 CITIES PL DESIGNATION OF TESTIMONY AS TO PHASE OF CASE
563 9/7/1993 CITIES PL REVISED SEQUENCE OF WITNESSES
564 9/7/1993 CITIES PL REPLY TO ASARCO'S MOTION TO COMPEL
565 9/8/1993 SPS PL RESPONSE TO CITIES MOTION TO STRIKE PORTIONS OF REBUTTAL TESTIMONY
566 9/8/1993 SPS PL RESPONSE TO GC'S MOTION TO STRIKE REBUTTAL TESTIMONY
567 9/8/1993 SPS PL RESPONSE TO ASARCO'S MOTION TO STRIKE PREFILED REBUTTAL TESTIMONY OF GERALD J MILLER
568 9/8/1993 HEARINGS PL ORDER #20 : RECONVENING HEARING
569 9/10/1993 STATE OF TEXAS PL NOTICE OF APPEAL OF EXAMINER'S ORAL RULING DENYING THE STATE OF TX'S MOTION TO DEEM SPS' RATE UNREASONABLE
570 9/13/1993 HEARINGS PL LETTER TO ALL PARTIES OF RECORD RE : THE COMMISSIONERS HAVE VOTED TO ADD THE APPEAL TO THE 9/14/93 FINAL ORDER AGENDA
571 9/16/1993 SPS PL RESPONSE TO STATE'S APPEAL OF ORAL RULING
572 9/17/1993 HEARINGS PL ORDER EXTENDING TIME FOR RULING ON STATE'S APPEAL OF ALJ'S ORAL RULING
573 9/23/1993 GC PL MEMORANDUM, REGARDING A LETTER FROM MR. W. MILNES
574 9/23/1993 KENNEDY PL TRANSCRIPT - HOM, 10:00AM, TUESDAY, 31ST OF AUGUST
575 9/23/1993 KENNEDY PL TRANSCRIPT - HOM, 10:00AM, TUESDAY, 7TH OF SEPTEMBER
576 9/23/1993 KENNEDY PL TRANSCRIPT - HOM, 10:00AM, MONDAY, 13TH OF SEPTEMBER 1993.
577 9/23/1993 KENNEDY PL TRANSCRIPT - HOM, 9:00AM, WEDNEDAY, 15TH OF SEPTEMBER 1993.
578 9/23/1993 KENNEDY PL TRANSCRIPT - HOM, 9:00AM, FRIDAY, 17TH OF SEPTEMBER 1993.
579 9/23/1993 SPS PL JOINT PETITION FOR INTERIM RATES
580 9/23/1993 SPS PL REVISED TARIFFS
581 9/23/1993 GC PL UNANIMOUS JOINT STIPULATION
582 9/28/1993 HEARINGS PL ORDER #20 : ORDER GRANTING INTERIM RATES
583 10/1/1993 STATE OF TEXAS PL REQUEST FOR EXTENSION TO THE TIME TO RULE ON STATE'S APPEAL OF THE EXAMINER'S ORAL RULING CURRENTLY SCHEDULED FOR THE 10/07/93
584 10/11/1993 HEARINGS PL ORDER EXTENDING TIME FOR RULING ON STATE'S APPEAL OF ALJ'S ORAL RULING
585 10/18/1993 HEARINGS PL ORDER #22 : ORDER REQUIRING SCHEDULES IN SUPPORT OF THE STIPULATION
586 10/22/1993 GC PL LETTER TO EXAMINER POMERLEAU RE : EMERGENCY JOINT MOTION FOR CLARIFICATION OF PORTIONS OF THE EXAMINER'S ORDER #22
587 10/25/1993 HEARINGS PL ORDER #23: MODIFICATION OF ORDER #22
588 10/28/1993 GC PL FILES ON BEHALF OF SOUTHWESTERN PUBLIC SERVICE COMPANY WORK PLAN FOR ACCOMPLISHING DSM TASKS IN ACCORDANCE WITH SETTLEMENT AGREEMENT
589 10/28/1993 GC PL SUBMISSION OF SCHEDULES IN SUPPORT OF UNANIMOUS JOINT STIPULATION PURSUANT TO EXAMINER'S ORDER #23.
590 10/29/1993 HEARINGS PL ORDER #24 : REQUIRING CLARIFICATION OF STIPULATION
591 11/3/1993 GC PL STAFF COMMENTS REGARDING THE WORK PLAN FOR ACCOMPLISHING DSM TASKS
592 11/5/1993 SPS PL RESPONSE TO EXAMINER'S ORDER #24
593 11/5/1993 ASARCO PL RESPONSE TO EXAMINER'S ORDER #24 REQUIRING CLARIFICATION OF THE STIPULATION
594 11/5/1993 HEARINGS PL ORDER #25 : ORDER ADMITTING DOCUMENTS INTO EVIDENCE
595 11/10/1993 SPS PL OBJECTIONS IN RESPONSE TO EXAMINER'S ORDER #25
596 11/10/1993 GC PL OBJECTIONS TO SPS' RESPONSE TO EXAMINER'S ORDER #24 REQUIRING CLARIFICATION
597 11/15/1993 SPS PL RESPONSE TO GC'S OBJECTIONS TO SPS' RESPONSE TO EXAMINER'S ORDER #24
598 11/15/1993 GC PL CONCURENCE WITH SPS' POSITION REGARDING EXAMINER'S ORDER #24
599 11/22/1993 HEARINGS PL ORDER #26 : ORDER DESIGNATING RECORD EVIDENCE
600 11/24/1993 HEARINGS PL PROPOSED FINAL ORDER
601 11/30/1993 GC PL CONCURRENCE WITH SPS EXCEPTION TO PARAGRAPH 7 OF EXAMINER'S ORDER #26
602 11/30/1993 SPS PL EXCEPTION TO PARAGRAPH 7 OF THE EXAMINERS ORDER #26
603 12/2/1993 GC & SPS PL JOINT MOTION FOR CORRECTION OF EXAMINER'S REPORT AND PROPOSED ORDER
604 12/2/1993 SPS PL EXCEPTIONS TO THE EXAMINER'S REPORT AND PROPOSED FINAL ORDER
605 12/6/1993 SPS PL REQUEST FOR ORAL ARGUMENT
606 12/7/1993 HEARINGS PL LETTER TO ALL PARTIES OF RECORD RE; THE COMMISSIONERS HAVE VOTED TO ADD THIS APPEAL OF ORDER #26 THE 12/16/93 FINAL ORDER MEETING AGENDA
607 12/20/1993 HEARINGS PL FINAL ORDER
608 12/20/1993 ]HEARINGS PL ORDER DENYING APPEAL OF ORDER #26
609 1/6/1994 HEARINGS PL LETTER TO SOUTHWESTERN PUBLIC SERVICE CO. FROM MS. POMERLEAU RE: TARIFF SHEET IV-145
610 1/10/1994 SPS PL LETTER TO EXAMINER POMERLEAU RE : RESPONSE TO 1/6/94 MEMO CONCERNING DISPOSITION
611 1/14/1994 SPS PL TARIFFS
612 2/25/1996 HEARINGS PL SERVICE LIST
613 2/25/1996 HEARINGS PL SUBMISSION FORM NOTICE OF OPEN MEETING PREHEARING CONFERENCE 10/30/92 10:00 AM.
614 2/25/1996 HEARINGS PL SUBMISSION FORM NOTICE OF OPEN MEETING HEARING ON THE MERITS 08/31/93 10:00 AM.
615 9/2/1994 SPS PL LETTER TO JUDGE DAVIS RE : PROTECTED MATERIALS
616 10/24/1994 SPS PL DISKETTE CONTAINING THE 3RD QUARTER OF 1994 STATE ACCOUNTS WHICH SPS IS AWARE PER SECTION 3(e), BILLING REPORTS TO THE STATE OF THE UNANIMOUS JOINT ST
617 11/7/1994 RI INTERNATINOAL PL SUPPORT LETTER
618 5/17/1996 LEGAL ADMIN PL FILE PURGED
619 7/3/2014 CENTRAL RECORDS PL BOOK FILE