Item File Stamp Party Filing Description
190 12/3/2019 OPUC NOTICE OF CHANGE OF COUNSEL
315 3/17/2020 TIEC (REDACTED) TEXAS INDUSTRIAL ENERGY CONSUMERS’
176 11/8/2019 TIEC 10TH RFI TO SWEPCO
187 11/26/2019 TIEC 11TH RFI TO SWEPCO
188 12/2/2019 TEXAS INDUSTRIAL ENERGY CONSUMERS 12TH RFI TO SWEPCO
194 12/10/2019 TIEC 13TH RFI TO SWEPCO
210 1/8/2020 TEXAS INDUSTRIAL ENERGY CONSUMERS 14TH RFI TO SWEPCO
268 2/18/2020 TIEC 17TH RFI TO SWEPCO
89 9/16/2019 OPUC 1ST RFI TO SOUTHWESTERN ELECTRIC POWER COMPANY
23 7/24/2019 TIEC 1ST RFI TO SWEPCO
242 1/21/2020 SWEPCO 1ST RFI TO TIEC
63 8/29/2019 CITIES ADVOCATING REASONABLE DEREGULATIONS 1ST SET OF RFI TO SWEPCO
274 2/21/2020 TIEC 2ND ERATTA TO THE DIRECT TESTIMONY AND EXHIBITS OF JEFFRY POLLOCK
25 7/25/2019 TIEC 2ND REQUEST FOR INFORMATION TO SWEPCO
104 9/19/2019 PUC LEGAL 2ND RFI TO SOUTHWESTERN ELECTRIC POWER COMPANY QUESTION NOS. STAFF 2-1 THROUGH 2-3
193 12/9/2019 GOLDEN SPREAD ELECTRIC COOPERATIVE, INC. 2ND RFI TO SWEPCO
108 9/23/2019 CITIES ADVOCATING REASONABLE DEREGULATION 2ND SET OF RFI TO SOUTHWESTERN ELECTRIC POWER COMPANY
269 2/18/2020 TIEC 2ND SUPPLEMENTAL RESPONSE TO SOUTHWESTERN ELECTRIC POWER COMPANY'S 1ST RFI
247 1/28/2020 GOLDEN SPREAD ELECTRIC COOPERATIVE INC. 3RD RFI TO SOUTHWESTERN ELECTRIC POWER CO.
195 12/11/2019 OPUC 3RD RFI TO SOUTHWESTERN ELECTRIC POWER COMPANY
109 9/23/2019 CITIES ADVOCATING REASONABLE DEREGULATION 3RD RFI TO SOUTHWESTERN ELECTRIC POWER COMPANY
264 2/18/2020 CITIES ADVOCATING REASONABLE DEREGULATION 4TH RFI TO SOUTHWESTERN ELECTRIC POWER COMPANY
90 9/16/2019 TIEC 4TH RFI TO SWEPCO
101 9/18/2019 TIEC 5TH RFI TO SWEPCO
121 10/2/2019 TIEC 6TH RFI TO SWEPCO
123 10/3/2019 TIEC 7TH RFI TO SWEPCO
133 10/11/2019 TIEC 8TH RFI TO SWEPCO
157 10/24/2019 TIEC 9TH RFI TO SWEPCO
179 11/13/2019 SWEPCO AMENDED RESPONSE TO TIEC'S RFI, QUESTION 4-7
1 7/15/2019 SOUTHWESTERN ELECTRIC POWER COMPANY APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR CERTIFICATE OF CONVENIENCE AND NECESSITY AUTHORIZATION AND RELATED RELIEF FOR THE ACQUISITION OF WIND GENERATION FACILITIES
309 3/17/2020 CITIES ADVOCATING REASONABLE DEREGULATION CARD`s Reply Post-Hearing Closing Brief
341 6/18/2020 CITIES ADVOCATING REASONABLE DEREGULATION CARD`s Reply to Exceptions to the Proposal for Decision
62 8/29/2019 PUC LEGAL COMMISSION STAF'S LIST OF ISSUES
51 8/19/2019 PUC LEGAL COMMISSION STAFF'S FIRST RFI TO SOUTHWESTERN ELECTRIC POWER COMPANY (SWEPCO) QUESTION NOS. STAFF 1 - 1 THROUGH 1 - 7
319 3/19/2020 PUC LEGAL COMMISSION STAFF'S PROPOSED FINDINGS OF FACT AND CONCLUSIONS OF LAW
29 7/31/2019 PUC LEGAL COMMISSION STAFF'S RECOMMENDATION ON THE SUFFICIENCY OF THE APPLICATION, NOTICE AND REQUEST FOR HEARING
191 12/3/2019 PUC LEGAL COMMISSION STAFF'S THIRD REQUEST FOR INFORMATION TO SOUTHWESTERN ELECTRIC POWER COMPANY (SWEPCO) QUESTION NOS STAFF 3-1 THROUGH 3-9
311 3/17/2020 PUC LEGAL COMMISSION STAFF`S REPLY BRIEF
83 9/11/2019 PUC OPDM COMMISSIONER MEMO
141 10/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENITIAL -HIGHLY SENSITIVE RESPONSE TO CITIES ADVOCATING REASONABLE DEREGULATIONS SECOND RFI Q CARD 2-10 ATTACHMENT 1 THROUGH ATTACHMENT 3
142 10/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENITIAL-CONFIDENTIAL RESPONE TO CITITES ADVOCATING RESAONABLE DEREGUALTIONS' 2ND RFI.Q.CARD 2-4 ATTACHMENT 1 AND ATTACHMENT 2 (USB) BATE STAMP- USB
143 10/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENITIAL-HIGHLY SENSITIVE RESPONSE TO CITITES ADVOCATING REASONABLE DEREGULATIONS' 2ND RFI.Q. CARD 2-9 ATTACHMENT 1 (USB) BATE STAMP- USB
185 11/26/2019 EAST TEXAS ELECTRIC COOPERATIVE INC. AND NORTHEAST ELECTRIC COOPERATIVE INC. CONFIDENTIAL - 2ND REQUEST FOR INFORMATION TO SWEPCO, QUESTION 2-6
182 11/22/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL - SOUTHWESTERN ELECTRIC POWER COMPANY'S CONFIDENTIAL SUPPLEMENTAL RESPONSE TO TEXAS INDUSTRIAL ENERGY CONSUMERS' SEVENTH REQUEST FOR INFORMATION Q. TIEC 7-14, ATTACHMENT 2 BATE STAMP - 1 TO 6
67 8/29/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL - SOUTHWESTERN ELECTRIC POWER COMPANY'S CONFIDENTIAL SUPPLEMENTAL RESPONSE TO TIEC FIRST RFI. Q. TIEC 1 - 19 ATTACHMENT 4 AND ATTACHMENT 7 (FLASH DRIVES); BATE STAMP: 00001 TO 00001
71 9/3/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL - SOUTHWESTERN ELECTRIC POWER COMPANY'S HIGHLY SENSITIVE RESPONSE TO EAST TEXAS ELECTRIC COOPERATIVE INC & NORTHEAST TEXAS ELECTRIC COOPERATIVE INC'S FIRST RFI. Q. ETEC/NTEC 1-1 AND 1 - 22; BATE STAMP: 00001- 000002
127 10/7/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL – SOUTHWESTERN ELECTRIC POWER COMPANY’S HIGHLY SENSITIVE RESPONSE TO TIEC’S 4TH RFI Q. TIEC 4-4 ATTACHMENT 1; BATE STAMP FLASH DRIVE
24 7/24/2019 AEP TEXAS INC CONFIDENTIAL- COMPREHENSIVE CONFIDENTIAL WORKPAPAERS TO THE DIRECT TESTIMONY OF JOHN F. TORPEY (FLASHDRVIE) BATE STAMP- 1 TO 1
261 2/14/2020 TIEC CONFIDENTIAL- CONFIDENITAL PORTION OF TIEC'S 16TH SIXTEENTH RFI TO SWEPCO BATE STAMP- 1 TO 2
282 2/24/2020 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- CONFIDENTIAL REPONSE TO CARD'S 4TH RFI.Q. CARD 4-1 ATTACHMENT 1 BATE STAMP- 1 TO 40
155 10/23/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- CONFIDENTIAL REPONSE TO TIEC'S 7TH RFI.Q. TIEC 7-3, ATTACHMENT 1 AND Q. 7-18, ATTACHMENT 1 BATE STAMP- 1 TO 25
284 2/24/2020 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- CONFIDENTIAL RESPONSE TO TIEC S 16TH RFI. Q. TIEC 16-4, TIEC 16-6, TIEC 16-7, TIEC 16-8 AN TIEC 16-18 BATE STAMP- 1 TO 5
278 2/21/2020 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- CONFIDENTIAL RESPONSE TO TIEC'S 16TH RFI. Q. TIEC 16-31, ATTACHMENT 1 (FLASDRIVE) BATE STAMP- USB
167 10/30/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- CONFIDENTIAL SUPPLEMENTAL RESPONSE TO TIECS' 7TH RFI.Q. TIEC 7-17, ATTACHMENT 2 BATE STAMP- 1 TO 2
14 7/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- CONFIDENTIAL WORKPAPERS TO THE DIRECT TESTIMONY OF JOEL J. MULTER JOHNANNES P. PFEIFENBERGER, AKARRSH SHEILENDRANATH, AND JOHN F. TORPEY (USB) BATE STAMP- 1 TO 1
224 1/14/2020 EAST TEXAS ELECTRIC COOPERATIVE, INC. / NORTHEAST TEXAS ELECTRIC COOPERATIVE, INC. CONFIDENTIAL- DIRECT TESTIMONY AND EXHIBITS OD JAMES E. STRIEDEL ON BELHALF OF EAST TEXAS ELECTRIC COOPERATIVE INC., AND NORTHEAST ELECTRIC COOPERATIVE, INC. BATE STAMP- 13 TO 13
132 10/10/2019 SOUTHWSTERN ELECTRIC POWER COMPANYS CONFIDENTIAL- FIRST RFI Q IBEW 1-2 ATTACHMENTS; FLASHDRIVE
308 3/13/2020 KENNEDY REPORTING SERVICE CONFIDENTIAL- HEARING ON THE MERITS FEBRUARY 25,2020; BATE STAMP 528-532
129 10/8/2019 SOUTHWESTEN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSITIVE RESPONSE TO TEXAS INDUSTRIAL ENERGY CONSUMERS' 5TH RFI.Q. TIEC 5-2, ATTACHMENT 1 THROUGH ATTACHMENT 3 (FLSHDRIVE) BATE STAMP- 1 TO 1
212 1/8/2020 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSITIVE RESPONSE TO TIEC FIFTH RFI Q.TIEC 5-2 ATTACHMENT 4; BATE STAMP 1-2
204 12/19/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSITIVE 2ND SUPPLEMENTAL RESPONSE TO TIEC'S 5TH RFI. Q. TIEC 5-2 ATTACHEMENT 1- ATTACHMENT 3 BATE STAMP- USB
256 2/12/2020 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSITIVE REBUTTAL TESTIMONY OF KARL R BLETZACKER, PAGES 20 AND 21; BATE STAMP 1-2
103 9/18/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSITIVE REPONSE TO CITIES ADVOCATING REASONABLE DEREGULATIONS' 1DT RFI Q. CARD 1-1 ATTACHMENT 1, AND Q. CARD 1-15 ATTACHMENT 1. BATE STAMP- 1 TO 16
93 9/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSITIVE RESPONSE TO TIEC'S 3RD RFI. Q. TIEC 3-2 BATE STAMP- USB
92 9/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSITIVE RESPONSE TO TIEC'S 3RD RFI. Q. TIEC 3-3 ATTACHEMNT 3 AND ATTACHMENT 4 BATE STAMP- USB
169 10/31/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSITIVE RESPONSE TO TIEC'S 8TH RFI.Q. TIEC 8-1, ATTACHMENT 1 BATE STAMP- 1 TO 1
200 12/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSITIVE SWEPCO`S RESPONSE TO ETEC/NTEC`S 2ND RFI (FLASH DRIVE) BATE STAMP 1-1
13 7/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSITIVE WORKPAPERS TO THE DIRECT TESTIMONY OF JAY F. GODFREY (USB) BATE STAMP- 1 TO 1
257 2/12/2020 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSITIVE WORKPAPERS TO THE REBUTTAL TESTIMONY OF KARL R BLETZACKER, FLASHDRIVE
145 10/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSITVE RESPONSE TO GOLDEN SPREAD ELECTRIC POWER COOPERATIVE, INC.'S 1ST RFI.Q. GSEC 1-31 ATTACHMENT 1 BATE STAMP- 1 TO 1
162 10/28/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSITVE SUPPLEMENTAL RESPONSE TO TIEC'S 5TH RFI.Q. TIEC 5-2, ATTACHMENT 1 AND ATTACHEMENT 3 (USB) BATE STAMP- 1 TO 1
75 9/9/2019 SOUTHWESTERN ELECTRIC COMPANY CONFIDENTIAL- HIGHLY SENSTIVE RESPONSE TO COMMISSIION STAFF'S 1ST RFI.Q. STAFF 1-1 ATTACHMENT 1 BATE STAMP- 1 TO 2
229 1/14/2020 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSTIVE RESPONSE TO TIEC'13TH RFI. Q TIEC 13-1 ATTACHMENT 1 THROUGH ATTACHMENT 3 BATE STAMP- 1 TO 356
272 2/20/2020 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSTIVE SUPPLEMENTL RESPONSE TO TIEC'S 15TH RFI. Q. TIEC 15-5, ATTACHMENT 1 AND ATTACHMENT 2; AND Q. TIEC 15-7, ATTACHMENT1 . BATE STAMP- 1 TO 23
271 2/20/2020 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENSTIVE SUPPLEMENTL RESPONSE TO TIEC'S 2ND RFI. Q. TIEC 2-23, ATTACHMENT 6 THROUGH ATTACHMENT 8. BATE STAMP- 1 TO 23
279 2/21/2020 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- HIGHLY SENTIVE RESPONSE TO TIEC'S 16TH RFI. Q. 16-6 ATTACHMENT 1 AND ATTACHMENT 2 BATE STAMP- 1 TO 205
218 1/14/2020 TIEC CONFIDENTIAL- HSPM PORTION OF THE DIRECT TESTIMONY AND EXHIBITS OF CHARLES S. GRIFFEY BATE STAMP- 1-5; CD
216 1/14/2020 TIEC CONFIDENTIAL- HSPM PORTION OF THE DIRECT TESTIMONY AND EXHIBITS OF JEFFRY C. POLLOCK BATE STAMP- 1 TO 2
328 3/26/2020 TIEC CONFIDENTIAL- HSPM PORTION OF TIEC'S DE-DESIGNATED INITIAL BRIEF BATE STAMP 1-3
317 3/19/2020 TIEC CONFIDENTIAL- HSPM PORTION OF TIEC'S REPLY BRIEF BATE STAMP 1-2
232 1/15/2020 TIEC CONFIDENTIAL- HSPM WORKPAPAERS TO THE DIRECT TESTIMONY AND EXHIBITS OF CHARLES S. GRIFFEY BATE STAMP- CD
234 1/15/2020 TIEC CONFIDENTIAL- HSPM WORKPAPERS TO THE DIRECT TESTIMONY AND EXHIBITS OF JEFFRY POLLOCK BATE STAMP - CD
297 3/9/2020 TIEC CONFIDENTIAL- HSPM'S PORTION OF TIEC'S INTITIAL BRIEF BATE STAMP- 1 TO 6
40 8/13/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- RESPONSE TO TIEC'S 1ST RFI Q. TIEC 1-3 ATTACHMENT 1.Q.ATTAHCMENT 4, AND Q. TIEC 1-19 ATTACHMENT S2 AND 5 (FD) BATE STAMP- 1 TO 1
39 8/13/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- RESPONSE TO TIEC'S 1ST RFI Q. TIEC 1-7 ATTACHMENT 1 BATE STAMP- 1 TO 6
173 11/5/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- RESPONSE TO TIEC'S 7TH RFI BATE STAMP- FLASH DRIVE
44 8/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- SOUTHWESTERN ELECTRIC COMPANY'S HIGHLY SENSITIVE RESPONS TO TIEC' 2ND RFI. Q. TIEC 2-13 ATTACHMENTS 1 AND 2 BATE STAMP- 1 TO 1
43 8/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- SOUTHWESTERN ELECTRIC POWER CO.' S RESPONSE TO TIEC'S 2ND RFI. Q. TIEC2-4 ATTACHMENT 1, Q. TIEC. TIEC 2-8 ATTACHMENT 1.Q.2-21 ATTACHMENT 1 ,2&3, Q. TIEC 2-22 ATTACHMENTS 1,2&3, Q. TIEC ATTACHMENT 3 ,4&5, AND TIEC 2-24 ATTACHMENT 1 (FD) BATE STAMP- 1 TO 1
125 10/7/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- SOUTHWESTERN ELECTRIC POWER COMPANY’S RESPONSE TO OPUC’S 1ST RFI Q. OPUC 1-8 ATTACHMENT 1; BATE STAMP FLASH DRIVE
160 10/25/2019 SWEPCO CONFIDENTIAL- SUBSTITUTED HIGHLY SENSITIVE EXHIBIT JFG-3; AND REDLINE AGAINST ORIGINAL MAVERICK PSA (2 FLASHDRIVES) BATE STAMP- FLASHDRIVES
120 9/30/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- SUPPLEMENTAL RESPONSE TO TIEC'S 2ND RFI. Q. TIEC- 2-4 ATTACHMENT 2 BATE STAMP- 1 TO 29
201 12/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- SWEPCO`S RESPONSE TO ETEC/NTEC`S 2ND RFI (FLASH DRIVE) BATE STAMP 1-1
86 9/12/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL- VOLUMINOUS HIGHLY SENSITIVE CONFIDENTIAL EXHIBIT JFG-3 TO DIRECT TESTIMONY OF JAY F. GODFREYBATE STAMP- 1 TO 1
238 1/15/2020 EAST TEXAS ELECTRIC COOPERARTIVE INC. CONFIDENTIAL- WORKPAPERS TO THE DIRECT TESTIMONY AND EXHIBITS OF JAMES STRIEDELON BEHALF OF EAST TEXAS ELECTRIC COOPERATIVE , INC. AND NORTH TEXAS ELECTRIC COOPERATIVE , INC.
239 1/15/2020 AND NORTH TEXAS COOPERATIVE ELECTRIC COOPERATIVE , INC. CONFIDENTIAL- WORKPAPERS TO THE DIRECT TESTIMONY AND EXHIBITS OF JAMES STRIEDELON BEHALF OF EAST TEXAS ELECTRIC COOPERATIVE , INC. AND NORTH TEXAS ELECTRIC COOPERATIVE , INC. BATESTAMP USB
3 7/15/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL-CONFIDENTIAL TESTIMONY EXHIBIT NKH-2 AND EXHIBIT NKH-3; BATE STAMP 1-15
255 2/12/2020 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL-HIGHLY SENSISTIVE EXHIBIT JGD-1R TO THE REBUTTAL TESTIMONY OF JOSEPH G DERUNTZ
2 7/15/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL-HIGHLY SENSITIVE TESTIMONY EXHIBIT JFG-2 AND EXHIBIT JFG-5; BATE STAMP 1-3
78 9/10/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL-SUPPLEMENTAL RESPONSE TO TIEC 1ST RFI; BATE STAMP 1-1 (FLASH DRIVE)
198 12/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY CONFIDENTIAL-SWEPCO`S RESPONSE TO TIEC`S 11TH RFI (FLASH DRIVE) BATE STAMP 1-1
159 10/25/2019 SWEPCO COVER LETTER FOR CONFIDENTIAL FILING
219 1/14/2020 CITIES ADVOCATING REASONABLE DEREGULATION Direct Testimony and Attachments of Scott Norwood on Behalf of Cities Advocating Reasonable Deregulation
226 1/14/2020 EAST TEXAS ELECTRIC COOPERATIVE, INC. / NORTHEAST TEXAS ELECTRIC COOPERATIVE, INC. Direct Testimony and Exhibits of James W. Daniel on Behalf of East Texas Electric Cooperative, Inc. and Northeast Texas Electric Cooperative, Inc.
227 1/14/2020 EAST TEXAS ELECTRIC COOPERATIVE, INC. / NORTHEAST TEXAS ELECTRIC COOPERATIVE, INC. Direct Testimony and Exhibits of John W. Chiles on Behalf of East Texas Electric Cooperative, Inc. and Northeast Texas Electric Cooperative, Inc.
230 1/15/2020 WALMART INC. Direct Testimony and Exhibits of Lisa V. Perry on Behalf of Walmart Inc.
244 1/22/2020 PUC LEGAL DIRECT TESTIMONY AND WORKPAPERS OF RUTH STARK
73 9/5/2019 PUC OPDM DRAFT PRELIMINARY ORDER WITH MEMO
110 9/23/2019 CITIES ADVOCATING REASONABLE DEREGULATION DUPLICATE. REFER TO ITEM #109
27 7/26/2019 ETEC-NTEC East Texas Electric Cooperative & Northeast Texas Electric Cooperative`s Protective Order Certifications
322 3/19/2020 EAST TEXAS ELECTRIC COOPERATIVE, INC. AND NORTH TEXAS ELECTRIC COOPERATIVE, INC. East Texas Electric Cooperative, Inc. and North Texas Electric Cooperative, Inc.`s Limited Proposed Findings of Fact and Conclusions of Law
314 3/17/2020 EAST TEXAS ELECTRIC COOPERATIVE, INC. AND NORTH TEXAS ELECTRIC COOPERATIVE, INC. East Texas Electric Cooperative, Inc. and North Texas Electric Cooperative, Inc.`s Reply Brief
253 2/3/2020 TIEC ERRATA
252 2/3/2020 TIEC ERRATA
316 3/18/2020 TIEC ERRATA TO TIEC`S REDACTED REPLY BRIEF
235 1/15/2020 CITIES ADVOCATING REASONABLE DEREGULATIONS ERRTA TO THE DIRECT TESTIMONY OF SCOTT NORWOOD
37 8/13/2019 ETEC-NTEC ETEC-NTEC`s 1st Request For Information to SWEPCO
186 11/26/2019 ETEC-NTEC ETEC-NTEC`s 2nd RFI to SWEPCO-Redacted Version
338 6/11/2020 EAST TEXAS ELECTRIC COOPERATIVE, INC. /NORTHEAST TEXAS ELECTRIC COOPERATIVE, INC. ETEC/NTEC`s Exceptions to PFD
298 3/9/2020 EAST TEXAS ELECTRIC COOPERATIVE, INC. AND NORTH TEXAS ELECTRIC COOPERATIVE, INC. ETEC/NTEC`s Initial Brief
345 6/22/2020 PUC OPDM EX PARTE COMMUNICATIONS MEMO
346 6/23/2020 SOAH EXCEPTIONS MEMO
332 5/28/2020 PUC OPDM EXCEPTIONS MEMO
333 6/11/2020 GOLDEN SPREAD ELECTRIC COOPERATIVE EXCEPTIONS TO THE PROPOSAL FOR DECISION
337 6/11/2020 SOUTHWESTERN ELECTRIC POWER COMPANY Exceptions to the Proposal for Decision
355 6/29/2020 PUC OPDM EXPARTE COMMUNICATION TO CHAIRMAN
258 2/13/2020 TEXAS INDUSTRIAL ENERGY CONSUMERS FIFTEENTH RFI TO SWEPCO
48 8/16/2019 PUC OPDM FILED IN THE WRONG DOCKET NO., PLEASE SEE DOCKET NO. 49383, ITEM NO. 17
358 7/6/2020 PUC OPDM FINAL ORDER
265 2/18/2020 OPUC FOURTH RFI TO SOUTHWESTERN ELECTRIC POWER COMPANY
299 3/9/2020 GOLDEN SPREAD ELECTRIC COOPERATIVE Golden Spread Electric Cooperative, Inc.`s Initial Brief
318 3/19/2020 GOLDEN SPREAD ELECTRIC COOPERATIVE Golden Spread Electric Cooperative, Inc.`s Proposed Findings of Fact and Conclusions of Law
313 3/17/2020 GOLDEN SPREAD ELECTRIC COOPERATIVE Golden Spread Electric Cooperative, Inc.`s Reply Brief
111 9/23/2019 GOLDEN SPREAD ELECTRIC COOPERATIVE Golden Spread`s First Request for Information to SWEPCO
305 3/13/2020 KENNEDY REPORTING SERVICE HEARING ON THE MERITS- MONDAY, FEBRUARY 24, 2020
306 3/13/2020 KENNEDY REPORTING SERVICE HEARING ON THE MERITS- TUESDAY, FEBRUARY 25, 2020
307 3/13/2020 KENNEDY REPORTING SERVICE HEARING ON THE MERITS- WEDNESDAY, FEBRUARY 26, 2020
112 9/24/2019 IBEW 738 IBEW 738`s First Request for Information to SWEPCO
34 8/8/2019 INTERNATIONAL BROTHERHOOD OF ELECTRICAL WORKERS LOCAL UNION 738 IBEW 738`s Motion to Intervene
46 8/15/2019 IBEW 738 IBEW 738`s Protective Order Certifications
183 11/22/2019 SWEPCO INDEX FOR TIEC'S 7TH SET OF RFI
302 3/9/2020 SOUTHWESTERN ELECTRIC POWER COMPANY Initial Brief
304 3/12/2020 WALMART INC. Initial Post-Hearing Brief of Walmart Inc.
295 3/9/2020 CITIES ADVOCATING REASONABLE DEREGULATION INITIAL POST-HEARING CLOSING BRIEF
327 3/25/2020 PUC LEGAL JOINT MOTION OF COMMISSION STAFF AND TEXAS INDUSTRIAL ENERGY CONSUMERS FOR LEAVE TO FILE JOINT PROPOSED FINDINGS OF FACT AND CONCLUSIONS OF LAW
96 9/16/2019 PUC LEGAL JOINT PROPOSED PROCEDURAL SCHEDULE AND ARGUEMENT IN SUPPORT
357 6/30/2020 HENDERSON ECONOMIC DEVELOPMENT CORPORATION Letter in Support of SWEPCO Wind Project
4 7/16/2019 SOUTHWESTERN PUBLIC SERVICE COMPANY LETTER REGARDING DIRECT TESTIMONY WORKPAPERS
329 4/14/2020 SOUTHWESTERN ELECTRIC POWER COMPANY Letter to ALJs re LA settlement
354 6/29/2020 GOLDEN SPREAD ELECTRIC COOPERATIVE, INC. LETTER TO COMMISSIONERS
350 6/26/2020 TIEC LETTER TO COMMISSIONERS
352 6/26/2020 CITIES ADVOCATING REASONABLE DEREGULATION LETTER TO COMMISSIONERS
347 6/25/2020 SOUTHWESTERN ELECTRIC POWER COMPANY Letter to Commissioners re LPSC Approval
292 3/5/2020 TIEC LETTER TO JUDGE NEINASST AND SIANO
97 9/17/2019 TIEC LETTER TO JUDGE O'MALLEY AND SIANO
99 9/18/2019 SWEPCO LETTER TO JUDGE O'MALLEY AND SIANO
293 3/5/2020 SWEPCO LETTER TO JUDGES NEINAST AND SIANO
290 2/28/2020 TIEC LETTER TO JUDGES NEINAST AND SIANO
353 6/29/2020 TEXAS ASSOCIATION OF MANUFACTURERS Letter to the Texas PUC Chairman and Commissioners
64 8/29/2019 SOUTHWESTERN ELECTRIC POWER COMPANY LIST OF ISSUES
65 8/29/2019 CITIES ADVOCATING REASONABLE DEREGULATIONS LIST OF ISSUES
250 1/31/2020 TIEC LIST OF PARTICIPATING MEMBERS
105 9/20/2019 SOUTHWESTERN ELECTRIC POWER COMPANY MOTION FOR LIMITED RECONSIDERATION OF SOAH ORDER NO.2
289 2/28/2020 SOUTHWESTERN ELECTRIC POWER COMPANY Motion of SWEPCO for Admission of Additional Evidence Pursuant to Texas Rule of Evidence 106
79 9/10/2019 TIEC MOTION TO COMPEL SPS TO RESPOND TO TIEC'S 2ND RFI
18 7/22/2019 SOUTHWESTERN ELECTRIC POWER COMPANY MOTION TO EXTEND INTERVENTION DEADLINE
53 8/22/2019 GOLDEN SPREAD ELECTRIC COOPERATIVE, INC. MOTION TO INTERVENE
60 8/27/2019 CITIES ADVOCATING REASONABLE DEREGULATIONS MOTION TO INTERVENE
16 7/17/2019 OPUC MOTION TO INTERVENE
17 7/19/2019 TIEC MOTION TO INTERVENE
26 7/26/2019 EAST TEXAS ELECTRIC COOPERATIVE INC AND NORTHEAST TEXAS ELECTRIC COOPERATIVE INC. MOTION TO INTERVENE
72 9/5/2019 WALMART INC. Motion To intervene Of Walmart Inc.
323 3/23/2020 TIEC NOTICE OF AGREEMENT TO DE-DESIGNATE INFORMATION
192 12/9/2019 GOLDEN SPREAD ELECTRIC COOPERATIVE, INC. NOTICE OF CHANGE OF COUNSEL
158 10/25/2019 CITIES ADVOCATING REASONABLE DEREGULATION NOTICE OF CHANGE OF SERVICE ADDRESS
348 6/25/2020 SOUTHWESTERN ELECTRIC POWER COMPANY Notice of OM Participation
137 10/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY OBJECTIONS TO TEXAS INDUSTRIAL ENERGY CONSUMERS SEVENTH RFI
33 8/5/2019 SOUTHWESTERN ELECTRIC POWER COMPANY OBJECTIONS TO TIEC'S 2ND SET OF RFI
356 6/30/2020 PUC OPDM OPEN MEETING, JULY 2, 2020, ITEM NO. 22 APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY FOR CERTIFICATE OF CONVENIENCE
117 9/27/2019 OPUC OPUC'S 2ND RFI TO SWEPCO
220 1/14/2020 OPUC OPUC`s Direct Testimony and Workpapers of Karl Nalepa
335 6/11/2020 OPUC OPUC`S EXCEPTIONS TO THE PROPOSAL FOR DECISION
351 6/26/2020 OPUC OPUC`S NOTICE OF PARTICIPATION IN OPEN MEETING
300 3/9/2020 OPUC OPUC`s Post-Hearing Initial Brief
312 3/17/2020 OPUC OPUC`s Post-Hearing Reply Brief
321 3/19/2020 OPUC OPUC`S PROPOSED FINDINGS OF FACTS AND CONCLUSIONS OF LAW
342 6/18/2020 OPUC OPUC`S REPLY TO EXCEPTIONS TO THE PROPOSAL FOR DECISION
15 7/17/2019 PUC OPDM ORDER 1 WITH PROTECTIVE ORDER
30 8/1/2019 PUC OPDM ORDER NO. 4 FINDING APPLICATION AND NOTICE SUFFICIENT
20 7/23/2019 PUC OPDM ORDER NO.2- GRANTING MOTION AND EXTENDING DEADLINES
100 9/18/2019 PUC OPDM ORDER NO.2- GRANTING MOTIONS TO INTERVENE, ADOPTING PROCEDURAL SCHEDULE AND SETTING HEARING ON THE MERITS
28 7/29/2019 PUC OPDM ORDER NO.3- GRANTING MOTIONS TO INTERVENE
32 8/5/2019 PUC OPDM ORDER NO.5- GRANTING MOTION TO INTERVENE
47 8/16/2019 PUC OPDM ORDER NO.6- GRANTING MOTION TO INTERVENE
54 8/22/2019 PUC OPDM ORDER OF REFFERAL
85 9/12/2019 PUC OPDM OUTGOING COMMISSION SIGNED ORDER MAIL LOG
116 9/27/2019 KENNEDY REPORTING SERVICE PREHEARING CONFERENCE THURSDAY, SEPTEMBER 12, 2019 BATE STAMP 1 TO 21
84 9/12/2019 PUC OPDM PRELIMINARY ORDER
45 8/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY PRIVILEGE INDEX FOR TIEC'S 2ND RFI
178 11/8/2019 SOUTHWESTERN ELECTRIC POWER COMPANY PRIVILEGE INDEX FOR TIEC'S 7TH SET OF RFI
331 5/26/2020 SOAH PROPOSAL FOR DECISION WITH COVER LETTER AND SERVICE LIST
285 2/24/2020 SOUTHWESTERN ELECTRIC POWER COMPANY PROPOSED AGREED BRIEFING OUTLINE
263 2/18/2020 PUC LEGAL PROTECTIVE ORDER CERTIFICATION
196 12/16/2019 PUC LEGAL PROTECTIVE ORDER CERTIFICATION
41 8/14/2019 PUC LEGAL PROTECTIVE ORDER CERTIFICATION
21 7/23/2019 TIEC PROTECTIVE ORDER CERTIFICATION
22 7/24/2019 PUC LEGAL PROTECTIVE ORDER CERTIFICATIONS
31 8/5/2019 PUC LEGAL PROTECTIVE ORDER CERTIFICATIONS
35 8/12/2019 PUC LEGAL PROTECTIVE ORDER CERTIFICATIONS
36 8/12/2019 EAST TEXAS ELECTRIC COOPERATIVE INC AND NORTHEAST TEXAS ELECTRIC COOPERATIVE INC PROTECTIVE ORDER CERTIFICATIONS
19 7/22/2019 OPUC PROTECTIVE ORDER CERTIFICATIONS
59 8/27/2019 CITIES ADVOCATING REASONABLE DEREGULATIONS PROTECTIVE ORDER CERTIFICATIONS
57 8/26/2019 GOLDEN SPREAD ELECTRIC COOPERATIVE, INC. PROTECTIVE ORDER CERTIFICATIONS
76 9/10/2019 CITIES ADVOCATING REASONABLE DEREGULATIONS PROTECTIVE ORDER CERTIFICATIONS
149 10/22/2019 EAST TEXAS ELECTRIC COOPERATIVE, INC. AND NORTHEAST TEXAS ELECTRIC COOPERATIVE, INC. PROTECTIVE ORDER CERTIFICATIONS
150 10/23/2019 GOLDEN SPREAD ELECTRIC COOPERATIVE, INC. PROTECTIVE ORDER CERTIFICATIONS
223 1/14/2020 EAST TEXAS ELECTRIC COOPERATIVE, INC. / NORTHEAST TEXAS ELECTRIC COOPERATIVE, INC. Public Redacted Direct Testimony and Exhibits of James E. Striedel on Behalf of East Texas Electric Cooperative, Inc. and Northeast Texas Electric Cooperative, Inc.
231 1/15/2020 TIEC PUBLIC WORKPAPERS TO THE DIRECT TESTIMONY AND EXHIBITS OF CHARLES GRIFFEY
233 1/15/2020 TIEC PUBLIC WORKPAPERS TO THE DIRECT TESTIMONY AND EXHIBITS OF JEFFRY POLLOCK ON THE BELHAF OF TIEC
215 1/14/2020 TIEC PUBLIC- REDACTED VERSION DIRECT TESTIMONY AND EXHIBITS OF JEFFRY POLLOCK
254 2/12/2020 SOUTHWESTERN ELECTRIC POWER COMPANY REBUTTAL TESTIMONIES AND WORKPAPERS
217 1/14/2020 TIEC REDACTED
260 2/14/2020 TIEC REDACTED TEXAS INDUSTRIAL ENERGY CONSUMERS’
344 6/18/2020 EAST TEXAS ELECTRIC COOPERATIVE, INC. REPLY TO EXCEPTIONS TO THE PROPOSAL FOR DECISION OF EAST TEXAS ELECTRIC COOPERATIVE, INC. AND NORTHEAST TEXAS ELECTRIC COOPERATIVE, INC.
87 9/13/2019 SOUTHWESTERN ELECTRIC POWER COMPANY REQUEST FOR IN CAMERA INSPECTION RELATED TO TIEC'S 2ND RFI
349 6/25/2020 EAST TEXAS CHAMBERS OF COMMERCE Request to Speak to PUCT
281 2/24/2020 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO CARD'S 4TH RFI
74 9/9/2019 SOUTHWESTERN ELECTRIC COMPANY RESPONSE TO COMMISSION STAFF'S 1ST RFI
130 10/9/2019 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO COMMISSION STAFF'S SECOND RFI
156 10/23/2019 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO GOLDEN SPREAD ELECTRIC COOPERATIVE INC.'S 1ST RFI
267 2/18/2020 SWEPCO RESPONSE TO GOLDEN SPREAD ELECTRIC COOPERATIVE INC.'S 3RD RFI
214 1/13/2020 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO GSEC`S 2ND RFI
131 10/10/2019 SOUTHWSTERN ELECTRIC POWER COMPANYS RESPONSE TO INTERNATIONAL BROTHERHOOD OF ELCTRICAL WORKERS LOCAL UNION 738'S FIRST RFI
124 10/7/2019 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO OFFICE OF PUBLIC UTILITY COUNSEL'S FIRST RFI
283 2/24/2020 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO OPUC'S 4TH RFI
251 2/3/2020 OPUC RESPONSE TO SWEPCO'S 1ST RFI
209 1/6/2020 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO TIEC'S 12TH RFI
228 1/14/2020 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO TIEC'S 13TH RFI
248 1/28/2020 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO TIEC'S 14TH RFI
280 2/24/2020 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO TIEC'S 17TH RFI
270 2/20/2020 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO TIEC'S 2ND RFI
148 10/22/2019 SWEPCO RESPONSE TO TIEC'S 6TH RFI
184 11/22/2019 SWEPCO RESPONSE TO TIEC'S 7TH RFI
168 10/31/2019 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO TIEC'S 8TH RFI
98 9/17/2019 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO TIEC'S MOTION TO COMPEL
189 12/2/2019 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO TIEC`S 10TH RFI
163 10/28/2019 SOUTHWESTERN ELECTRIC POWER COMPANY RESPONSE TO TIECS' 1ST RFI
326 3/24/2020 TIEC REVISED INITIAL BRIEF
69 8/30/2019 SOUTHWESTERN ELECTRIC POWER COMPANY Revised Privilege Log for TIEC`s 2nd RFI
58 8/26/2019 SOAH SOAH ORDER NO.1- NOTICE OF PREHEARING CONFERENCE
114 9/25/2019 SOAH SOAH ORDER NO.3- GRANTING TIEC'S MOTION TO COMPEL; AMENDING DISCOVERY RESPONSE DEADLINE
262 2/14/2020 SOAH SOAH ORDER NO.4- DIRECTING PARTIES TO PROPOSE AN AGREED BRIEFING OUTLINE
291 3/4/2020 SOAH SOAH ORDER NO.5- ADOPTING BREIFING OUTLINE; SETTING BRIEFING SCHEDULE; SETTING BRIEFING GUIDELINES; ADMITTING EVIDENCE
294 3/6/2020 SOAH SOAH ORDER NO.6 GRANTING REQUEST TO FILE FINDINGS OF FACT AND CONCLUSIONS OF LAW TWO DAYS AFTER BRIEFS ARE FILED
205 1/3/2020 PUC OPDM SOUTHWESTERN ELECTRIC POWER COMPANY'SSUPPLEMENT AL RESPONSE TO GOLDEN SPREAD ELECTRIC COOPERATIVE INC.'S 1ST REQUEST FOR INFORMATION
42 8/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SOUTHWESTERN ELECTRIC POWER COMPANY`S RESPONSE TO TEXAS INDUSTRIAL ENERGY CONSUMERS` SECOND REQUEST FOR INFORMATION
334 6/11/2020 PUC LEGAL STAFF'S EXCEPTIONS TO THE PROPOSAL FOR DECISION
339 6/18/2020 PUC LEGAL STAFF'S REPLIES TO EXCEPTIONS TO THE PROPOSAL FOR DECISION
107 9/23/2019 PUC LEGAL STAFF'S RESPONSE TO SOUTHWESTERN ELECTRIC POWER COMPANY'S LIMITED MOTION FOR RECONSIDERATION OF SOAH ORDER NO. 2
301 3/9/2020 PUC LEGAL STAFF`S INITIAL BRIEF
266 2/18/2020 PUC LEGAL STAFF`S STATEMENT OF POSITION
225 1/14/2020 GOLDEN SPREAD ELECTRIC COOPERATIVE STATEMENT OF POSITION
146 10/15/2019 SWEPCO STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
134 10/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
135 10/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
136 10/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
106 9/20/2019 TIEC STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
94 9/16/2019 SOUTHWESTEN ELECTRIC POWER COMPANY STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
80 9/11/2019 AMERICAN ELECTRIC POWER SERVICE CORP STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
81 9/11/2019 TIEC STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
82 9/11/2019 AMERICAN ELECTRIC POWER SERVICE COPORATION STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
49 8/19/2019 SOUTHWESTERN ELECTRIC POWER COMPANY STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
241 1/6/2020 SWEPCO STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
275 2/21/2020 AMERICAN ELECTRIC POWER SERVICE COPORATION STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
276 2/21/2020 AMERICAN ELECTRIC POWER SERVICE COPORATION STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
286 2/25/2020 SWEPCO STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
287 2/25/2020 SWEPCO STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
288 2/25/2020 SWEPCO STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
206 1/6/2020 SWEPCO STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
207 1/6/2020 SWEPCO STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
208 1/6/2020 SWEPCO STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
174 11/7/2019 SWEPCO STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
175 11/7/2019 SWEPCO STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER
243 1/22/2020 SOUTHWESTERN ELECTRIC POWER COMPANY STATEMENT UNDER SECTION 4 OF PROTECTVE ORDER
170 11/1/2019 SWEPCO STATEMENT UNDER SECTION 4 OF THE PROTECTIVE ORDER
171 11/1/2019 SWEPCO STATEMENT UNDER SECTION 4 OF THE PROTECTIVE ORDER
164 10/30/2019 SOUTHWESTERN ELECTRIC POWER COMPANY STATEMENT UNDER SECTION 4 OF THE PROTECTIVE ORDER
151 10/23/2019 SOUTHWESTERN ELECTRIC POWER COMPANY STATEMENT UNDER SECTION 4 OF THE PROTECTIVE ORDER
152 10/23/2019 SOUTHWESTERN ELECTRIC POWER COMPANY STATEMENT UNDER SECTION 4 OF THE PROTECTIVE ORDER
153 10/23/2019 SOUTHWESTEN ELECTRIC POWER COMPANY STATEMENT UNDER SECTION 4 OF THE PROTECTIVE ORDER
221 1/14/2020 SOUTWESTERN ELECTRIC POWER COMPANY STATEMENT UNDER SECTION 4 OF THE PROTECTIVE ORDER
222 1/14/2020 SOUTWESTERN ELECTRIC POWER COMPANY STATEMENT UNDER SECTION 4 OF THE PROTECTIVE ORDER
115 9/26/2019 SOUTWESTERN ELECTRIC POWER COMPANY STATEMENT UNDER SECTION 4 OF THE PROTECTIVE ORDER
122 10/3/2019 TIEC STATEMENT UNDER SECTION 4 PROTECTIVE ORDER
50 8/19/2019 TEXAS INDUSTRIAL ENERGY CONSUMERS STATEMENT UNDERS SECTION 4 OF PROTECTIVE ORDER
147 10/15/2019 SOUTHWESTEN ELECTRIC POWER COMPANY SUPPLEMENTAL INFORMATION FOR THE PROOF OF NOTICE FILED ON SEPTEMBER 27, 2019
165 10/30/2019 SWEPCO SUPPLEMENTAL RESPONSE TO EAST TEXAS ELECTRCI COOPERATIVE, INC. AND NORTHWEST TEXAS ELECTRIC COOPERATIVE INC.'S 1ST RFI
259 2/14/2020 TIEC SUPPLEMENTAL RESPONSE TO SOUTHWESTERN ELECTRIC POWE COMPANY'S ST RFI
52 8/20/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SUPPLEMENTAL RESPONSE TO TIEC'S 2ND RFI
161 10/28/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SUPPLEMENTAL RESPONSE TO TIEC'S 5TH RFI
166 10/30/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SUPPLEMENTAL RESPONSE TO TIEC`S 7TH RFI
119 9/30/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SUPPLMENTAL RESPONSE TO TIEC'S 2ND RFI
203 12/19/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SUPPLMENTAL RESPONSE TO TIEC'S 5TH RFI 2ND SUPPLEMENTAL RESPONSE NO. TIEC 5-2
202 12/19/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SUPPLMENTAL RESPONSE TO TIEC'S 5TH RFI
245 1/24/2020 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO 1st RFI to OPUC
56 8/23/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO Errata to Testimony and Exhibits
55 8/23/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO Updated Workpapers
246 1/27/2020 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S CORRECTED RESPONSES TO 1-6 AND 1-26
118 9/27/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S PROOF OF NOTICE
303 3/11/2020 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`s Proposed Findings of Fact and Conclusions of Law
95 9/16/2019 SWEPCO SWEPCO`s Proposed Procedural Schedule
310 3/17/2020 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`s Reply Brief
340 6/18/2020 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`s Reply to the Exceptions to the Proposal for Decision
102 9/18/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO CARD`S 1ST RFI
140 10/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO CARD`S 2ND RFI
138 10/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO CARD`S 3RD RFI
70 9/3/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO ETEC-NTEC`S 1ST RFI
199 12/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO ETEC/NTEC`S 2ND RFI
144 10/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO GOLDEN SPREAD`S 1ST RFI
139 10/14/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO OPUC`S 2ND RFI
237 1/15/2020 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO OPUC`S 3RD RFI
213 1/8/2020 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO STAFF`S 3RD RFI
197 12/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO TIEC`S 11TH RFI
273 2/20/2020 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO TIEC`S 15th RFI
277 2/21/2020 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO TIEC`S 16TH RFI
38 8/13/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO TIEC`S 1ST RFI
91 9/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO TIEC`S 3RD RFI
126 10/7/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO TIEC`S 4TH RFI
128 10/8/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO TIEC`S 5TH RFI
154 10/23/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO TIEC`S 7TH RFI
180 11/13/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S RESPONSE TO TIEC`S 9TH RFI
181 11/18/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S SUPPLEMENTAL RESPONSE TO ETEC-NTEC 1-14 RFI
113 9/24/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S SUPPLEMENTAL RESPONSE TO ETEC-NTEC`S 1ST RFI
88 9/13/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S SUPPLEMENTAL RESPONSE TO ETEC-NTEC`S 1ST RFIS 1-8, 1-10 AND 1-15
77 9/10/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S SUPPLEMENTAL RESPONSE TO TIEC 1-16
66 8/29/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S SUPPLEMENTAL RESPONSE TO TIEC`S 1ST QUESTION NOS. 1-11, 1-18 AND 1-19
177 11/8/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S SUPPLEMENTAL RESPONSE TO TIEC`S 7-15
172 11/5/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWEPCO`S SUPPLEMENTAL RESPONSE TO TIEC`S 7-16.
68 8/29/2019 SOUTHWESTERN ELECTRIC POWER COMPANY SWPECO`S SUPPLEMENTAL RESPONSE TO TIEC`S 2ND RFI QUESTION NOS. 2-2 AND 2-7
320 3/19/2020 TIEC TEXAS INDUSTRIAL ENERGY CONSUMERS PROPOSED FINDINGS OF FACT AND CONCLUSIONS OF LAW
296 3/9/2020 TIEC Texas Industrial Energy Consumers` Initial Brief
343 6/18/2020 TIEC TEXAS INDUSTRIAL ENERGY CONSUMERS’ REPLY TO EXCEPTIONS
61 8/27/2019 TIEC THIRD REQUEST FOR INFORMATION TO SWEPCO
211 1/8/2020 SOUTHWESTERN ELECTRIC POWER COMPANY THIRD SUPPLEMENTAL RESPONSE TO TIEC FIFTH RFI
336 6/11/2020 TIEC TIEC`S EXCEPTIONS TO PFD
249 1/31/2020 TIEC TIEC`s Response to SWEPCO-1
324 3/23/2020 TIEC TIEC’s REDACTED Initial Brief to Reflect De-Designation
325 3/23/2020 TIEC TIEC’s Reply Brief to Reflect De-Designation
330 5/11/2020 SOUTHWESTERN ELECTRIC POWER COMPANY Update letter to ALJs re APSC Final Order
240 1/17/2020 EAST TEXAS ELECTRIC COOPERATIVE INC. AND NORTHEAST ELECTRIC COOPERATIVE INC. WORKPAPERS TO THE DIRECT TESTIMONY AND EXHIBITS OF JAMES W. DANIEL
6 7/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY Workpapers to the Direct Testimony of Akarsh Sheilendranath
8 7/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY Workpapers to the Direct Testimony of Jay F. Godfrey
7 7/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY Workpapers to the Direct Testimony of Johannes P. Pfeifenberger
5 7/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY Workpapers to the Direct Testimony of John F. Torpey
12 7/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY Workpapers to the Direct Testimony of John O. Aaron
9 7/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY Workpapers to the Direct Testimony of Joseph G. Deruntz
11 7/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY Workpapers to the Direct Testimony of Kamran Ali
10 7/16/2019 SOUTHWESTERN ELECTRIC POWER COMPANY Workpapers to the Direct Testimony of Karl R. Bletzacker
236 1/15/2020 CITIES ADVOCATING REASONABLE DEREGULATION Workpapers to the Direct Testimony of Scott Norwood on Behalf of CARD
Export to Excel