Filings for 39973



Case Style   APPLICATION OF EL PASO ELECTRIC COMPANY TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR FIVE SOLAR POWER GENERATION PROJECTS

141 filing(s).

Item File Stamp Party Filing Description
1 12/7/2011 EL PASO ELECTRIC COMPANY REQUEST FOR ASSIGNMENT OF DOCKET NUMBER FOR APPLICATION OF EL PASO ELECTRIC COMPANY TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR FIVE SOLAR POWER GENERATION PROJECTS
2 12/9/2011 EL PASO ELECTRIC COMPANY APPLICATION OF EL PASO ELECTRIC COMPANY TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR FIVE SOLAR POWER GENERATION PROJECTS
3 12/9/2011 EL PASO ELECTRIC COMPANY CONFIDENTIAL- EXHIBIT LJB-3 TO THE DIRECT TESTIMONY OF LINDA J. BARKER; BATE STAMP: 1
4 12/9/2011 EL PASO ELECTRIC COMPANY CONFIDENTIAL- EXHIBIT RA-2 TO THE DIRECT TESTIMONY OF RICARDO ACOSTA; BATE STAMP: 1
5 12/9/2011 EL PASO ELECTRIC COMPANY CONFIDENTIAL- EXHIBIT RA-5 TO THE DIRECT TESTIMONY OF RICARDO ACOSTA; BATE STAMP: 1-57
6 12/9/2011 EL PASO ELECTRIC COMPANY CONFIDENTIAL- EXHIBIT RA-6 TO THE DIRECT TESTIMONY OF RICARDO ACOSTA; BATE STAMP: 1-4
7 12/9/2011 EL PASO ELECTRIC COMPANY CONFIDENTIAL- EXHIBIT RA-7 TO THE DIRECT TESTIMONY OF RICARDO ACOSTA; BATE STAMP: 1-1
8 12/12/2011 PUC CADM ORDER NO. 1: REQUIRING RESPONSE, ESTABLISHING INTERVENTION DEADLINE, AND ADOPTING STANDARD PROTECTIVE ORDER
9 12/12/2011 PUC CADM NOTICE OF APPLICATION TO AMEND A CERTIFICATE OF CONVENIENCE AND NECESSITY FOR PROPOSED SOLAR POWER GENERATION PROJECTS
10 12/13/2011 EL PASO ELECTRIC COMPANY ERRATA TO APPLICATION
11 12/13/2011 EL PASO ELECTRIC COMPANY CONFIDENTIAL- EXHIBIT RA-5 TO THE DIRECT TESTIMONY OF RICARDO ACOSTA; BATE STAMP: 1-57
12 12/14/2011 PUC CADM ACKNOWLEDGEMENT OF RECEIPT - FILE NAME:1213B.052
13 12/14/2011 MAYOR OKEY D LUCAS LETTER SUPPORTING EL PASO ELECTRIC COMPANY'S PROPOSAL
14 12/15/2011 TOWN OF VAN HORN LETTER IN SUPPORT OF EL PASO ELECTRIC COMPANY'S PROPOSAL
15 12/20/2011 PUC LEGAL COMMISSION STAFF'S RESPONSE TO ORDER NO. 1
16 12/20/2011 PUC CADM ORDER NO. 2: ADDRESSING SUFFICIENCY AND NOTICE; ESTABLISHING LIMITED PROCEDURAL SCHEDULE
17 12/21/2011 TEXAS INDUSTRIAL ENERGY CONSUMER MOTION TO INTERVENE
18 12/29/2011 EL PASO ELECTRIC COMPANY Proof of Notice
19 1/5/2012 PUC CADM ORDER NO. 3: GRANTING MOTION TO INTERVENE
20 1/5/2012 PUC LEGAL COMMISSION STAFF'S COMMENTS ON EL PASO ELECTRIC'S COMPANY'S PROOF OF NOTICE
21 1/6/2012 PUC CADM ORDER NO. 4: ADDRESSING SUFFICIENCY OF NOTICE
22 1/20/2012 CITY OF EL PASO MOTION TO INTERVENE
23 1/25/2012 PUC LEGAL COMMISSION STAFF'S 1ST RFI TO EL PASO ELECTRIC COMPANY QUESTION NOS. 1-1 THROUGH 1-6
24 1/27/2012 PUC LEGAL COMMISSION STAFF'S RESPONSE TO ORDER NO. 2
25 1/27/2012 PUC CADM ORDER NO. 5: ESTABLISHING PROCEDURAL SCHEDULE
26 1/31/2012 CITY OF EL PASO 1ST RFI TO EL PASO ELECTRIC COMPANY QUESTION NO. CEP 1.1 TO CEP 1.6
27 2/1/2012 PUC CADM ORDER NO. 6: GRANTING MOTION TO INTERVENE
28 2/14/2012 EL PASO ELECTRIC COMPANY Response to Staff 1st RFI
29 2/15/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS 1ST REQUEST FOR INFORMATION TO EL PASO ELECTRIC COMPANY
30 2/17/2012 EL PASO ELECTRIC COMPANY Response to City of El Paso 1st RFI
31 2/17/2012 EL PASO ELECTRIC COMPANY CONFIDENTIAL- RESPONSE TO CEP 1-5, ATTACHMENT 1; BATE STAMP:1
32 2/21/2012 EL PASO ELECTRIC COMPANY RESPONSE TO COMMISSION STAFF'S 1ST SET OF INTERROGATORIES AND REQUEST FOR PRODUCTION OF DOCUMENTS QUESTION NO. 1-6
33 2/27/2012 PARTIES AGREEMENT TO AMEND PROCEDURAL SCHEDULE
34 2/28/2012 PUC CADM ORDER NO. 7: AMENDING PROCEDURAL SCHEDULE
35 2/29/2012 PUC LEGAL COMMISSION STAFF'S 2ND REQUEST FOR INFORMATION TO EL PASO ELECTRIC COMPANY QUESTION NOS. 2-1 THROUGH 2-4
36 3/6/2012 PUC LEGAL PROTECTIVE ORDER CERTIFICATION FOR COMMISSION STAFF
37 3/6/2012 EL PASO ELECTRIC COMPANY Response to TIEC 1st RFI
38 3/14/2012 PUC LEGAL COMMISSION STAFF'S REQUEST FOR HEARING
39 3/19/2012 PUC CADM ORDER OF REFERRAL
40 3/20/2012 EL PASO ELECTRIC COMPANY Response to Staff's 2nd RFI
41 3/20/2012 EL PASO ELECTRIC COMPANY CONFIDENTIAL - RESPONSE TO STAFF'S 2ND RFI; BATE STAMP: 1-33
42 3/20/2012 ARCELORMITTAL USA INC. ET AL JOINT MOTION FOR LEAVE TO INTERVENE
43 3/22/2012 SOAH SOAH ORDER NO. 1: FILING DESCRIPTION AND SETTING PREHEARING CONFERENCE
44 3/28/2012 EL PASO ELECTRIC COMPANY SUPPLEMENTAL RESPONSE TO STAFF'S 2ND SET OF INTERROGATORIES AND REQUEST FOR PRODUCTION OF DOCUMENTS, QUESTION NO. 2-1
45 4/4/2012 PUC LEGAL COMMISSION STAFF'S PROPOSED LIST OF ISSUES
46 4/4/2012 EL PASO ELECTRIC COMPANY PROPOSED LIST OF ISSUES
47 4/6/2012 EL PASO ELECTRIC COMPANY NOTICE OF AGREED SCHEDULE
48 4/10/2012 TEXAS RENEWABLE INDUSTRIES ASSOCIATION Motion for Leave to Intervene
49 4/11/2012 SOAH SOAH ORDER NO. 2: ADOPTING PROCEDURAL SCHEDULE
50 4/16/2012 EL PASO ELECTRIC COMPANY REVISED RESPONSE TO TEXAS INDUSTRIAL ENERGY 'S 1ST RFI; QUESTION NOS. 1-2 & 1-8
51 4/18/2012 PUC CADM DRAFT PRELIMINARY ORDER
52 4/24/2012 ARCELORMITTAL USA INC. ET AL REQUEST FOR REMOVAL OF STEVEN B. HARRIS FROM THE SERVICE LIST
53 5/1/2012 PUC CADM PRELIMINARY ORDER
54 5/1/2012 PUC CADM OUTGOING COMMISSION SIGNED ORDER MAIL LOG
55 5/9/2012 PUC LEGAL COMMISSION STAFF'S 3RD RFI TO EL PASO ELECTRIC COMPANY QUESTION NO. 3-1
56 5/9/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS 2ND SET OF RFI TO EL PASO ELECTRIC COMPANY
57 5/9/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS NOTICE OF INTENTION TO TAKE THE ORAL TELEPHONE DEPOSITION OF JOHN A. WHITACRE AND SUBPOENA DUCES TECUM
58 5/9/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS NOTICE OF INTENTION TO TAKE THE ORAL TELEPHONE DEPOSITION OF RICHARDO ACOSTA AND SUBPOENA DUCES TECUM
59 5/9/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS NOTICE OF INTENTION TO TAKE THE ORAL TELEPHONE DEPOSITION OF EVAN EVANS AND SUBPOENA DUCES TECUM
60 5/16/2012 EL PASO ELECTRIC COMPANY Rocky Miracle Adoption of John A. Whitacre Testimony
61 5/16/2012 EL PASO ELECTRIC COMPANY 1ST RFA AND RFI TO TEXAS INDUSTRIAL ENERGY CONSUMERS
62 5/22/2012 PUC LEGAL PROTECTIVE ORDER CERTIFICATION OF ADRIAN EISSLER
63 5/29/2012 EL PASO ELECTRIC COMPANY RESPONSE TO STAFF'S 3RD RFI
64 5/29/2012 EL PASO ELECTRIC COMPANY CONFIDENTIAL- RESPONSE TO STAFF 3-1 ATTACHMENT 1 ; BATE STAMP: 1-26
65 5/29/2012 EL PASO ELECTRIC COMPANY RESPONSE TO TIEC'S 2ND SET OF RFI
66 5/29/2012 EL PASO ELECTRIC COMPANY CONFIDENTIAL- RESPONSE TO TIEC 2-2, ATTACHMENTS 1 THROUGH 2 ; BATE STAMP : 1-3 & CD
67 5/29/2012 EL PASO ELECTRIC COMPANY CONFIDENTIAL- RESPONSE TO TIEC 2-1, ATTACHMENTS 1 THROUGH 4 ; BATE STAMP : 1-20 & CD
68 5/29/2012 EL PASO ELECTRIC COMPANY CONFIDENTIAL- HS - RESPONSE TO TIEC 2-8, ATTACHMENTS 1 AND 2 ; BATE STAMP : 1-27
69 5/30/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS DEPOSITION OF WITNESS RICARDO ACOSTA & EXHIBITS; TRANSCRIPT (REDACTED)
70 5/30/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS CONFIDENTIAL - DEPOSITION TRANSCRIPT OF RICARDO ACOSTA AND TIEC DEPOSITION EXHIBIT 16A; BATE STAMP: 0001 to 0005
71 5/30/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS CONFIDENTIAL - DEPOSITION TRANSCRIPT OF RICARDO ACOSTA AND TIEC DEPOSITION EXHIBIT 21A; BATE STAMP: 0001 to 0046
72 5/30/2012 CENTRAL RECORDS DUPLICATE OF ITEM # 74
73 5/30/2012 EL PASO ELECTRIC COMPANY STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER DESIGNATING CONFIDENTIAL AND HIGHLY SENSITIVE PROTECTED MATERIALS
74 5/30/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS EVANS DEPOSITION TRANSCRIPT
75 5/30/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS WHITACRE DEPOSITION TRANSCRIPT
76 5/30/2012 TEXAS RENEWABLE ENERGY INDUSTRIES ASSOCIATION STATEMENT OF POSITION
77 5/30/2012 TEXAS RENEWABLE ENERGY INDUSTRIES ASSOCIATION MOTION FOR LEAVE TO INTERVENE
78 5/30/2012 CITY OF EL PASO DIRECT TESTIMONY OF MARTIN E. HOWELL
79 5/30/2012 JUWI SOLAR INC COMMENTS
80 6/4/2012 CITY OF EL PASO 1ST RFI TO TIEC QUESTIONS NO. CEP 1-1 TO CEP 1-2
81 6/4/2012 SOAH SOAH ORDER NO. 3 : GRANTING MOTION TO INTERVENE
82 6/5/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS RESPONSE TO EL PASO ELECTRIC COMPANY'S 1ST RFA AND RF I
83 6/6/2012 PUC LEGAL DIRECT TESTIMONY OF REBECCA REED
84 6/11/2012 EL PASO ELECTRIC COMPANY STATEMENT UNDER SECTION 4 OF PROTECTIVE ORDER DESIGNATING CONFIDENTIAL AND HIGHLY SENSITIVE PROTECTED MATERIALS
85 6/11/2012 EL PASO ELECTRIC COMPANY SUPPLEMENTAL RESPONSE TO TIEC'S 2ND SET OF RFI; QUESTION NO. TIEC 2-8
86 6/11/2012 EL PASO ELECTRIC COMPANY CONFIDENTIAL - SUPPLEMENTAL RESPONSE TO TIEC'S 2-8, ATTACHMENT 1; BATE STAMP: 1 of 13 THROUGH 13 of 13
87 6/11/2012 EL PASO ELECTRIC COMPANY CONFIDENTIAL - SUPPLEMENTAL RESPONSE TO TIEC'S 2-8, ATTACHMENT 2; BATE STAMP: 1 of 14 THROUGH 14 of 14
88 6/13/2012 EL PASO ELECTRIC COMPANY Rebuttal Testimony and Exhibits
89 6/13/2012 TEXAS RENEWABLE ENERGY INDUSTRY ASSOCIATION Cross-Rebuttal Testimony of Russel E. Smith
90 6/14/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS STATEMENT OF POSITION
91 6/15/2012 SENATOR JOSE R. RODRIGUEZ COMMENTS
92 6/15/2012 PUC LEGAL STAFF'S STATEMENT OF POSITION
93 6/15/2012 PUC LEGAL COMMISSION STAFF'S MOTION TO CERTIFY ISSUES AND ABATE THE PROCEEDING
94 6/18/2012 EL PASO COMMUNITY COLLEGE COMMENTS ON THE PROPOSAL OF THE FIVE SOLAR POWER GENERATION PROJECTS
95 6/19/2012 EL PASO ELECTRIC COMPANY RESPONSE TO STAFF'S MOTION TO CERTIFY ISSUES AND ABATE THE PROCEEDING AND EPE'S REQUEST FOR EXPEDITED RULING
96 6/20/2012 SOAH SOAH ORDER NO. 4: DENYING MOTIONS TO CERTIFY ISSUES AND ABATE THE PROCEEDING
97 6/25/2012 EL PASO ELECTRIC COMPANY AGREED SCHEDULE FOR POST HEARING BRIEFS
98 6/25/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS RESPONSE TO CITY OF EL PASO'S 1ST RFI
99 7/3/2012 SOAH SOAH ORDER NO. 5 : ESTABLISHING BRIEFING SCHEDULE
100 7/10/2012 KENNEDY REPORTING SERVICE HEARING ON THE MERITS, WEDNESDAY, JUNE 20, 2012
101 7/16/2012 REPRESENTATIVE NAOMI R GONZALEZ LETTERS TO CHAIRMAN AND COMMISSIONERS SUPPORTING EL PASO ELECTRIC COMPANY'S APPLICATION
102 7/26/2012 PUC LEGAL COMMISSION STAFF`S INITIAL BRIEF
103 7/26/2012 EL PASO ELECTRIC COMPANY Initial Brief
104 7/26/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS INITIAL POST HEARING BRIEF
105 7/26/2012 CITY OF EL PASO INITIAL BRIEF
106 7/27/2012 PUC EXECUTIVE DIRECTOR RESPONSE TO REPRESENTATIVE GONZALEZ LETTER
107 7/27/2012 TEXAS RENEWABLE INDUSTRIES ASSOCIATION (FILED 6/26/12) INITIAL BRIEF
108 7/30/2012 TEXAS RENEWABLE ENERGY INDUSTRY ASSOCIATION REQUEST FOR LEAVE TO FILE CORRECTED INITIAL BRIEF
109 7/30/2012 TEXAS RENEWABLE ENERGY INDUSTRIES ASSOCIATION CORRECTED INITIAL BRIEF
110 8/9/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS REPLY BRIEF
111 8/9/2012 PUC LEGAL COMMISSION STAFF`S REPLY BRIEF
112 8/9/2012 PUC LEGAL COMMISSION STAFF AND TEXAS INDUSTRIAL ENERGY CONSUMERS' JOINTLY PROPOSED FINDINGS OF FACT AND CONCLUSIONS OF LAW
113 8/9/2012 CITY OF EL PASO REPLY BRIEF
114 8/9/2012 EL PASO ELECTRIC COMPANY Reply Brief
115 8/9/2012 TEXAS RENEWABLE ENERGY INDUSTRIES ASSOCIATION REPLY BRIEF
116 9/28/2012 SOAH PROPOSAL FOR DECISION
117 10/1/2012 PUC CADM PLEASE BE ADVISED THAT THE PROPOSAL FOR DECISION ISSUED ON SEPTEMBER 28, 2012 WILL BE CONSIDERED BY THE COMMISSIONERS AT THE OPEN MEETING SCHEDULED FOR OCTOBER 25, 2012
118 10/4/2012 SOAH CERTIFIED EXHIBITS LIST
119 10/10/2012 EL PASO ELECTRIC COMPANY EXCEPTIONS TO THE PROPOSAL FOR DECISION
120 10/10/2012 PUC LEGAL COMMISSION STAFF`S EXCEPTIONS
121 10/10/2012 TIEC EXCEPTIONS TO PROPOSAL FOR DECISION
122 10/16/2012 TIEC REQUEST FOR ORAL ARGUMENT
123 10/17/2012 CITY OF EL PASO REPLIES TO EXCEPTIONS
124 10/17/2012 PUC LEGAL STAFF HAS NO RESPONSE TO THE PROPOSAL FOR DECISION
125 10/17/2012 TEXAS INDUSTRIAL ENERGY CONSUMERS REPLY TO EL PASO ELECTRIC COMPANY EXCEPTIONS TO THE PROPOSAL FOR DECISION
126 10/17/2012 EL PASO ELECTRIC COMPANY REPLY TO EXCEPTIONS TO THE PROPOSAL FOR DECISION
127 10/17/2012 TEXAS RENEWABLE ENERGY INDUSTRIES ASSOCIATION REPLY TO EXCEPTIONS
128 10/19/2012 TIEC LETTER REGARDING RESPONSE TO EL PASO ELECTRIC COMPANY
129 10/22/2012 EL PASO ELECTRIC COMPANY MOTION TO ALLOW LATE FILING OF PLEADING; MOTION TO STRIKE TIEC'S LETTER IN RESPONSE TO EPE'S REPLY TO EXCEPTIONS; AND IN THE ALTERNATIVE, RESPONSE TO TIEC'S RESPONSE TO EPE'S REPLY TO EXCEPTIONS
130 10/23/2012 SOAH LETTER REGARDING THE PROPOSAL FOR DECISION
131 10/23/2012 PUC CADM THE COMMISSIONERS HAVE VOTED TO HEAR ORAL ARGUMENT AT THE THURSDAY, OCTOBER 25, 2012 OPEN MEETING AGENDA
132 11/9/2012 PUC CADM THE ABOVE REFERENCED DOCKET HAS BEEN PLACED ON THE AGENDA OF THE OPEN MEETING SCHEDULED FOR NOVEMBER 16,2012
133 12/10/2012 PUC CADM FINAL ORDER
134 12/10/2012 PUC CADM OUTGOING COMMISSION-SIGNED ORDER MAIL LOG
135 3/25/2013 PUC CADM CITY EXHIBITS-1.(RETURNED FROM CADM)
136 3/25/2013 PUC CADM EL PASO ELECTRIC- EXHIBITS-1, 2, 3, 4-5.(RETURNED FROM CADM)
137 3/25/2013 PUC CADM CONFIDENTIAL-EL PASO ELECTRIC- EXHIBITS-2A, 2B, 2C, 2D, 3A.(RETURNED FROM CADM)
138 3/25/2013 PUC CADM STAFF- EXHIBITS-1-13.(RETURNED FROM CADM)
139 3/25/2013 PUC CADM TIEC- EXHIBITS-1, 1A, 2, 2A, 3, 3A, 4-10.(RETURNED FROM CADM)
140 3/25/2013 PUC CADM CONFIDENTIAL-TIEC- EXHIBITS-3B, 3C, 3D, 3E, 3F, 10A, 10B.(RETURNED FROM CADM)
141 3/25/2013 PUC CADM TREIA- EXHIBITS-1.(RETURNED FROM CADM)
Export to Excel