Filings for 56822
Case Style INVESTIGATION OF EMERGENCY PREPAREDNESS AND RESPONSE BY UTILITIES IN HOUSTON AND SURROUNDING COMMUNITIES
198 filing(s).
Item | File Stamp | Party | Item Type | Filing Description |
---|---|---|---|---|
1 | 7/15/2024 | PUC COMPLIANCE & ENFORCEMENT | PRJ | CONTROL NUMBER REQUEST |
2 | 7/15/2024 | PUC EXECUTIVE DIRECTOR | LTRS | Memo opening investigation with Governor Abbott's letter attached |
3 | 7/22/2024 | PUC EXECUTIVE DIRECTOR | LTRS | Investigation scoping memo |
4 | 7/24/2024 | Mayor John Whitmire | LTRS | Hurricane Beryl Letter |
5 | 7/25/2024 | PUC EXECUTIVE DIRECTOR | LTRS | Response Letter Mayor Whitmire Hurricane Beryl Response |
6 | 7/29/2024 | PUC EXECUTIVE DIRECTOR | LTRS | Investigation documentation memo |
7 | 7/29/2024 | PUC INFRASTRUCTURE | PRJ | AEP Texas Inc. Vegetation Management Reports - 2013 to Present |
8 | 7/29/2024 | PUC INFRASTRUCTURE | PRJ | CenterPoint Energy Houston Electric, LLC Vegetation Management Reports - 2013 to Present |
9 | 7/29/2024 | PUC INFRASTRUCTURE | PRJ | Entergy Texas, Inc. Vegetation Management Reports - 2013 to Present |
10 | 7/29/2024 | PUC INFRASTRUCTURE | PRJ | Texas-New Mexico Power Company Vegetation Management Reports - 2013 to Present |
11 | 7/29/2024 | PUC INFRASTRUCTURE | PRJ | Electric Utility Distribution System Spending and Reliability Report - 2013 to 2022 |
12 | 7/30/2024 | PUC INFRASTRUCTURE | PRJ | AEP Texas Inc. - Emergency Operations Plan |
13 | 7/30/2024 | PUC INFRASTRUCTURE | PRJ | CenterPoint Energy Houston Electric - Emergency Operations Plan |
14 | 7/30/2024 | PUC INFRASTRUCTURE | PRJ | Entergy Texas, Inc. - Emergency Operations Plan |
15 | 7/30/2024 | PUC INFRASTRUCTURE | PRJ | Texas-New Mexico Power Company - Emergency Operations Plan |
16 | 7/31/2024 | PUC INFRASTRUCTURE | PRJ | AEP Texas Inc. Storm Hardening Plan Summary - 2022 to Present |
17 | 7/31/2024 | PUC INFRASTRUCTURE | PRJ | CenterPoint Energy Houston Electric, LLC Storm Hardening Plan Summary - 2022 to Present |
18 | 7/31/2024 | PUC INFRASTRUCTURE | PRJ | Entergy Texas, Inc. Storm Hardening Plan Summary - 2020 to Present |
19 | 7/31/2024 | PUC INFRASTRUCTURE | PRJ | Texas-New Mexico Power Company Storm Hardening Plan Summary - 2020 to Present |
20 | 7/31/2024 | PUC CENTRAL RECORDS | PL | VOID. SEE ITEM 25. |
21 | 7/31/2024 | PUC CENTRAL RECORDS | CONF | VOID. SEE ITEM 25. |
22 | 7/31/2024 | PUC CENTRAL RECORDS | CONF | VOID. SEE ITEM 25. |
23 | 7/31/2024 | PUC CENTRAL RECORDS | CONF | VOID. SEE ITEM 25. |
24 | 7/31/2024 | PUC CENTRAL RECORDS | CONF | VOID. SEE ITEM 25. |
25 | 8/1/2024 | PUC CENTRAL RECORDS | LTRS | VOID MEMO |
26 | 8/2/2024 | PUC EXECUTIVE DIRECTOR | LTRS | CenterPoint Energy's response to Governor Abbott's July 16th letter |
27 | 8/2/2024 | PUC EXECUTIVE DIRECTOR | RFI | COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO COMMUNITY CENTERS AND ORGANIZATIONS |
28 | 8/2/2024 | PUC EXECUTIVE DIRECTOR | RFI | COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO LOCAL GOVERNMENTS |
29 | 8/2/2024 | PUC EXECUTIVE DIRECTOR | RFI | COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO POWER GENERATION COMPANIES |
30 | 8/2/2024 | PUC EXECUTIVE DIRECTOR | RFI | COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO TRADE ASSOCIATIONS |
31 | 8/2/2024 | PUC EXECUTIVE DIRECTOR | RFI | COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO RETAIL ELECTRIC PROVIDERS |
32 | 8/2/2024 | PUC EXECUTIVE DIRECTOR | RFI | COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO MEDICAL AND ELDERCARE FACILITIES |
33 | 8/8/2024 | City of Taylor Lake Village | PRJ | TLV response to Project 56822 |
34 | 8/12/2024 | PUC COMPLIANCE & ENFORCEMENT | RFI | COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC |
35 | 8/12/2024 | PUC COMPLIANCE & ENFORCEMENT | RFI | COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO AEP TEXAS, INC. |
36 | 8/12/2024 | PUC COMPLIANCE & ENFORCEMENT | RFI | COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO TEXAS-NEW MEXICO POWER COMPANY |
37 | 8/12/2024 | PUC COMPLIANCE & ENFORCEMENT | RFI | COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO ENTERGY TEXAS, INC. |
38 | 8/12/2024 | PUC COMPLIANCE & ENFORCEMENT | RFI | COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO TARGETED ELECRIC COOPS |
39 | 8/12/2024 | PUC COMPLIANCE & ENFORCEMENT | RFI | COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO TARGETED ELECTRIC MOUS |
40 | 8/12/2024 | PUC COMPLIANCE & ENFORCEMENT | RFI | COMMISSION STAFF’S FIRST REQUST FOR INFORMATION TO TARGETED WATER OR SEWER UTILITIES |
41 | 8/12/2024 | PUC COMPLIANCE & ENFORCEMENT | RFI | COMMISSION STAFF’S FIRST REQUST FOR INFORMATION TO TARGETED TELECOMMUNICATION UTILITIES |
42 | 8/19/2024 | PUC COMPLIANCE & ENFORCEMENT | RFI | Commission Staff's First Request for Information to Oncor Electric Delivery Company, LLC |
43 | 8/26/2024 | CITY OF JASPER | PRJ | City of Jasper PUCT First Request Investigation after Hurricane Beryl |
44 | 8/26/2024 | WOODLAND HILLS WATER , LLC | RFI | Responses to PUC 1st RFI |
45 | 8/27/2024 | CITY OF LIVINGSTON | PRJ | City of Livingston PUCT First Request Investigation after Hurricane Beryl |
46 | 8/27/2024 | CITY OF LIVINGSTON | PRJ | City of Livingston PUCT First Request Investigation after Hurricane Beryl Amended 8-27-24 |
47 | 8/27/2024 | City of College Station | PRJ | College Station's Project 56822 Filing |
48 | 8/27/2024 | CITY OF BRENHAM | RFI | PUCT RFI - MOU Response |
49 | 8/27/2024 | CITY OF BRENHAM | CONF | VOID SEE ITEM 169 |
50 | 8/27/2024 | CITY OF CUERO | RFI | PUCT RFI - MOU Response |
51 | 8/27/2024 | CITY OF FLATONIA | RFI | PUCT RFI - MOU Response |
52 | 8/27/2024 | CITY OF GIDDINGS | RFI | PUCT RFI - MOU Response |
53 | 8/27/2024 | CITY OF LA GRANGE | RFI | PUCT RFI - MOU Response |
54 | 8/27/2024 | CITY OF LEXINGTON | PRJ | PUCT RFI - MOU Response |
55 | 8/27/2024 | CITY OF MOULTON | RFI | PUCT RFI - MOU Response |
56 | 8/27/2024 | CITY OF SCHULENBURG | PRJ | PUCT RFI - MOU Response |
57 | 8/27/2024 | CITY OF SHINER | RFI | PUCT RFI - MOU Response |
58 | 8/27/2024 | CITY OF WEIMAR | RFI | PUCT RFI - MOU Response |
59 | 8/28/2024 | CITY OF HILLSHIRE VILLAGE | RFI | City of Hillshire Village's Response to Commission Staff's First Request for Information |
60 | 8/28/2024 | CITY OF TIMPSON | PRJ | PUCT RFI - MOU Response |
61 | 8/28/2024 | NAVARRO COUNTY ELECTRIC COOPERATIVE, INC. | RFI | Response to commission staff first request for information to targeted electric cooperatives |
62 | 8/28/2024 | Karnes Electric Cooperative, Inc. | PL | Karnes Electric Cooperative's Response to Commission Staff's First Request for Information to Karnes Electric Cooperative Question Nos. Staff 1-1 Through 1-120 |
63 | 8/28/2024 | CITY OF HALLETTSVILLE | PRJ | Responses to Docket / Project Number 56822 and MESA agreement and Mutual Aid agreement with the county that are referenced in our responses |
64 | 8/29/2024 | MSEC ENTERPRISES, INC. | RFI | MSEC Enterprises, Inc and MSEC Wastewater, Inc.'s Response to Commission Staff's First Request for Information |
65 | 8/29/2024 | WHARTON COUNTY ELECTRIC COOPERATIVE, INC. | PRJ | PUCT RFI - Co-op Response |
66 | 8/29/2024 | WHARTON COUNTY ELECTRIC COOPERATIVE, INC. | PRJ | PUCT RFI - Co-op Response Part 2 |
67 | 8/29/2024 | CIty of Caldwell | RFI | City of Caldwell's First Request for Information to Targeted Electric MOUS |
68 | 8/29/2024 | Bartlett Electric Cooperative | RFI | PUCT RFI response Project No. 56822 |
69 | 8/29/2024 | Heart of Texas Electric Cooperative, Inc. | RFI | Heart of Texas Electric Cooperative's Response to Commission Staff's First Request for Information |
70 | 8/29/2024 | MEDINA ELECTRIC COOPERATIVE, INC. | PRJ | MEDINA ELECTRIC COOPERATIVE’S RESPONSE TO COMMISSION STAFF’S FIRST REQUEST FOR INFORMATION TO TARGETED ELECTRIC CO-OPS QUESTION NOS. STAFF 1-1 THROUGH 1-120 |
71 | 8/29/2024 | HOUSTON COUNTY ELECTRIC COOPERATIVE, INC. | RFI | Houston County Electric Cooperative's Response to Staff's First Request for Information |
72 | 8/29/2024 | WHARTON COUNTY ELECTRIC COOPERATIVE, INC. | PRJ | PUCT RFI - Co-op Response Part 3 |
73 | 8/29/2024 | ENGIE RESOURCES LLC | PRJ | Responses to Investigation of Emergency Preparedness by Utilities in Houston and Surrounding Communities |
74 | 8/29/2024 | HEN INFRASTRUCTURE, L.L.C. | RFI | HEN Infrastructure, LLC Response to Commission Staff's Request for Information |
75 | 8/29/2024 | SAN PATRICIO ELECTRIC COOPERATIVE INC | PRJ | PUCT RFI - Co-op Response |
76 | 8/29/2024 | CITY OF YOAKUM | PRJ | PUCT RFI - MOU Response |
77 | 8/29/2024 | Texas Assisted Living Association | RFI | TALAComments_PUC_HurricaneBeryl_RFI |
78 | 8/30/2024 | LAMAR COUNTY ELECTRIC COOPERATIVE, INC. | RFI | PUCT Project #56822 Responses to First Request for Information |
79 | 8/30/2024 | BRYAN TEXAS UTILITIES | RFI | Bryan Texas Utilities Response to Staff First RFIs |
80 | 8/30/2024 | BRYAN TEXAS UTILITIES | CONF | BTU's Confidential Attachments to Staff 1-11, 1-12, and 1-13 |
81 | 8/30/2024 | Piney Point Village | PRJ | PROJECT NO. 56822 COMMISSION STAFF'S FIRST REQUEST FOR INFORMATION TO LOCAL GOVERNMENTS QUESTION NOS. LG 1-1 THROUGH 1-19 |
82 | 8/30/2024 | VICTORIA ELECTRIC COOPERATIVE, INC. | PRJ | PUCT RFI - Co-op Response |
83 | 8/30/2024 | CITY OF BELLVILLE | PRJ | PUCT RFI - MOU Response |
84 | 8/30/2024 | NEXTERA WATER TEXAS, LLC | RFI | NextEra Water Texas, LLC's Response to Commission Staff's First Request for Information. |
85 | 8/30/2024 | PANOLA-HARRISON ELECTRIC COOPERATIVE, INC. | RFI | Panola-Harrison Electric Cooperative, Inc.'s Response to Staff's First Request for Information |
86 | 8/30/2024 | NEXTERA WATER TEXAS, LLC | CONF | NextEra Water Texas, LLC's CONFIDENTIAL Exhibit Attachments in Response to Commission Staff's First Request for Information. |
87 | 8/30/2024 | CITY OF ROBSTOWN | PRJ | PUCT RFI - MOU Response |
88 | 8/30/2024 | FAYETTE ELECTRIC COOPERATIVE, INC | PRJ | PUCT RFI - Co-op Response |
89 | 8/30/2024 | MID-SOUTH ELECTRIC COOPERATIVE ASSOCIATION | RFI | MidSouth Electric Cooperative's Response to Staff's First Request for Information |
90 | 8/30/2024 | TRINITY VALLEY ELECTRIC COOPERATIVE INC. | RFI | TVEC's Responses to Staff's First RFIs |
91 | 8/30/2024 | TRINITY VALLEY ELECTRIC COOPERATIVE INC. | CONF | TVEC's Confidential Attachment to Staff 1-30 |
92 | 8/30/2024 | SAN BERNARD ELECTRIC COOPERATIVE, INC | PRJ | San Bernard Electric Cooperative's Response To Commission Staff's First Request for Information. |
93 | 8/30/2024 | Sam Houston Electric Cooperative, Inc. | RFI | Sam Houston Electric Cooperative's Responses to Staff's First RFI |
94 | 8/30/2024 | SAM HOUSTON ELECTRIC COOPERATIVE, INC | CONF | SHEC's Confidential Attachments to Staff 1-12, 1-43, 1-76, and 1-94 |
95 | 8/30/2024 | NRG ENERGY, INC. | PRJ | NRG Energy, Inc.'s Response to Commission Staff's First Request for Information to Power Generation Companies |
96 | 8/30/2024 | CSWR TEXAS UTILITY OPERATING COMPANY, LLC | PL | 56822 CSWR-Texas Response to Staff 1st RFI |
97 | 8/30/2024 | AEP TEXAS INC. | RFI | AEP TEXAS INC. RESPONSE TO COMMISSION STAFF'S FIRST REQUEST FOR INFORMATION. |
98 | 8/30/2024 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | RFI | CenterPoint Energy Houston Electric, LLC’s Response to the Public Utility Commission of Texas First Requests for Information |
99 | 8/30/2024 | BLUEBONNET ELECTRIC COOPERATIVE, INC. | MISC | BBEC Response to Staff's 1st RFI PUBLIC |
100 | 8/30/2024 | BLUEBONNET ELECTRIC COOPERATIVE, INC. | CONF | CONFIDENTIAL PAGES TO BBEC Response to Staff's 1st RFI |
101 | 8/30/2024 | Texas Restaurant Association | PRJ | Response to Project No. 56822 from the Texas Restaurant Association |
102 | 8/30/2024 | GUADALUPE VALLEY ELECTRIC COOPERATIVE, INC | MISC | GVEC Response to Staff's 1st RFIs PUBLIC |
103 | 8/30/2024 | GUADALUPE VALLEY ELECTRIC COOPERATIVE, INC | CONF | CONFIDENTIAL PAGES FROM GVEC Response to Staff's 1st RFIs |
104 | 8/30/2024 | CHAMPION ENERGY SERVICES LLC | CONF | Champion Energy Services, LLC and Calpine Energy Solutions, LLC's Confidential Responses to PUCT RFI re Customer Outages During Beryl and May 2024 Derecho |
105 | 8/30/2024 | Texas Water Utilities, L.P. and Corix Utilities (Texas) Inc. | RFI | Response to Staff’s First RFI to Water Utilities |
106 | 8/30/2024 | AEP TEXAS INC. | CONF | HIGHLY SENSITIVE RESPONSES TO COMMISSION STAFF'S FIRST REQUEST FOR INFORMATION |
107 | 8/30/2024 | ALLIANCE FOR RETAIL MARKETS | MISC | Alliance for Retail Markets' Response to Commission Staff's First Request for Information to Retail Electric Providers |
108 | 8/30/2024 | City of Friendswood | RFI | Response to RFI |
109 | 8/30/2024 | CITY OF SAN AUGUSTINE | PRJ | PUCT RFI - MOU Response |
110 | 8/30/2024 | CHEROKEE COUNTY ELECTRIC COOPERATIVE ASSOCIATION | RFI | Cherokee County Electric Cooperative Association's Response to Staff's First Request for Information |
111 | 8/30/2024 | NRG Energy, Inc. Family of REPs | RFI | Response to Commission Staff's First Requests for Information of the NRG Energy, Inc. Family of REPs |
112 | 8/30/2024 | AT&T | RFI | AT&T’s Response to Commission Staff’s First Request for Information |
113 | 8/30/2024 | ENTERGY TEXAS, INC. | RFI | ETI's Responses to Staff's 1st RFI_Questions 1 Through 55 |
114 | 8/30/2024 | Texas Water Utilities, L.P. and Corix Utilities (Texas) Inc. | CONF | Attachment Staff 1-7b |
115 | 8/30/2024 | AT&T | CONF | AT&T’s Response to Commission Staff’s First Request for Information |
116 | 8/30/2024 | ENTERGY TEXAS, INC. | CONF | ETI's HSPM Responses to Staff's First RFI_Att. 12 & 43 |
117 | 8/30/2024 | VISTRA CORP. | PRJ | Vistra PGCs Response to DICE RFIs Emergency Preparedness Utilities |
118 | 8/30/2024 | Texas Water Utilities, L.P. and Corix Utilities (Texas) Inc. | CONF | Attachment Staff 1-7a (Part 1) |
119 | 8/30/2024 | VISTRA CORP. | PRJ | Vistra REP Retail RFI Responses to DICE Emergency Preparedness Utilities |
120 | 8/30/2024 | CITY OF HOUSTON | RFI | City of Houston response to Commission staff's first request for information to local governments, for Project Number 56822. |
121 | 8/30/2024 | Texas Water Utilities, L.P. and Corix Utilities (Texas) Inc. | CONF | 56822 CONF Attachment Staff 1-7a Parts 2-3 |
122 | 8/30/2024 | Texas Water Utilities, L.P. and Corix Utilities (Texas) Inc. | CONF | Attachment Staff 1-7b - Part 4 |
123 | 8/30/2024 | NAVASOTA VALLEY ELECTRIC CO-OP | PRJ | Navasota Valley Electric Cooperative, Inc.'s Response to Commission Staff's First Request for Information to Targeted Electric Co-ops |
124 | 8/30/2024 | MAGIC VALLEY ELECTRIC COOPERATIVE, INC. | PRJ | PUCT RFI - Co-op Response |
125 | 8/30/2024 | CITY OF KIRBYVILLE | PRJ | VOID: SEE ITEM 176 |
126 | 8/30/2024 | NUECES ELECTRIC COOPERATIVE, INC. | PRJ | Project 56822- Nueces Electric Cooperative, Inc.- RFI Response |
127 | 8/30/2024 | TEXAS ENERGY ASSOCIATION FOR MARKETERS | RFI | Response to 1st RFI to Trade Assn. |
128 | 8/30/2024 | QUADVEST LP | PL | VOID SEE ITEM 132 |
129 | 8/30/2024 | Aggregated REP Group | RFI | Response to 1st RFI to REPS |
130 | 8/30/2024 | RIO GRANDE ELECTRIC COOPERATIVE INC. | PRJ | PUCT RFI - Co-op Response |
131 | 8/30/2024 | QUADVEST LP | PL | Quadvest LP's Response to Staff's 1st RFIs to Utilities |
132 | 8/30/2024 | QUADVEST LP | PL | Letter regarding filing error |
133 | 8/30/2024 | QUADVEST LP | CONF | Confidential Exhibit D to Quadvest Response to Staff 1st RFIs |
134 | 8/30/2024 | JACKSON ELECTRIC COOPERATIVE, INC. | PRJ | PUCT RFI - Co-op Response |
135 | 8/30/2024 | TEXAS-NEW MEXICO POWER COMPANY | RFI | Texas-New Mexico Power Company’s Responses to Staff’s First Request for Information |
136 | 8/30/2024 | ENTERGY TEXAS, INC. | RFI | ETI's Responses to Staff's First RFI_Questions 56 Through 120 |
137 | 8/30/2024 | AQUA TEXAS | RFI | 56822 Aqua Texas Response to Staff 1st RFI |
138 | 8/30/2024 | CITY OF HEMPSTEAD | PRJ | PUCT RFI - MOU Response |
139 | 9/3/2024 | TEXAS-NEW MEXICO POWER COMPANY | CONF | Texas-New Mexico Power Company’s Confidential Attachments in Response to Staff’s First Request for Information |
140 | 9/3/2024 | ENTERGY TEXAS, INC. | CONF | ETI's HSPM Responses to Staff's First RFI_66, 72, 76 and 86 |
141 | 9/3/2024 | AQUA TEXAS | CONF | 56822 Aqua Texas CONFIDENTIAL Attachment to Response to Staff 1st RFI |
142 | 9/3/2024 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | CONF | CenterPoint Energy Houston Electric, LLC’s Response to the Public Utility Commission of Texas First Requests for Information - CONFIDENTIAL |
143 | 9/4/2024 | RUSK COUNTY ELECTRIC COOPERATIVE, INC. | PRJ | VOID SEE ITEM 159 |
144 | 9/4/2024 | WOOD COUNTY ELECTRIC COOPERATIVE, INC. | RFI | Wood County Electric Cooperative, Inc.'s Response to Staff's First Request for Information |
145 | 9/4/2024 | JASPER NEWTON ELECTRIC COOPERATIVE, INC. | RFI | Jasper-Newton Electric Cooperative, Inc.'s Response to Staff's First Request for Information |
146 | 9/4/2024 | BOWIE-CASS ELECTRIC COOPERATIVE, INC. | PRJ | BCEC responses to Project 56822 RFI's for Hurricane Beryl. |
147 | 9/4/2024 | UNDINE DEVELOPMENT, LLC | RFI | VOID SEE ITEM 149 |
148 | 9/5/2024 | UNDINE DEVELOPMENT LLC | CONF | VOID SEE ITEM 149 |
149 | 9/5/2024 | UNDINE, LLC | LTRS | Undine, LLC Letter to Central Records to Void Item Nos. 147 and 148 |
150 | 9/5/2024 | Undine, LLC | RFI | Undine, LLC's Response to Staff's First Request for Information |
151 | 9/5/2024 | Undine, LLC | CONF | CONFIDENTIAL Attachment Staff 1-4 - Undine Electric Accounts and System Addresses CONFIDENTIAL Attachment Staff 1-7(a) CONFIDENTIAL Attachment Staff 1-7(b) - H2O Innovation Inc.'s (H2O Innovation) Hurricane Preparedness Plan |
152 | 9/5/2024 | DEEP EAST TEXAS ELECTRIC COOPERATIVE INC. | RFI | Deep East Texas Electric Cooperative, Inc.'s Response to Staff's First Request for Information |
153 | 9/5/2024 | PUC EXECUTIVE DIRECTOR | PRJ | Investigation Status Update Memo |
154 | 9/6/2024 | CITY OF LIBERTY | PRJ | City of Liberty PUCT First Request Investigation after Hurricane Beryl |
155 | 9/6/2024 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | RFI | CenterPoint Energy Houston Electric, LLC Response to Public Utility Commission of Texas Request for Information 1-97 |
156 | 9/6/2024 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | RFI | Attached roadmap to responses filed on August 30, 2024, to the Requests for Information issued by Staff |
157 | 9/6/2024 | UPSHUR RURAL ELECTRIC COOPERATIVE CORPORATION | REG | URECC Response to Staff's 1st RFIs PUBLIC |
158 | 9/6/2024 | UPSHUR RURAL ELECTRIC COOPERATIVE CORPORATION | CONF | CONFIDENTIAL PAGES FROM URECC Response to Staff's 1st RFIs |
159 | 9/6/2024 | RUSK COUNTY ELECTRIC COOPERATIVE, INC. | CONF | Rusk County Electric Cooperative, Inc Response to Project 56822 |
160 | 9/6/2024 | ONCOR ELECTRIC DELIVERY COMPANY LLC | RFI | RESPONSE OF ONCOR ELECTRIC DELIVERY COMPANY LLC TO COMMISSION STAFF'S FIRST REQUEST FOR INFORMATION |
161 | 9/6/2024 | ONCOR ELECTRIC DELIVERY COMPANY LLC | CONF | CONFIDENTIAL ONCOR'S RESPONSE TO STAFF RFI SET NO. 1, QUESTION NO. 1-79 |
162 | 9/6/2024 | ONCOR ELECTRIC DELIVERY COMPANY LLC | CONF | CONFIDENTIAL ONCOR'S RESPONSE TO STAFF RFI SET NO. 1, QUESTION NO. 1-105 |
163 | 9/6/2024 | ONCOR ELECTRIC DELIVERY COMPANY LLC | CONF | CONFIDENTIAL ONCOR'S RESPONSE TO STAFF RFI SET NO. 1, QUESTION NO. 1-107 |
164 | 9/6/2024 | BROWNSVILLE PUBLIC UTILITIES BOARD | RFI | Brownsville Public Utilities Board Project No. 56822 RFI.pdf |
165 | 9/6/2024 | TEXAS-NEW MEXICO POWER COMPANY | RFI | Texas-New Mexico Power Company’s Supplemental Responses to Commission Staff’s First Request for Information |
166 | 9/9/2024 | TEXAS-NEW MEXICO POWER COMPANY | CONF | Texas-New Mexico Power Company’s Supplemental Documents in Response to Staff 1-23 |
167 | 9/9/2024 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | CONF | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC CONFIDENTIAL RESPONSE TO REQUEST FOR INFORMATION 1-97 |
168 | 9/16/2024 | CITY OF NEWTON | RFI | responses to Staff's Targeted MOU RFIs |
169 | 9/16/2024 | CITY OF BRENHAM | PRJ | VOID: SEE ITEM 175 |
170 | 9/17/2024 | CHAMPION ENERGY SERVICES LLC | MISC | Champion and Solutions' Responses to PUCT RFIs re Hurricane Beryl and Derecho |
171 | 9/17/2024 | CITY OF HEMPHILL | COM | The City of Hemphill's answers to the "RFIs to Electric MOUs" document concerning Hurricane Beryl. |
172 | 9/18/2024 | TEXAS-NEW MEXICO POWER CO | MISC | Texas-New Mexico Power Company’s Supplemental Responses to Commission Staff’s First Request for Information |
173 | 9/19/2024 | CITY OF BRENHAM | PRJ | PUCT RFI - MOU Response |
174 | 9/19/2024 | CITY OF BRENHAM | CONF | PUCT RFI - MOU Response |
175 | 9/19/2024 | CITY OF BRENHAM | PRJ | PUCT RFI - MOU Response |
176 | 9/20/2024 | CITY OF KIRBYVILLE | PRJ | PUCT RFI - MOU Response |
177 | 9/20/2024 | CENTERPOINT ENERGY HOUSTON ELECTRIC | PL | CenterPoint Energy Houston Electric, LLC Confidentiality Statement and Redacted Documents |
178 | 9/23/2024 | Astound Broadband | PRJ | Astound Broadband's Response to Staff's First Request for Information |
179 | 9/23/2024 | ENTERGY TEXAS, INC. | LTRS | ETI's Letter Regarding Commission Staff's First RFI |
180 | 9/24/2024 | UTILITIES INVESTMENT CO., INC. | CONF | PUCT RFI Response |
181 | 9/24/2024 | LIBERTY COUNTY UTILITIES, LLC | CONF | PUCT RFI Response |
182 | 9/24/2024 | JOHNSTON WATER UTILITY LLC | CONF | PUCT RFI Response |
183 | 9/24/2024 | SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORP. | RFI | Southwest Arkansas Electric Cooperative Corporation's Responses To Commission Staff's First Request for Information To Targeted Electric Coops Question Nos. Staff 1-1 through 1-120 |
184 | 9/24/2024 | T& W WATER SERVICE dba BLUE TOPAZ UTILITIES | CONF | PROJECT 56822 - INVESTIGATION OF EMERGENCY PREPAREDNESS AND RESPONSE |
185 | 9/25/2024 | UTILITIES INVESTMENT CO., INC. DBA RANCH CREST WATER COMPANY | CONF | PUCT RFI Response |
186 | 9/25/2024 | Spectrum | RFI | Response to Commission Staff’s First Request for Information |
187 | 9/25/2024 | Spectrum | CONF | Confidential Attachments to Response to Commission Staff’s First Request for Information |
188 | 9/25/2024 | Nextlink Internet | MISC | Nextlink Internet Response To First RFI to Targeted Telecommunications Utilities |
189 | 9/26/2024 | AEP TEXAS INC. | RFI | SUPPLEMENTAL RESPONSE TO COMMISSION STAFFS’ 1-76 AND 1-86 |
190 | 9/27/2024 | UNDINE, LLC | RFI | Undine, LLC's Supplemental Response to Staff's First Request for Information |
191 | 9/27/2024 | ENCHANTED ROCK, LLC | PRJ | Enchanted Rock, LLC's Response to Commission Staff's First Request for Information to Power Generation Companies |
192 | 10/3/2024 | CENTERPOINT ENERGY HOUSTON ELECTRIC | PRJ | CenterPoint Energy Houston Electric PUCT Presentation |
193 | 10/4/2024 | MG Spoor Consulting LLC. and GridSky Strategies Inc. | PRJ | MG Spoor Consulting and GridSky Strategies PUC workshop presentation |
194 | 10/4/2024 | PUC EXECUTIVE DIRECTOR | PRJ | Sequence of events for October 5, 2024 workshop |
195 | 10/15/2024 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | RFI | CenterPoint Energy Houston Electric, LLC’s Response to the Public Utility Commission of Texas First Request for Information, PUC-RFI01-128S Supplemental |
196 | 10/25/2024 | CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC | RFI | CenterPoint Energy Houston Electric, LLC’s Response to the Public Utility Commission of Texas First Request for Information, PUC-RFI01-019S Supplemental |
197 | 11/19/2024 | PUC EXECUTIVE DIRECTOR | PRJ | Investigation Report Draft and Memo |
198 | 11/21/2024 | PUC EXECUTIVE DIRECTOR | PRJ | Final Report |
Export to Excel |